LARRY'S WEB SITE
Work Logs Found: 57
Category Work Time: 125 Hours
 Date
Hours
Work Log Summary

Details

 10-19-2019
1.60
Installed New Master Soleniod
Details

 10-17-2019
3.00
Continued Connections for 12V Accessory Plug
Details

 10-16-2019
2.00
Continued Connections For 12V Accessory Plug
Details

 10-15-2019
2.00
Installed Accessory Power Plug Into Instrument Pan
Details
     

 10-13-2019
0.80
Started Install of 12V Accessory Plug
Details

 07-04-2019
3.70
Installed Intercom PTT/Hot Switch
Details
       

 07-01-2019
3.20
Installed Wing Position Ligjhts
Details
     

 06-28-2019
2.00
Installed Position Light Plugs on Wing Ends
Details
     

 04-06-2019
2.50
Installed Rudder Tail Light
Details
       

 03-29-2019
3.00
Installed Emergency Battery Wiring
Details
       

 03-28-2019
3.20
Continued Organization of Instrument Panel Wiring
Details

 03-27-2019
2.00
Worked on Organization of Instrument Panel Wiring
Details
     

 03-26-2019
3.70
Installed Right Wing Light Plug and Connect Light
Details

 03-25-2019
3.80
Installed Electric Plugs for Left Wing and Tail Li
Details
       

 03-24-2019
4.00
Tail Light and Beacon Wiring
Details
       

 03-18-2019
2.50
Wired Up the Right Landing Light
Details
       

 01-27-2019
2.20
Start of Electric Systems Testing
Details
     

 01-26-2019
2.50
Fuel Pressure Line and Test Install of Battery
Details
     

 01-22-2019
2.00
Corrected AMP Shunt Wiring
Details
       

 01-17-2019
2.00
Power Connections to Circuit Breakers
Details
     

 01-16-2019
3.50
Connected Main Ground and Ignition Power
Details
       

 01-10-2019
1.00
Completed the Starter Circuit
Details

 01-09-2019
2.00
Continued Wiring of the Instrument Panel
Details

 01-07-2019
2.00
Continued Wiring of Instrument Panel
Details

 01-06-2019
3.00
Continuing Connecting Engine Instruments
Details

 01-05-2019
3.50
Start Wiring From Firewall to Instrument Panel
Details
     

 12-10-2018
3.50
Installing Flight Instruments Into Pannel
Details
       

 12-09-2018
2.00
Mounting Emergency Power Diodes
Details
     

 12-08-2018
2.00
Installed the Light Controllers Mounting Shelf
Details
     

 12-06-2018
3.50
Installed Cockpit and Instrument Light Switches
Details
       

 12-04-2018
2.00
Install Light Controllers
Details
     

 12-01-2018
2.00
Mounted Terminal Blocks on Instrument Panel
Details
     

 11-24-2018
2.00
Installed Rheostat for Instruments Lights
Details
     

 11-23-2018
4.00
Power and Ground Wiring of Instruments
Details
     

 11-21-2018
2.00
Started Wire Labeling
Details

 11-19-2018
1.00
Wiring Instrument Lights Left Side
Details
     

 10-21-2018
1.00
Instrument Panel Wiring for Alternator Light
Details

 10-17-2018
1.50
Installed TAC, Carb Heat, and AMP Meters
Details
       

 10-14-2018
3.00
Installing Engine Instrurments in Panel
Details
       

 10-13-2018
2.00
Continued Power Wiring and Shelf for Controllers
Details
     

 10-12-2018
2.00
Start of Power Connections from CB to Switches
Details
     

 02-09-2018
1.50
Diagramed Electric Circuits for Fuse Requirements
Details

 09-17-2017
2.00
Added Secondary Firewall Terminal Block
Details
       

 09-12-2017
2.00
Firewall TopTerminal Blocks
Details
       

 09-11-2017
0.50
Mounted Lower Ground Buss
Details
     

 09-10-2017
0.70
Wiring for the Electric Fuel Pump
Details
     

 08-27-2017
0.50
Wiring the Electric Scavenging Pump
Details
     

 08-25-2017
0.75
Built Up Red Battery Cable & Terminated the Altern
Details

 08-24-2017
2.50
Final Engine Electrical Wiring
Details
     

 08-22-2017
1.50
Cable Clamps and Alternator Wiring
Details
       

 08-21-2017
2.00
Main Buss Connections
Details
       

 08-18-2017
1.20
Installing the Starter Power Cable
Details
       

 08-17-2017
2.50
Mounted Solenoid, Fuses, and Shunt Assembly
Details
       

 08-17-2017
2.50
Grounding the Fuselage and Engine
Details
       

 08-16-2017
1.20
Amp Meter Shunt Installed & Design Issues
Details
     

 08-13-2017
1.00
Solenoid and Fuse Link Connection
Details
     

 08-10-2017
2.00
Initial Electric Wiring Design Efforts
Details
     