KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
Work Logs Found: 22
Category Work Time: 283 Hours
 Date
Hours
Work Log Summary

Details

 11-13-2024
5.00
Trim Nose Gear Leg Fairing
Details
       

 09-05-2024
4.00
Main Gear Upper/Lower Intersection Fairings
Details
       

 09-03-2024
6.00
Installing the Main Gear Leg Fairings
Details
       

 08-16-2024
40.00
Fiberglass Fairings Final Prep-Work
Details
       

 08-07-2024
40.00
Fiberglass Final Prep-Work
Details
       

 07-08-2024
30.00
Fiberglass Upper Intersection Fairings
Details
       

 03-01-2024
10.00
Main Gear Shimmy Struts
Details
       

 10-27-2023
15.00
Realign Anti-Splat Nose Job Brace & Fairings
Details
       

 10-25-2023
20.00
Multiple Layer Epoxy Process Nose Gear Fairing
Details
       

 07-28-2023
9.00
Nose Gear Fairing Over the Gear Stiffener (Cont.)
Details

 07-27-2023
12.00
Nose Gear Fairing Over the Gear Stiffener
Details
       

 07-25-2023
8.00
Nose-Gear Nose-Job
Details
       

 11-02-2020
1.00
Nosewheel Stop Backwards
Details
       

 10-06-2020
2.00
More Landing Gear Alignment Pictures
Details
       

 10-01-2020
28.00
Align gear fairings with in-flight airflow
Details
       

 09-10-2020
3.00
Main Landing Gear Fairings (cont.)
Details
       

 09-10-2020
10.00
Main Gear Leg Fairing Installation (cont.)
Details
       

 08-28-2020
8.00
Main Gear Leg Fairing Installation
Details
       

 08-07-2017
9.50
Installed the Nosewheel Gear Leg, Main Fork, Stops
Details
       

 07-29-2017
9.00
Main Landing Gear Brake and Wheel Cont.
Details
       

 07-28-2017
9.00
Installing the Main wheels and brakes
Details
       

 07-27-2017
4.50
Installed the Main Landing Gear
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.