LARRY'S WEB SITE
Work Logs Found: 122
Category Work Time: 253 Hours
 Date
Hours
Work Log Summary

Details

 01-28-2020
2.20
Installed Leather Cover on Left Side Cockpit
Details
     

 12-26-2019
2.20
Finished Forward Cover with Windshields
Details
       

 12-21-2019
2.30
Building Leather Cover for Right Side Panel
Details
     

 12-19-2019
1.10
Laced the Leather Cover on the Left Side Panel
Details

 12-18-2019
2.10
Installing Leather Edge Roll on Left Side Panel
Details
     

 12-14-2019
3.00
Installed the Leather Roll on the Front Cover
Details
     

 12-13-2019
1.80
Begin the Install of the Leather Roll on Front Cov
Details

 12-12-2019
2.10
Grommets Installed On Leather Covering
Details
     

 12-10-2019
2.10
Painted Windsceen Bases
Details
     

 12-08-2019
1.70
Cleaned Up Windscreens and Started on Cockpit Edge
Details

 11-26-2019
2.80
Installed Channel to Top Wing
Details
     

 11-14-2019
0.50
Put Chain on Oil Cap
Details
     

 10-20-2019
2.50
Fitting and Install Forward Fuselage Cover
Details
       

 09-19-2019
1.70
Moved Top Left Wing to Work Table
Details

 09-18-2019
2.40
Completed AOA Vane Wiring and Belly Patch
Details

 09-17-2019
3.20
Repaired Left Wing Stub Step and Mounted AOA Sende
Details
     

 09-11-2019
1.70
Replaced Copilot Intercom Switch and Mounted Belly
Details
     

 08-29-2019
2.20
Complete the Installation of the Oil Filler
Details

 08-28-2019
1.75
Oil Filler Hole in Forward Cover and ADS-B Antenna
Details
       

 07-10-2019
3.40
Installed Lower Brace on Instrument Panel
Details
     

 07-09-2019
2.80
Construction of USB Power Supply and Instrument Pa
Details
     

 07-06-2019
3.40
Fitting Side Panels Radio Controls and Oil Filler
Details
       

 07-02-2019
2.90
Installed Music Input and Stick Yoke
Details
     

 06-17-2019
3.50
Installed Gas Cap on Forward Fuselage Cover
Details
     

 06-16-2019
1.10
Installed Ribs in Forward Fuselage Cover
Details
       

 06-13-2019
0.60
Took the Cowling to Get a Vinyl Wrap
Details

 06-06-2019
0.60
Cleared the Mounting Holes for Aft Cockpit Ring
Details

 05-31-2019
1.50
Installing Landing Light Lens
Details
     

 04-20-2019
2.00
Construction of Emergency Battery Case
Details
     

 03-22-2019
2.50
Installed Air Filter and VHF Antenna Mount
Details
       

 03-09-2019
2.50
Completed Installation of Right Landing Light
Details
     

 03-01-2019
2.00
Trim Strip for Left Landing Light
Details
     

 02-26-2019
2.50
Completed Installation of Flash Lube Kit
Details
     

 02-25-2019
3.50
Install Flash Lube Value Saver Kit
Details
     

 02-23-2019
2.50
Left Landing Light Bezel
Details
     

 02-12-2019
3.00
Landing Light Trim and Engine Oil Prep
Details
     

 02-01-2019
1.50
Installed Landing Lights
Details
     

 01-31-2019
1.80
Landing Light Brackets
Details
     

 01-04-2019
1.20
Secured Instrument Panel and Reconnected Wiring
Details
     

 01-03-2019
2.00
Initial Mount of Instrument Panel on Fuselage
Details
     

 01-02-2019
1.50
Mounting Transponder Case
Details
     

 12-28-2018
2.00
Transponder Opening on Instrument Panel
Details
     

 12-26-2018
0.60
Complete Anchor Strips on Second Lens
Details

 12-24-2018
1.30
Anchor Strip Installation on Landing Light Lens
Details
     

 12-13-2018
2.60
Installed Wet Compass and IPad Holder
Details
       

 12-11-2018
1.50
Mounted the VSI and Altimeter Into Instrument Pane
Details

 11-07-2018
2.00
Cut Out Left Landing Light Lens and Preped Washers
Details
     

 10-25-2018
2.00
Form for Landing Light Lens and Lens
Details
       

 10-10-2018
0.70
Added Landing Light Selector Switch
Details
     

 09-28-2018
4.00
Installing Switches on to the Insturment Panel
Details
     

 09-27-2018
1.50
Add the Opening for the AMP Display
Details
       

 09-25-2018
2.00
Added Holes for the Volt Meter in the Insturment P
Details
       

 09-23-2018
1.00
Instrument Panel Cutout for Carb Heat Display
Details
     

 09-07-2018
1.30
Compass Install into Instrument Panel
Details
     

 08-29-2018
0.50
Varnished the New Cutouts on the Cockpit Sides
Details

 08-21-2018
1.00
Drilled Holes for Aileron Cables in Cockpit Sides
Details
       

 08-12-2018
3.00
Fitting the Left Cockpit Side Panel
Details
     

 08-06-2018
2.50
Installation of Step on Left Wing Stub
Details
       

 08-05-2018
2.00
Building Forward Brace for Left Wing Stub Step
