Mark's Web Site
RV-12
Engine
Work Logs Found:
67
Category Work Time:
78 Hours
Date
Hours
Work Log Summary
Details
08-08-2018
3.00
Throttle and choke cables (50-02)
Details
08-07-2018
3.00
Cabin heat cable (49-09)
Details
02-21-2018
1.00
Oil Hose Install (49-17)
Details
02-20-2018
1.00
Apply Heat Shield (49-16)
Details
02-18-2018
0.50
Prep for heat shield (49-16)
Details
02-17-2018
1.00
Attach remaining air duct seals (49-15)
Details
02-16-2018
0.50
Air Duct Seal (49-15)
Details
02-11-2018
0.50
Touch up fiberglass work (49-14)
Details
02-10-2018
0.50
Fiberglass Air Duct (49-14)
Details
02-09-2018
2.50
Air Duct Attachment (49-13)
Details
02-03-2018
0.50
Fiting Air duct (49-13)
Details
01-29-2018
1.00
Fitting Air duct (49-13)
Details
01-27-2018
1.50
Fitting Air Duct (49-13)
Details
01-26-2018
0.50
Attach Oil Cooler (49-12)
Details
01-25-2018
0.50
Attach Oil Cooler (49-12)
Details
01-24-2018
0.50
Oil Cooler Box Assembly (49-11)
Details
01-22-2018
1.00
Oil Cooler Box (49-11)
Details
01-20-2018
2.00
Radiator hose install (49-07)
Details
01-18-2018
1.50
Radiator installation (49-05)
Details
01-16-2018
0.50
Cooler box door gasket (49-04)
Details
01-15-2018
1.00
Attach Cooler box and door (49-04)
Details
12-28-2017
1.00
Cooler door hinge (49-03)
Details
12-17-2017
1.00
Oil tank installation (49-04)
Details
12-16-2017
2.00
Cooler Door & hinge (49-02)
Details
12-15-2017
1.50
Exhaust system install (48-02)
Details
12-14-2017
0.50
Spinner final assembly (47-06)
Details
12-13-2017
1.00
Set propeller and install (47-07)
Details
12-12-2017
2.00
Spinner gap filler install (47-06)
Details
12-11-2017
1.00
Install nut plates on spinner plates (47-05)
Details
12-10-2017
1.00
Install spinner gap filler (47-05)
Details
10-30-2017
1.00
Spinner gap edge fix (47-05)
Details
10-29-2017
1.00
Spinner gap filler (47-05)
Details
10-28-2017
1.00
Spinner install (47-05)
Details
10-27-2017
2.00
Spinner install (47-04,05)
Details
10-10-2017
2.00
Propeller on (47-03)
Details
10-09-2017
1.00
Trimming Spinner (47-03)
Details
10-08-2017
1.00
Secure pitot line (47-02)
Details
10-07-2017
1.00
Re-routing pitot line (47-02)
Details
10-06-2017
0.50
Pitot tube (47-02)
Details
10-05-2017
1.50
Attach hoses to fuel drain line (46-16,17,18,19)
Details
10-04-2017
1.00
Attach fuel drain line (46-16)
Details
10-03-2017
0.50
Fuel Drain (46-16)
Details
10-02-2017
0.50
Wire starter and manifold pressure hose (46-14,15)
Details
10-01-2017
1.00
Sensor wire installs (46-12,13)
Details
09-30-2017
3.00
Install fuel lines and wireing (46-09,10,11)
Details
09-29-2017
3.00
Hanging the engine (46-08)
Details
09-28-2017
0.50
Prep to hang engine (46-08)
Details
09-27-2017
1.00
Final size engine mounts (46-08)
Details
09-26-2017
1.00
Fuel lines and banjo bolts (46-07)
Details
09-25-2017
0.50
Re-attach carbs (46-07)
Details
09-23-2017
0.50
Attach homemade bridge gap filler (46-06)
Details
09-22-2017
0.50
attach drip trays (46-06)
Details
09-21-2017
0.50
gap bridge solution (46-06)
Details
09-20-2017
0.50
Prepare bridge for carb to drip tray (46-06)
Details
09-16-2017
1.00
Seal drip trays (46-06)
Details
09-15-2017
2.00
Drip trays (46-06)
Details
09-14-2017
1.00
Engine mount installation (46-05)
Details
09-13-2017
1.00
Prep engine mount (46-05)
Details
09-12-2017
1.00
Hack saw off starter lug (46-04)
Details
09-11-2017
0.50
Disconnect engine ignition wires (46-02)
Details
09-10-2017
0.50
Engine Installation (46-02)
Details
09-09-2017
1.00
Hooking up the relays (45A-08)
Details
09-06-2017
1.00
Engine wiring (46A-06)
Details
09-05-2017
1.00
Firewall fwd wire harness (45A-03)
Details
09-04-2017
1.00
Secure Battery (45A-02)
Details
08-19-2017
5.00
Inventory Engine Kit
Details
08-18-2017
1.00
Engine Delivery
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
632
1257
Avionics
23
22
Certification
1
1
Empennage
76
176
Engine
67
78
Finishing
144
290
Flight
3
Fuselage
163
348
Miscellaneous
2
None
9
3
Paint
24
50
PAP
14
18
Service Bulletin
21
30
Shop Supplies
4
Tools
2
Wings
79
241
Copyright © 2001-2024 Matronics. All Rights Reserved.