Powered By Kitlog Pro v2.0
Norris's RV Construction
RV10
10 Empennage
Work Logs Found:
58
Category Work Time:
239 Hours
Date
Hours
Work Log Summary
Details
03-15-2022
3.50
Install tail faring nutplates
03-01-2022
6.50
Fitting horz stab/vert stab faring
02-28-2022
8.00
Working on fitting the fiberglass faring
02-25-2022
9.00
Worked on troubleshooting the pitch trim. Fixed.
02-24-2022
7.50
Installing and adjusting rudder land horz stab.
02-23-2022
7.00
Working on installing the tail feathers
02-21-2022
2.00
Inastall the Vertical stabalizer
05-03-2018
4.00
mak elevator push tube, and finish horz stab parts
04-26-2018
3.00
Begin riveting the top on the rear fuselage.
04-19-2018
2.00
start riveting the rest of the horz stab together
04-16-2018
4.00
Installing pitch trim
04-04-2018
2.00
Riveting rear deck
03-27-2018
3.00
Working on assembling the elevator trim assembly
12-21-2017
6.00
Finish riveting the horz stab ribs and the rear sp
12-20-2017
7.00
Continue riveting the Horz stab.
12-19-2017
6.00
Begin riveting the Horz Stab
12-18-2017
8.00
Countersink horz stab spars and begin riveting
12-08-2017
4.00
Horz stab - finish dimpling skins and ribs
12-07-2017
1.00
Started dimpling the Horz stab skins
12-06-2017
6.00
Match drilling horz stab holes. make position for
12-01-2017
6.50
Horz stab cleko'd together
11-22-2017
3.00
Horz stab forward spar partially riveted
11-20-2017
3.00
Working on the horz stab front spar.
11-17-2017
5.00
Begin assembling parts for the horz stab
11-14-2017
4.00
Installed trim tabs on both elevators
11-08-2017
1.50
Finished dimpling, and using tank sealing on tabs
11-07-2017
3.00
Elevator trim tabs. Flattening and start riveting
11-06-2017
2.00
Finished Riveting the trailing edge of the L eleva
11-02-2017
8.00
Finished riveting the R elevator
11-01-2017
8.00
Working on the L elevator
10-31-2017
1.50
Finish riveting the R elevator except for the trim
10-30-2017
3.00
Finished riveting the Right elevator
10-27-2017
3.50
Almost finished riveting the right elevator
10-26-2017
4.00
Still riveting right elevator
10-25-2017
7.00
Riveting R Horz. stabalator
10-24-2017
2.00
Continue dimpling and countersinking R. elevator.
10-23-2017
4.50
Dimpling and match drilling
10-20-2017
2.50
continue match drilling elevators
10-18-2017
0.50
Partial drilling of skin holes to size #40.
10-11-2017
2.00
Pput skin and horns on both elevators
10-10-2017
1.00
Continue assemb;ing the elevators
10-02-2017
6.00
Assemblying parts for the elevators
09-28-2017
1.00
deburring and prep for elevator ribs
09-22-2017
1.00
Fiberglassing rudder top cap
09-20-2017
4.00
Rudder bottom cap
Details
09-19-2017
3.00
Rudder cap
Details
09-18-2017
4.00
Finished rudder
Details
09-14-2017
4.50
Rudder
Details
09-13-2017
3.00
riveted the two sides of the rudder together
Details
09-12-2017
6.00
Riveted rudder skins to the ribs
09-11-2017
7.00
Rudder prep
Details
09-08-2017
3.50
Finished vert stab
Details
09-07-2017
3.00
Cutting and deburring parts for the rudder
09-06-2017
6.00
Skin almost ready to install
Details
09-05-2017
3.00
working on vertical stabalizer
09-01-2017
3.00
Wsork on vert stab spar
08-31-2017
4.00
Finished inventorying all the tail kit contents
08-24-2017
2.00
Received tail kit box from Vans
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
649
3556
10 Avionics
51
293
10 DeIce
58
310
10 Empennage
58
239
10 Engine
8
39
10 Finish Kit
6
24
10 Firewall Forward
82
446
10 Fuselage
180
977
10 Inspection
3
8
10 Interior
22
128
10 Miscellaneous
23
116
10 Paint
35
175
10 Rear Fuselage
27
104
10 Wings
95
527
De Ice
1
170
RV14a Home