Details
     

 07-30-2018
1.30
Fairing for the Elevator and Rudder Cables
Details
       

 07-09-2018
2.00
Painting of the Bottom of the Belly Pan
Details
       

 07-07-2018
0.50
Punched TAC Instrument Hole in the Panel
Details
     

 07-05-2018
3.50
Inside Wheel Covers Mods and Painting
Details
       

 07-02-2018
1.00
Purchase of Anti Collision Light
Details
     

 06-30-2018
1.00
Applied a Coat of Varnish on Instrument Panel
Details

 06-27-2018
1.00
Bending Trailing Edge for Wing Stubs
Details

 06-16-2018
2.00
Start of Instrument Panel Hole Punches
Details
     

 06-08-2018
1.00
Installed Tubes for Pitot and Control Cable Faring
Details
       

 06-07-2018
1.20
Production of Control Cable Faring
Details
     

 06-05-2018
0.50
Control Cable Faring Cover Male Form
Details
     

 04-10-2018
0.50
Finished the Veneer on the Instrument Panel
Details
     

 04-06-2018
1.00
Construction of Wing Racks
Details
     

 03-31-2018
0.50
Veneer on Instrument Panel
Details
     

 03-15-2018
2.50
Wood Veneer Installation on Insturment Panel
Details
     

 02-17-2018
4.00
Final Aileron Cable Adjustments and Rudder Prep
Details
       

 02-14-2018
0.50
Wing Tip Light Bracket Fillit Blocks
Details
       

 01-24-2018
2.50
Aileron Crossover Cable Center Shim
Details
     

 01-21-2018
0.50
Another Crossover Cable Bracket Design
Details

 01-19-2018
2.50
Continued Design on Crossover Cable Pulley
Details
     

 01-13-2018
2.00
Aileron Crossover Cable Pulley Design
Details
     

 01-11-2018
1.50
Installing Tyedown Straps
Details
     

 01-10-2018
5.00
Pitot Tube, Aileron Cable Pulleys, and Tyedown Str
Details
       

 01-09-2018
2.00
Pitot Bracket Shims and Off Set Pulleys
Details
       

 01-04-2018
1.00
Control Assembly Modification for Aileron Control
Details
       

 12-21-2017
1.30
Control Stick Modification for Aileron Control
Details

 12-02-2017
1.20
Stand for Instrument Panel
Details

 10-14-2017
3.50
Sanded and Applied Finish Coat to Cockpit Sides
Details
     

 10-08-2017
4.00
Seat Throttles and Belly Pan
Details
       

 10-05-2017
2.70
Reinstalled the Throttles and Belly Pan Installati
Details
     

 10-04-2017
2.40
Painted the Throttles and Initial Fitting of the B
Details

 10-01-2017
4.50
Reinstall Fuel Tank and Ready Engine
Details
       

 09-20-2017
1.00
Modification of the Left Throttle Mounting
Details
     

 09-20-2017
3.50
Completed Installation of the Right Throttle
Details
       

 09-19-2017
2.50
Right Throttle Design
Details

 09-18-2017
3.50
Completed Installation of Left Throttle
Details
     

 08-29-2017
0.70
Construction of the Throttle Back Plate
Details

 08-28-2017
0.75
Left Throttle Assembly Drilling
Details
     

 08-25-2017
0.75
Installed Anchor Nuts on Bottom of Instrument Pane
Details

 08-21-2017
1.25
Mounted Anchor Nuts for Instrument Panel
Details
     

 08-16-2017
0.50
Layout of the Throttle Quadrant
Details
     

 08-13-2017
1.00
Firewall Pass-Through for Electrical Wiring
Details
     

 08-02-2017
0.75
Drilled Holes on Instrument Panel for Cable Mounts
Details
     

 07-30-2017
3.00
Installed Anchor Nuts on Lower Instrument Pannal
Details
     

 07-07-2017
1.50
Mounting Flang for Electric Fuel Pump
Details
     

 06-11-2017
1.80
Gasalator and Seat Belts
Details
       

 05-03-2017
3.00
Aft Cockpit Trim
Details
     

 04-30-2017
3.00
Storage Brackets and Instrument Panel Layout
Details
       

 04-29-2017
2.50
Stained the Cockpit Plywood Panels
Details
     

 04-26-2017
4.20
Completed Seat Belt Installation
     

 04-23-2017
4.20
Begin Installation of Seat Belts
     

 04-20-2017
2.80
Construction of Storage Compartment
     

 04-18-2017
4.20
Construction of Cockpit Seat
       

 01-16-2017
3.50
Checked Control Cable Routing
Details
       

 09-03-2016
2.00
Assembling the Firewall
Details
     

 08-28-2016
3.00
Install Floor Pans and Rudder Bars
Details

 08-26-2016
3.00
Measured Out Elevator Control Cables
Details
     

 08-09-2016
3.20
Construction of Flight Controls
Details
     

 08-07-2016
2.00
Tuttle Back Assembly Front
Details
     

 08-07-2016
2.50
Floor Foot Channels and Instrument Panel
Details
       

 08-05-2016
2.00
Rudder Bars and Interlink
Details
     

 08-03-2016
3.50
Installation of Rudder Bars
Details
       

 07-22-2016
2.00
Begin Control Stick Construction
Details
     