KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
Work Logs Found: 27
Category Work Time: 134 Hours
 Date
Hours
Work Log Summary

Details

 05-06-2024
2.00
Nut plates
Details

 05-05-2024
3.00
Steering link
Details
       

 05-04-2024
4.00
Various
Details
       

 05-03-2024
8.00
Various
Details
       

 05-02-2024
7.00
Fairing and rudder install
Details
       

 05-01-2024
6.00
Installing the fairing
Details
       

 04-30-2024
3.00
Rigging the elevator Bellcrank
Details
       

 04-29-2024
8.00
Installing the elevators
Details
       

 04-28-2024
14.00
Various
Details
       

 04-25-2024
10.00
Nutplates & empennage installation
Details
       

 04-24-2024
2.00
Nut plates install on fiberglass tip ends
Details
     

 04-19-2024
5.00
Closing Fiberglass tip
Details
       

 04-18-2024
8.00
Checking the empenage
Details
       

 04-16-2024
11.00
Doing the SB00036
Details
       

 08-03-2019
7.00
HS final riveting
Details
       

 07-28-2019
1.00
HS final riveting started
Details
       

 06-24-2019
4.00
VS & Rudder
Details
       

 04-26-2019
2.00
Rivetting VS
Details
       

 12-09-2018
4.00
Assembling of the trim tab
Details
       

 09-10-2017
3.00
Removing the trailing edge bulge on right elevator
Details
       

 09-10-2017
1.00
Fiberglass tip installed
Details
     

 09-09-2017
3.00
Installing fiberglass tip on HS
Details
       

 09-04-2017
7.00
Riveting
Details
       

 08-30-2017
0.00
Yvon helped me to fix a couple rivets that were no
Details
     

 08-20-2017
8.00
working on installing doublers for the SB 14-01-31
Details
       

 08-15-2017
1.00
Rivet removal on HS structure
Details
       

 08-13-2017
2.00
HS -- comply with SB 14-01-31
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.