Work Logs Found: 57
Category Work Time: 419 Hours
 Date
Hours
Work Log Summary

Details

 09-03-2019
30.00
Continue configuring the G3X communication channel
Details

 08-10-2019
15.00
Debug G3X and correct minor issues
Details
       

 03-12-2019
1.00
Terminate sensor wires at the GEA24
Details
       

 03-11-2019
2.00
Battery Shunt
Details
     

 01-27-2018
3.00
Main electrical leads and ELT test wire
Details
     

 01-26-2018
8.00
Debug and install MP3 Stereo and CO detector
Details
       

 01-15-2018
10.00
Install switch plates
Details
       

 01-05-2018
20.00
Switch plate swap
Details
       

 01-01-2018
4.00
install switch plate backlights
Details
       

 12-31-2017
4.00
Wire the Seat Heater/Door Indicator switchplate
Details
       

 12-17-2017
8.00
Switch plates
Details
       

 11-24-2017
10.00
Install GTN650 tray and connectors
Details
       

 10-07-2017
3.00
add new buss bar in rear
Details
       

 08-25-2017
10.00
working back along the harness with integration
Details
       

 08-12-2017
15.00
install headset jacks and USB outlets to center co
Details
       

 08-11-2017
10.00
wire harness integration into main power distribut
Details
       

 08-09-2017
4.00
PTT integration, Heater tube
Details

 08-07-2017
20.00
integrating the harness into the aircraft
Details
       

 08-04-2017
15.00
construct the wire harness
Details
       

 08-02-2017
15.00
wire harness continued
Details
       

 07-31-2017
60.00
develop detailed design for electrical
Details
       

 07-04-2017
15.00
installed Ardunio and servos
Details
       

 11-05-2016
8.00
Overhead switch backlighting
Details
     

 10-30-2016
3.00
Footwell lighting
Details
       

 10-29-2016
6.00
Defrost fans, IP Brow light, Overhead map/reading
Details
       

 10-23-2016
6.00
wiring the overhead
Details
       

 10-16-2016
4.00
Finish kit on the way, Footwell lighting 2 years
Details
       

 09-02-2016
6.00
wire runs and install tunnel fan
Details
       

 08-22-2016
3.00
VPX configuration
Details
     

 08-20-2016
6.00
Master switch group install
Details
       

 07-22-2016
3.00
switch and backlighting
Details
       

 07-20-2016
1.00
switch work and remodeling delays
Details
       

 05-16-2016
4.00
Switch back lighting
Details
       

 04-25-2016
1.00
switch plates
Details
     

 04-24-2016
4.00
Electrical diagrams for switch groups
Details
       

 04-15-2016
4.00
Prewire overhead switch plate
Details
       

 04-12-2016
4.00
Switch plate layut
Details
       

 04-08-2016
1.00
Fuel pump, key switch wiring
Details
       

 04-06-2016
5.00
Fly LED controler mounting and wiring
Details
     

 03-21-2016
2.00
reworked sub buss panel and ran wires
Details
     

 02-25-2016
2.00
mounted tail strobe
Details
     

 02-21-2016
2.00
mounted LED tail strobe
Details
     

 02-19-2016
4.00
LED Readinf ligh holders
Details
       

 02-16-2016
6.00
Working on the VPX configuration
Details
     

 02-14-2016
4.00
rudder trim wiring and set up
Details
       

 02-13-2016
6.00
LED tail strobe
Details
     

 02-09-2016
1.00
ordered parts for electrical etc..
Details
     

 01-30-2016
2.00
checking out the switches
Details
       

 01-19-2016
6.00
prewire switch panels
       

 01-17-2016
4.00
electrical content, layout and switches
Details
       

 01-02-2016
5.00
Fly LED assembly
Details
     

 12-31-2015
5.00
Install grips and wiire trim switches
Details
       

 12-21-2015
6.00
main power leads and VPX ro insallation
Details
       

 12-16-2015
0.00
More electrical archetecture
Details

 12-15-2015
6.00
Refine electrical main power distribution design
Details
     

 12-07-2015
2.00
elevator trim wire
Details
       

 12-05-2015
5.00
Electrical Planning
Details