Powered By Kitlog Pro v2.0
LARRY'S WEB SITE
Sopwith Baby
Wheels
Work Logs Found:
22
Category Work Time:
60 Hours
Date
Hours
Work Log Summary
Details
10-29-2019
1.80
Correction to Tail Wheel Mounting
Details
10-27-2019
2.80
Finished the Installation of the New Tail Wheel
Details
10-26-2019
1.80
Start on Installing New Tail Wheel Assembly
Details
10-09-2019
1.10
Installed the Outter Wheel Covers
Details
09-23-2018
2.00
Wheel and Brake Assembly
Details
09-18-2018
1.20
Started Tape Up of Outter Wheel Cover Design
Details
10-20-2017
2.00
Reinstalled Bungee Cords on each Axle.
Details
10-12-2017
2.80
Painting Wheel Disk with Primer
Details
11-23-2016
3.00
Tail Wheel Control Cables
Details
11-22-2016
4.00
Installed the Tail Wheel Bungee Cord
Details
10-30-2016
2.50
Aft Landing Gear Support Cables Installed
Details
10-28-2016
3.00
Start Install of Landing Gear Cable Bracing
Details
10-19-2016
2.00
Installed Landing Gear Mount Bolts
Details
10-16-2016
3.00
Mounting Main Landing Gear
Details
10-11-2016
2.00
Mounted Tires on the Main Gear
Details
10-10-2016
2.00
Installation of Bungee Cords on Main Axle
Details
10-09-2016
2.00
Main Wheel Strut Closures
Details
08-17-2016
2.50
Mounting the Inside Wheel Covers
Details
07-20-2016
2.00
Tail Wheel Mounting
Details
07-15-2016
4.50
Assembly of Main Axle
Details
07-10-2016
6.50
Construction of the Tail Wheel
Details
07-04-2016
5.75
Landing Gear Struts and Main Axle
Details
SITE NAVIGATION
Contact Builder
Sopwith Baby Home
Category
# Logs
# Hours
All
890
2613
Avionics
61
155
Brake System
21
56
Component
122
253
Configuration
5
15
Controls
6
13
Design
7
12
Documentation
61
275
Electrical
57
125
Empennage
14
59
Engine
64
150
Fabric Covering
94
310
Fuselage
97
376
Inspections
5
17
Miscellaneous
13
33
Painting
92
272
Prop
3
3
Shop Supplies
3
6
Testing
7
13
Wheels
22
60
Wings
136
410
Copyright © 2001-2024 Matronics. All Rights Reserved.