Work Logs Found: 61
Category Work Time: 155 Hours
 Date
Hours
Work Log Summary

Details

 11-30-2019
2.80
Completed AOA Install and Calibration
Details
       

 11-27-2019
1.30
Tested the Instrument, Position and Landing Lights
Details

 11-16-2019
1.20
Replaced the ELT Battery and Completed Registratio
Details

 11-13-2019
0.70
Trouble Shooting AOA System
Details

 11-04-2019
0.60
Trouble Shooting AOA System
Details

 11-03-2019
1.20
Installed the Repaired AOA Display
Details

 10-11-2019
2.30
Continued Trouble Shooting the AOA System
Details

 10-09-2019
1.10
Started on Setting Up the AOA System
Details

 09-23-2019
4.40
Installed AOA Signal Cable in Top Left Wing
Details
     

 09-15-2019
3.60
Completed the Air Tubes for A/S and Static
Details
       

 09-09-2019
1.00
Found and Repaired the Bad Connection on the Temp
Details

 09-01-2019
2.90
Tested the ELT and ADS-B Systems
Details

 08-31-2019
3.20
Install Ground Plane for ADS-B Antenna
Details
     

 08-30-2019
3.60
ADS-B and ELS Antenna Cables
Details
       

 08-29-2019
1.50
Installed the ADS-B Antenna
Details
     

 08-28-2019
2.75
Completed Wiring of the ADS-B System
Details
     

 08-27-2019
3.00
Installing the Control Module for ADS-B System
Details
     

 08-26-2019
2.00
Finished Installing AOA Display on Instrument Pane
Details
     

 08-25-2019
2.50
Continued Work on AOA Wiring Harness
Details

 08-24-2019
3.30
Completed Wiring the AOA Display Plug
Details
     

 08-22-2019
1.80
Building Up AOA Wiring Harness
Details
     

 08-21-2019
2.50
Repair Broken Wire on Temp Probe
Details
     

 08-20-2019
3.60
Wiring Harness for the G Meter/Clock
Details

 08-18-2019
1.10
Mounted the ELT
Details
     

 08-16-2019
2.50
Mounted G Meter into Instrument Panel
Details
     

 08-15-2019
3.10
Start the Install of the ADS-B System
Details
     

 08-14-2019
3.70
Fitting the Vane Mount to the Wing Strut
Details
     

 08-13-2019
3.20
Installed AOA Display Unit in Instrument Panel
Details
       

 08-10-2019
2.10
Evaluate Location for AOA Installation
Details
     

 08-09-2019
0.30
Received AOA Unit
Details

 08-08-2019
3.60
Programed Transponder and Radio Check
Details

 08-07-2019
2.80
Repaired Transponder Harness
Details

 08-04-2019
3.40
Moved the Blind Altimeter Mount
Details

 08-03-2019
3.20
Completed Transponder Wiring Harness
Details
     

 07-27-2019
3.30
Mounting of Transponder Case
Details
     

 07-23-2019
2.60
Finished the Power and Ground Wires On Transponder
Details
     

 07-22-2019
2.70
Changed Out Avionics 10 AMP CB For A 15 AMP
Details
     

 07-18-2019
2.00
Continued Work On Transponder Harness
Details

 07-17-2019
2.00
Wiring the Transponder Harness
Details
     

 07-15-2019
3.10
Continued Testing The Radio Wiring Harness
Details

 07-14-2019
2.30
Continued With the Installation of the Radio Harne
Details

 07-13-2019
2.20
Mounting the Blind Altimeter
Details
     

 07-12-2019
2.65
Construction of Blind Altimeter Mount
Details
     

 07-11-2019
3.50
Installing the Right Side Intercom PTT Switch
Details

 07-05-2019
3.80
Continued Working on VHF Radio Plug
Details
     

 07-01-2019
1.00
Replaced the Transponder Antenna Cable End With A
Details

 06-28-2019
4.60
Construction of the Stick Yoke
Details
     

 06-27-2019
3.20
Installed the PTT Lines from the Control Stick
Details

 06-20-2019
3.10
Continued Work on VHF Radio and Transponder Plugs
Details

 06-19-2019
3.40
Continued Work on Radio and Transponder Plugs
Details

 06-18-2019
2.90
Designed Push-to-Talk Wiring Tube
Details

 06-14-2019
1.60
Installed the Transponder Antenna on the Belly Pan
Details
     

 06-12-2019
3.80
Transponder Antennal and Insignia Instal
Details
       

 06-11-2019
2.60
Continued Wiring on the Radio Plug
Details
     

 06-10-2019
2.00
Starting Soldering the VHF Radio Plug
Details

 06-08-2019
1.40
Finished Labeling the Instrument Panel
Details

 06-04-2019
4.00
Installing Lables on the Instrument Panel
Details
       

 06-02-2019
2.00
Mounted VHF Radio in Instrument Panel
Details
     

 05-29-2019
1.00
Installed the Antenna Lead in the Transponder Case
Details
     

 05-28-2019
3.70
Installed VHF Antenna and Beacon
Details
     

 08-22-2017
3.00
CHT & EGT Prob Wiring