05-17-2018
1.50
Attached Aft Window
Details
05-16-2018
6.00
worked on fuselage
Details
05-16-2018
3.75
canopy
Details
05-15-2018
1.50
seat
Details
05-15-2018
3.75
guide
Details
05-14-2018
4.50
worked on cannopy hatch handle
Details
05-14-2018
3.00
Wings and Connector
Details
05-14-2018
2.75
Perstoion and trevor
Details
05-14-2018
1.75
intrument wire panel
Details
05-14-2018
1.45
Cabin Heat Line
Details
05-14-2018
3.00
attached the turtle skin
Details
05-09-2018
3.00
worked on engine and attached canopy
Details
05-08-2018
3.00
worked on fuselage
Details
05-08-2018
1.50
Details
05-07-2018
3.00
worked on fuselage
Details
05-04-2018
3.00
finish brake tubes
Details
05-03-2018
1.50
attached the steps
Details
05-02-2018
6.00
routed brake lines
Details
05-01-2018
3.00
made the brake lines
Details
05-01-2018
1.50
drilling
Details
04-30-2018
1.50
marked canopy
Details
04-30-2018
1.50
Attached rudder cables to rudder pedals
Details
04-26-2018
1.50
Riveted part of cannopy
Details
04-26-2018
3.00
Brakes
Details
04-26-2018
1.50
Aft window fit and clecoe
Details
04-24-2018
1.50
Lower Tailcone
Details
04-24-2018
3.75
empenage to fuselage
Details
04-23-2018
7.00
worked on fuselage and fuel tank
Details
04-23-2018
2.50
installed comms and battery
Details
04-19-2018
1.50
continued working on installing fuel lines
Details
04-19-2018
3.00
Cleco
Details
04-18-2018
3.00
Servo
Details
04-18-2018
3.50
attaching tail and fuselage
Details
04-17-2018
1.50
started bending tubes
Details
04-17-2018
3.00
Finished installing rudder wire clamps
Details
04-17-2018
3.75
attaching tail cone anf fuselage
Details
04-16-2018
4.50
tighten screws
Details
04-13-2018
1.50
worked on brake lines
Details
04-13-2018
2.00
Rerouting pitotstatic line
Details
04-13-2018
3.00
Caliper Brake Lines
Details
04-13-2018
5.00
attatched the tail cone to the fuselage
Details
04-12-2018
3.00
Attachment
Details
04-10-2018
1.50
worked on engine cowling
Details
04-10-2018
3.75
break lines
Details
04-09-2018
1.50
Worked on engine cowling
Details
04-09-2018
1.50
Mounting rear landing gear struts
Details
04-09-2018
3.75
installed rudder cables
Details
04-09-2018
3.00
Attach Main Gear Axles
Details
04-06-2018
3.00
Tightened Bolts
Details
04-06-2018
4.50
started working on the landing gear
Details
04-06-2018
3.00
looked for parts
Details
04-06-2018
3.00
Flight Controls
Details
04-05-2018
1.50
Landing gear mounting brackets
Details
04-05-2018
2.75
Flight Controls
Details
04-05-2018
3.00
cut and debur
Details
04-04-2018
3.00
Tapped and Drill Pressed
Details
04-04-2018
3.00
Reinstalled Flap Handle Assembly
Details
04-04-2018
3.75
Isaac and trevor
Details
04-03-2018
3.00
Installed Flap Handle Assembly
Details
04-02-2018
3.00
located parts, bolts
Details
03-28-2018
3.00
Guide Block
Details
03-26-2018
3.00
Wire Harness
Details
03-14-2018
1.50
Installed Nutplate
Details
03-14-2018
5.00
fuse
Details
03-13-2018
5.00
Details
03-12-2018
3.75
wiring
Details
03-09-2018
3.00
Oil Door Hinge
Details
03-08-2018
3.00
Cowl
Details
03-07-2018
3.00
Oil Door Camlocks
Details
03-06-2018
3.00
Cowling Nutplates
Details
02-27-2018
3.75
wiring harness author by isaac j
Details
02-21-2018
3.00
worked on cowl farings
Details
02-19-2018
4.50
deburred fuselage pieces
Details
02-14-2018
1.25
trimmed flanges
Details
02-05-2018
3.00
Assembling flap handle
Details
02-02-2018
3.00
worked on the flap handle bracket
Details
02-01-2018
3.00
worked on firewall
Details
01-31-2018
3.00
worked on fuelsalage
Details
01-30-2018
3.00
worked on flap hand assembly
Details
01-29-2018
3.00
assembled parts for fuselage
Details
01-24-2018
1.50
Fuel Lines
Details
01-23-2018
1.50
Fuel Lines
Details
01-18-2018
3.00
Rivited and Deburred
Details
01-18-2018
1.50
Cleco and rivet
Details
01-08-2018
1.50
Match drilled and rivited hinges onto firewall
Details
12-15-2017
2.50
Fuselage Side Skins
Details
12-15-2017
3.75
Deburred and attached left fuselage SKIN
Details
12-14-2017
2.50
Tunnel Assembly
Details
12-14-2017
3.75
Clecoed Skin (F-1270-L) to fuselage
Details
12-12-2017
2.50
Tunnel Assembly
Details
12-11-2017
2.50
Tunnel Assembly
Details
12-08-2017
7.50
Rivited and Dempled
Details
12-07-2017
1.00
nut plates
Details
12-07-2017
3.00
Installing Step Floors
Details
12-06-2017
4.50
Rivited
Details
12-06-2017
1.00
dimple
Details
12-05-2017
7.50
Clecod and dimpled
Details
12-04-2017
4.50
Rivited and Deburred
Details
12-01-2017
3.50
riveted bulkheadand ribs onto aft of plane and put
Details
11-28-2017
1.50
deburred and rivited bulkhead
Details
11-27-2017
4.00
we debured and cut apart fusalage sub assemblys
Details
11-14-2017
4.50
Rivited and Deburred
Details
11-12-2017
3.75
Riveted and Countersunk F1213-R and F1212-L
Details
11-10-2017
3.75
started deburring part 1225-r
Details
11-06-2017
3.75
seat rib assembly
Details
11-06-2017
3.50
deburred, found parts
Details
11-03-2017
1.50
deburred, dimpled, and finished pulling on baggage
Details
11-02-2017
1.50
Riveted floor to bulkhead
Details
11-01-2017
1.00
debured 8 parts. and solid rivited f-1224 to the b
Details
10-31-2017
1.50
Dimpled baggedge floor
Details
09-14-2017
3.75
Drilled holes into the Bulkhead
Details
09-13-2017
3.75
Worked on Center Bulk Head
Details
09-12-2017
3.75
Worked on Center Section Bulkhead
Details
09-08-2017
3.75
Forward Bulkhead
Details
03-05-2017
3.00
Top Cowl Oil Door
Details
SITE NAVIGATION
Contact Builder
RV12 Home
Category
# Logs
# Hours
All
312
940
Avionics
16
48
Empennage
52
137
Engine
24
55
Flaperon
2
4
Fuselage
115
343
Miscellaneous
50
181
None
2
2
Prop
1
2
rudder
3
12
stabilizer
2
4
Wings
45
152