MIKE'S WEB SITE
Work Logs Found: 52
Category Work Time: 137 Hours
 Date
Hours
Work Log Summary

Details

 05-10-2018
1.50
Faerigns
Details

 05-09-2018
1.50
Tail cone
Details

 05-07-2018
1.50
prepped tail cone screen
Details

 04-25-2018
0.75
Trevor Phillips Pearcson
Details

 04-20-2018
3.00
rivited tail cone to fselage
Details

 04-19-2018
3.00
Began installation of vertical stabilizer
Details

 04-17-2018
3.00
put the compass in the emponage
Details

 04-10-2018
3.00
Caliper Brake Lines
Details
       

 03-26-2018
3.00
Guide Block
Details

 02-15-2018
1.25
Drilled and clechoed
Details

 02-14-2018
1.25
sanded
Details

 02-09-2018
1.25
redid the control sticks
Details

 02-05-2018
1.25
Taped
Details

 01-22-2018
1.50
Tail Cone Top Skin
Details

 01-18-2018
3.00
worked on empennage pieces
Details

 01-10-2018
1.25
Clechoed and Riveted
Details

 01-09-2018
1.25
Cut and Ribbeted
Details

 12-13-2017
3.75
Tunnel Assembly
Details
       

 12-13-2017
3.75
Added Nutplates to F1205B-L and F1205B-R; Then riv
Details
       

 12-12-2017
3.75
Countersunk F-1205B-L, F-1205B-R, and F-1272
Details
       

 12-06-2017
3.00
Deburr
Details

 12-04-2017
3.00
Emmpennage
Details

 11-27-2017
1.50
Countersunk
Details
     

 11-08-2017
3.75
Tail Cone
Details
     

 11-07-2017
3.75
Tailcone
Details
       

 11-06-2017
3.75
Tail Cone
Details
       

 11-03-2017
1.50
Rivet and debbured
Details
     

 11-02-2017
1.50
Deburred
Details
       

 10-30-2017
3.00
Final drilled and added Counterbalance
Details
       

 10-27-2017
3.00
Worked on Rudder
Details

 10-23-2017
3.00
Main Skin Installation
Details
       

 10-20-2017
3.75
riveted the top of the stabilator
Details
       

 10-19-2017
3.75
gapped and loosly attached the trim tabs
Details
       

 10-18-2017
3.75
Finishing taking off the protection
Details
       

 10-17-2017
3.75
Horz. Stabalitor
Details
       

 10-09-2017
1.00
manual riveting, final drilling, and deburring
Details
     

 10-06-2017
1.50
Clechoed and matched and final drilled
Details
       

 10-05-2017
1.50
Deburred and riveted and fasened
Details
       

 10-04-2017
1.00
Deburred
Details
     

 10-02-2017
1.50
Riveted
Details
       

 09-27-2017
1.50
Dimple nutplate
Details

 09-26-2017
1.50
deburring
Details

 09-23-2017
10.50
Vertical Stabalizer
Details
       

 09-22-2017
3.75
Vertical Stabalizer
Details
       

 09-21-2017
3.75
Vertical Stabalizer
Details
       

 09-20-2017
3.75
Vertical Stabalizer
Details
       

 09-19-2017
3.75
Vertical Stabalizer
Details
       

 09-15-2017
1.25
Vertical Stabilizer
Details

 09-14-2017
2.50
Vertical Stabilizer
Details
       

 09-13-2017
2.50
Vertical Stabilzer
Details
       

 09-12-2017
2.50
Vertical Stabilizer
Details
       

 09-08-2017
3.75
GAthered parts and Cleco them
Details