KitLog pro

Powered By Kitlog Pro v2.0

Jeff's RV14A Builder's Log
Work Logs Found: 24
Category Work Time: 105 Hours
 Date
Hours
Work Log Summary

Details

 08-29-2017
1.00
Prep, assemble cyl 1 and 3 baffles

 08-20-2017
1.00
Prep and install magneto cooling tubing

 08-20-2017
1.00
Install 1" dia tubing flanges on rear baffle
Details

 08-09-2017
2.50
Prep and attach baffle tension rods

 08-09-2017
1.50
Attach cowling baffle seals

 08-06-2017
1.50
Prep and attach right air ramp baffle cone

 08-06-2017
1.50
Prep and attach left air ramp baffle cone

 08-04-2017
8.00
Snorkel-to-filter flange
Details

 08-04-2017
6.00
Snorkel alternate air gate

 08-04-2017
60.00
Prep, attach snorkel(s
Details

 08-03-2017
0.01
Various engine baffle pics
       

 08-03-2017
0.01
more engine baffle pics
       

 08-02-2017
1.50
Attach forward baffles

 08-01-2017
2.00
Apply RTV sealants, ivet left front baffle

 08-01-2017
2.00
Apply RTV sealant, attach aft baffles

 07-30-2017
1.50
Prep, assemble aft center bracket and attach

 07-30-2017
1.50
Prep left air ramp, air filter frame

 07-30-2017
0.50
Install right forward baffle

 07-30-2017
1.00
Assemble right air ramp

 07-30-2017
1.00
Assemble left forward baffle

 07-29-2017
0.75
Prep, assemble right aft baffle

 07-29-2017
1.25
Prep, assemble left aft baffle, attach cyl 4 baffl

 07-29-2017
1.25
Prep, assemble cyl 3 bridge

 07-28-2017
7.00
Prep parts
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.