Date
|
Hours
|
Work Log Summary

|
Details

|
11-30-2019
|
2.80
|
Completed AOA Install and Calibration
|
Details
|
|
|
11-27-2019
|
1.30
|
Tested the Instrument, Position and Landing Lights
|
Details
|
  |
|
11-16-2019
|
1.20
|
Replaced the ELT Battery and Completed Registratio
|
Details
|
  |
|
11-13-2019
|
0.70
|
Trouble Shooting AOA System
|
Details
|
  |
|
11-04-2019
|
0.60
|
Trouble Shooting AOA System
|
Details
|
  |
|
11-03-2019
|
1.20
|
Installed the Repaired AOA Display
|
Details
|
  |
|
10-11-2019
|
2.30
|
Continued Trouble Shooting the AOA System
|
Details
|
  |
|
10-09-2019
|
1.10
|
Started on Setting Up the AOA System
|
Details
|
  |
|
09-23-2019
|
4.40
|
Installed AOA Signal Cable in Top Left Wing
|
Details
|
 |
|
09-15-2019
|
3.60
|
Completed the Air Tubes for A/S and Static
|
Details
|
|
|
09-09-2019
|
1.00
|
Found and Repaired the Bad Connection on the Temp
|
Details
|
  |
|
09-01-2019
|
2.90
|
Tested the ELT and ADS-B Systems
|
Details
|
  |
|
08-31-2019
|
3.20
|
Install Ground Plane for ADS-B Antenna
|
Details
|
 |
|
08-30-2019
|
3.60
|
ADS-B and ELS Antenna Cables
|
Details
|
|
|
08-29-2019
|
1.50
|
Installed the ADS-B Antenna
|
Details
|
 |
|
08-28-2019
|
2.75
|
Completed Wiring of the ADS-B System
|
Details
|
 |
|
08-27-2019
|
3.00
|
Installing the Control Module for ADS-B System
|
Details
|
 |
|
08-26-2019
|
2.00
|
Finished Installing AOA Display on Instrument Pane
|
Details
|
 |
|
08-25-2019
|
2.50
|
Continued Work on AOA Wiring Harness
|
Details
|
  |
|
08-24-2019
|
3.30
|
Completed Wiring the AOA Display Plug
|
Details
|
 |
|
08-22-2019
|
1.80
|
Building Up AOA Wiring Harness
|
Details
|
 |
|
08-21-2019
|
2.50
|
Repair Broken Wire on Temp Probe
|
Details
|
 |
|
08-20-2019
|
3.60
|
Wiring Harness for the G Meter/Clock
|
Details
|
  |
|
08-18-2019
|
1.10
|
Mounted the ELT
|
Details
|
 |
|
08-16-2019
|
2.50
|
Mounted G Meter into Instrument Panel
|
Details
|
 |
|
08-15-2019
|
3.10
|
Start the Install of the ADS-B System
|
Details
|
 |
|
08-14-2019
|
3.70
|
Fitting the Vane Mount to the Wing Strut
|
Details
|
 |
|
08-13-2019
|
3.20
|
Installed AOA Display Unit in Instrument Panel
|
Details
|
|
|
08-10-2019
|
2.10
|
Evaluate Location for AOA Installation
|
Details
|
 |
|
08-09-2019
|
0.30
|
Received AOA Unit
|
Details
|
  |
|
08-08-2019
|
3.60
|
Programed Transponder and Radio Check
|
Details
|
  |
|
08-07-2019
|
2.80
|
Repaired Transponder Harness
|
Details
|
  |
|
08-04-2019
|
3.40
|
Moved the Blind Altimeter Mount
|
Details
|
  |
|
08-03-2019
|
3.20
|
Completed Transponder Wiring Harness
|
Details
|
 |
|
07-27-2019
|
3.30
|
Mounting of Transponder Case
|
Details
|
 |
|
07-23-2019
|
2.60
|
Finished the Power and Ground Wires On Transponder
|
Details
|
 |
|
07-22-2019
|
2.70
|
Changed Out Avionics 10 AMP CB For A 15 AMP
|
Details
|
 |
|
07-18-2019
|
2.00
|
Continued Work On Transponder Harness
|
Details
|
  |
|
07-17-2019
|
2.00
|
Wiring the Transponder Harness
|
Details
|
 |
|
07-15-2019
|
3.10
|
Continued Testing The Radio Wiring Harness
|
Details
|
  |
|
07-14-2019
|
2.30
|
Continued With the Installation of the Radio Harne
|
Details
|
  |
|
07-13-2019
|
2.20
|
Mounting the Blind Altimeter
|
Details
|
 |
|
07-12-2019
|
2.65
|
Construction of Blind Altimeter Mount
|
Details
|
 |
|
07-11-2019
|
3.50
|
Installing the Right Side Intercom PTT Switch
|
Details
|
  |
|
07-05-2019
|
3.80
|
Continued Working on VHF Radio Plug
|
Details
|
 |
|
07-01-2019
|
1.00
|
Replaced the Transponder Antenna Cable End With A
|
Details
|
  |
|
06-28-2019
|
4.60
|
Construction of the Stick Yoke
|
Details
|
 |
|
06-27-2019
|
3.20
|
Installed the PTT Lines from the Control Stick
|
Details
|
  |
|
06-20-2019
|
3.10
|
Continued Work on VHF Radio and Transponder Plugs
|
Details
|
  |
|
06-19-2019
|
3.40
|
Continued Work on Radio and Transponder Plugs
|
Details
|
  |
|
06-18-2019
|
2.90
|
Designed Push-to-Talk Wiring Tube
|
Details
|
  |
|
06-14-2019
|
1.60
|
Installed the Transponder Antenna on the Belly Pan
|
Details
|
 |
|
06-12-2019
|
3.80
|
Transponder Antennal and Insignia Instal
|
Details
|
|
|
06-11-2019
|
2.60
|
Continued Wiring on the Radio Plug
|
Details
|
 |
|
06-10-2019
|
2.00
|
Starting Soldering the VHF Radio Plug
|
Details
|
  |
|
06-08-2019
|
1.40
|
Finished Labeling the Instrument Panel
|
Details
|
  |
|
06-04-2019
|
4.00
|
Installing Lables on the Instrument Panel
|
Details
|
|
|
06-02-2019
|
2.00
|
Mounted VHF Radio in Instrument Panel
|
Details
|
 |
|
05-29-2019
|
1.00
|
Installed the Antenna Lead in the Transponder Case
|
Details
|
 |
|
05-28-2019
|
3.70
|
Installed VHF Antenna and Beacon
|
Details
|
 |
|
08-22-2017
|
3.00
|
CHT & EGT Prob Wiring
|
Details
|
|