|
|
|
|
Jeff's RV14A Builder's Log
Work
Logs
Found:
24
|
Category Work Time: 105 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
08-29-2017
|
1.00
|
Prep, assemble cyl 1 and 3 baffles
|
|
|
|
08-20-2017
|
1.00
|
Prep and install magneto cooling tubing
|
|
|
|
08-20-2017
|
1.00
|
Install 1" dia tubing flanges on rear baffle
|
Details
|
|
|
08-09-2017
|
2.50
|
Prep and attach baffle tension rods
|
|
|
|
08-09-2017
|
1.50
|
Attach cowling baffle seals
|
|
|
|
08-06-2017
|
1.50
|
Prep and attach right air ramp baffle cone
|
|
|
|
08-06-2017
|
1.50
|
Prep and attach left air ramp baffle cone
|
|
|
|
08-04-2017
|
8.00
|
Snorkel-to-filter flange
|
Details
|
|
|
08-04-2017
|
6.00
|
Snorkel alternate air gate
|
|
|
|
08-04-2017
|
60.00
|
Prep, attach snorkel(s
|
Details
|
|
|
08-03-2017
|
0.01
|
Various engine baffle pics
|
|
|
|
08-03-2017
|
0.01
|
more engine baffle pics
|
|
|
|
08-02-2017
|
1.50
|
Attach forward baffles
|
|
|
|
08-01-2017
|
2.00
|
Apply RTV sealants, ivet left front baffle
|
|
|
|
08-01-2017
|
2.00
|
Apply RTV sealant, attach aft baffles
|
|
|
|
07-30-2017
|
1.50
|
Prep, assemble aft center bracket and attach
|
|
|
|
07-30-2017
|
1.50
|
Prep left air ramp, air filter frame
|
|
|
|
07-30-2017
|
0.50
|
Install right forward baffle
|
|
|
|
07-30-2017
|
1.00
|
Assemble right air ramp
|
|
|
|
07-30-2017
|
1.00
|
Assemble left forward baffle
|
|
|
|
07-29-2017
|
0.75
|
Prep, assemble right aft baffle
|
|
|
|
07-29-2017
|
1.25
|
Prep, assemble left aft baffle, attach cyl 4 baffl
|
|
|
|
07-29-2017
|
1.25
|
Prep, assemble cyl 3 bridge
|
|
|
|
07-28-2017
|
7.00
|
Prep parts
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |