KitLog pro

Powered By Kitlog Pro v2.0

Jeff's RV14A Builder's Log
Work Logs Found: 14
Category Work Time: 24 Hours
 Date
Hours
Work Log Summary

Details

 08-14-2017
6.00
Purge valve piping and hoses
Details

 08-12-2017
0.75
Sniffle valve, tbing line install

 08-12-2017
1.50
Sniffle valve tubing line prep

 08-11-2017
1.00
SCAT ducting to oil cooler, RTV chafe strip

 08-11-2017
2.00
Install Garmin engine transducers

 08-10-2017
0.25
Oil cooler hoses install

 08-09-2017
2.00
Oil cooler install prep

 08-09-2017
1.00
Oil cooler hoses install

 08-09-2017
3.00
Oil cooler and inlet ramp assembly, install

 08-09-2017
0.25
Fuel line, firewall to fuel pump

 08-04-2017
1.50
Breather hose prep and install

 07-26-2017
1.00
Fuel pump connections and hoses

 07-20-2017
2.75
Fule flow transducer to servo, oil cooler brackets

 12-31-1969
1.00
Oil pressure sensor hose install










Copyright © 2001-2024 Matronics. All Rights Reserved.