LARRY'S WEB SITE
Work Logs Found: 64
Category Work Time: 150 Hours
 Date
Hours
Work Log Summary

Details

 11-15-2019
0.50
Oil Site Gage Vent
Details

 03-23-2019
3.00
Scavenge Pump Engine Test Run
Details
     

 03-21-2019
2.50
Completed Routing of Oil Scavenge Lines
Details
       

 03-20-2019
3.00
Removed Oil Scavenge Lines and Filter
Details
     

 03-19-2019
3.00
Second Engine Test Run and Connected Left Landing
Details
       

 03-12-2019
3.50
Changed Oil Vent and Beacon Cutout
Details
     

 03-11-2019
4.00
Engine Full Power Test Run
Details

 02-22-2019
2.20
First Engine Start
Details
       

 02-21-2019
2.50
Removed and Installed Electric Fuel Pump
Details
     

 02-14-2019
2.50
Prime the Oil and Fuel Systems
Details
     

 02-13-2019
3.50
Pre-Oiling Engine
Details
       

 02-02-2019
1.10
Setup Oil Accumulator Head Pressure
Details

 10-03-2017
1.75
Completed the Starter Connectioins and Fuel Drain
Details
     

 10-02-2017
2.50
Installing Engine Componets and Starter
Details
       

 10-02-2017
1.50
Installation of the Copper Fuel Line and Drain
Details
     

 09-30-2017
1.30
Throttle and Mixture Cable Clamps
Details
     

 09-28-2017
1.50
Installed Cable Clamps in the Engine Bay
Details

 09-26-2017
2.80
Installation of the Mixture Control Cable
Details
       

 09-25-2017
2.00
Installed Primer Control Cable
Details
     

 09-23-2017
1.20
Painting the lower frame of the instrument pannel
Details
     

 09-23-2017
2.40
Installing Clamps to Protect the Oil Lines
Details
     

 08-26-2017
1.50
Replaced the Throttle Cable
Details

 08-15-2017
2.00
Ingnition Wiring Installation
Details
       

 08-12-2017
0.75
Throttle Cable Through the Firewall
Details
       

 08-12-2017
0.50
Oil Accumulator Control Cable Installation
Details
       

 08-12-2017
0.75
Installed the CHT Probe
Details
     

 08-11-2017
0.50
Installed the Mixture Control Cable Firewall Pass-
Details
     

 08-10-2017
1.50
Mixture Cable Mounting Bracket
Details
     

 08-09-2017
3.20
Throttle Cable Attachment & Reconnect Lines
Details
       

 08-08-2017
2.50
Carburetor Linkages and EGT Weldment
Details
       

 08-07-2017
0.50
Mounted the Engine Coils
Details
     

 08-02-2017
1.00
Firewall Pass Through and Engine Electronics
Details
     

 08-01-2017
1.50
Mounting for the Engine Coils
Details
       

 07-30-2017
0.50
Installed Oil Vent Line
Details
     

 07-18-2017
2.75
Installing Oil Lines Behind the Firewall
Details
       

 07-17-2017
0.50
Install Electric Fuel Pump Vertical
Details
     

 07-12-2017
0.50
Carburetor Fuel Bypass Line Installed to Firewall
Details
     

 07-07-2017
1.50
Electric Scavenge Pump Input
Details
     

 07-05-2017
4.00
Oil Lines at the Firewall
Details
       

 07-04-2017
2.50
Reposistioned the Battery Box
Details
     

 07-03-2017
0.50
Safety Wired Engine Mounting Bolts
Details
     

 07-02-2017
5.00
Battery Box Top Completion
Details
     

 07-01-2017
6.50
Electric Scav Pump and Battery Box Top Continued
Details
       

 06-30-2017
2.50
Oil Sump Vent Line and Battery Box Base
Details
       

 06-30-2017
3.00
Battery Box Top Constriction
Details
     

 06-29-2017
3.25
Oil Tank Fittings & Battery Box Construction
Details
       

 06-28-2017
4.75
Oil Tank Mounting Bracket and Carb Air Filter
Details
       

 06-28-2017
1.00
Fuel Tank Test Fill and Flow Rate
Details

 06-27-2017
4.00
Main Fuel Line Installation From Fuel Filter
Details
       

 06-19-2017
2.00
Mounting Bolts for Air Filter Assembly
Details
     

 06-10-2017
3.80
Inline Oil Filter and Fuel Solenoids
Details
       

 06-07-2017
0.50
Mounted Engine Coils
Details
     

 05-01-2017
4.00
Installing the Oil Accumulator
Details
       

 04-28-2017
2.40
Gascolator Brackit Construction
     

 04-27-2017
2.90
Mounted the Engine Oil Filter Assembly and Cockpit
       

 04-12-2017
3.80
Verified Engine Mounting Angle
     

 04-11-2017
3.60
Continued With Engine Install
     

 04-10-2017
3.80
Installed Engine Mount Bolts
       

 04-09-2017
5.30
Installed the Engine Mount and Engine
       

 02-19-2017
3.50
Initial Fitting of the Engine Mount
     

 02-16-2017
2.30
Rotec R3600 Removed from Crate
     

 01-04-2017
2.00
Delivery of Engine Weldments For Mount Constructio
Details

 12-30-2016
1.00
Inventory of Engine Delivery
Details
       

 12-30-2016
1.50
Delivery of Engine
Details
       