Steve's CH750 Cruzer (N750SB)
Work Logs Found: 24
Category Work Time: 96 Hours
 Date
Hours
Work Log Summary

Details

 12-18-2018
1.50
Final Windshield Attatch
Details

 12-13-2018
1.00
Sealing windshield
Details
     

 10-21-2018
0.25
Finished riveting rear windows
Details
     

 10-17-2018
1.75
Started install of rear windows
Details
     

 10-01-2018
7.25
Installed new pilot side bubble door
Details
     

 09-30-2018
10.75
Installed new passenger side bubble
Details
     

 09-05-2018
5.00
Sanded/polished out adhesive dribbles
Details
     

 08-25-2018
2.75
Attached dash cover, gluing moulding to windshield
Details
       

 08-24-2018
1.50
Cut dashboard material before attaching windshield
Details
       

 08-18-2018
4.25
Attach canopy window
Details
       

 08-01-2018
7.00
Finished bubble doors (for now)
Details
       

 07-14-2018
5.50
Passenger side latches
Details

 07-11-2018
1.00
Position pass bubble on door
Details

 07-09-2018
8.00
Drilling bubble doors
Details
       

 06-26-2018
3.50
Finished drilling overhead window
Details

 06-24-2018
2.75
Began overhead window install
Details
     

 06-22-2018
8.25
Completed windshield fitting
Details
     

 06-16-2018
1.50
Started windshield trim and fit
Details
       

 05-26-2018
1.25
Initial windshield fit
Details
       

 11-10-2017
4.00
Door frames
Details
     

 10-29-2017
2.75
Door frame reinforcing brackets
Details
     

 10-28-2017
6.50
Outer door frame
Details
       

 10-27-2017
4.75
More door frame/hinge work
Details
     

 10-20-2017
3.75
Started on cabin doors
Details
     