KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
Work Logs Found: 58
Category Work Time: 239 Hours
 Date
Hours
Work Log Summary

Details

 03-15-2022
3.50
Install tail faring nutplates

 03-01-2022
6.50
Fitting horz stab/vert stab faring

 02-28-2022
8.00
Working on fitting the fiberglass faring

 02-25-2022
9.00
Worked on troubleshooting the pitch trim. Fixed.

 02-24-2022
7.50
Installing and adjusting rudder land horz stab.

 02-23-2022
7.00
Working on installing the tail feathers

 02-21-2022
2.00
Inastall the Vertical stabalizer

 05-03-2018
4.00
mak elevator push tube, and finish horz stab parts

 04-26-2018
3.00
Begin riveting the top on the rear fuselage.
     

 04-19-2018
2.00
start riveting the rest of the horz stab together

 04-16-2018
4.00
Installing pitch trim

 04-04-2018
2.00
Riveting rear deck

 03-27-2018
3.00
Working on assembling the elevator trim assembly

 12-21-2017
6.00
Finish riveting the horz stab ribs and the rear sp
     

 12-20-2017
7.00
Continue riveting the Horz stab.
     

 12-19-2017
6.00
Begin riveting the Horz Stab
     

 12-18-2017
8.00
Countersink horz stab spars and begin riveting
     

 12-08-2017
4.00
Horz stab - finish dimpling skins and ribs

 12-07-2017
1.00
Started dimpling the Horz stab skins

 12-06-2017
6.00
Match drilling horz stab holes. make position for

 12-01-2017
6.50
Horz stab cleko'd together
       

 11-22-2017
3.00
Horz stab forward spar partially riveted
     

 11-20-2017
3.00
Working on the horz stab front spar.

 11-17-2017
5.00
Begin assembling parts for the horz stab

 11-14-2017
4.00
Installed trim tabs on both elevators
     

 11-08-2017
1.50
Finished dimpling, and using tank sealing on tabs
     

 11-07-2017
3.00
Elevator trim tabs. Flattening and start riveting

 11-06-2017
2.00
Finished Riveting the trailing edge of the L eleva

 11-02-2017
8.00
Finished riveting the R elevator
     

 11-01-2017
8.00
Working on the L elevator
     

 10-31-2017
1.50
Finish riveting the R elevator except for the trim

 10-30-2017
3.00
Finished riveting the Right elevator
     

 10-27-2017
3.50
Almost finished riveting the right elevator

 10-26-2017
4.00
Still riveting right elevator

 10-25-2017
7.00
Riveting R Horz. stabalator

 10-24-2017
2.00
Continue dimpling and countersinking R. elevator.

 10-23-2017
4.50
Dimpling and match drilling

 10-20-2017
2.50
continue match drilling elevators

 10-18-2017
0.50
Partial drilling of skin holes to size #40.

 10-11-2017
2.00
Pput skin and horns on both elevators

 10-10-2017
1.00
Continue assemb;ing the elevators

 10-02-2017
6.00
Assemblying parts for the elevators
     

 09-28-2017
1.00
deburring and prep for elevator ribs

 09-22-2017
1.00
Fiberglassing rudder top cap

 09-20-2017
4.00
Rudder bottom cap
Details
     

 09-19-2017
3.00
Rudder cap
Details

 09-18-2017
4.00
Finished rudder
Details
     

 09-14-2017
4.50
Rudder
Details
     

 09-13-2017
3.00
riveted the two sides of the rudder together
Details
     

 09-12-2017
6.00
Riveted rudder skins to the ribs
     

 09-11-2017
7.00
Rudder prep
Details
       

 09-08-2017
3.50
Finished vert stab
Details
     

 09-07-2017
3.00
Cutting and deburring parts for the rudder

 09-06-2017
6.00
Skin almost ready to install
Details
     

 09-05-2017
3.00
working on vertical stabalizer
     

 09-01-2017
3.00
Wsork on vert stab spar

 08-31-2017
4.00
Finished inventorying all the tail kit contents
     

 08-24-2017
2.00
Received tail kit box from Vans
     










Copyright © 2001-2024 Matronics. All Rights Reserved.