Joe & Steve's RV9A Project
RV9A
Panel/Avionics
Work Logs Found:
26
Category Work Time:
95 Hours
Date
Hours
Work Log Summary
Details
04-27-2018
0.00
test and configure panel and avionics
Details
04-26-2018
0.00
install and power up panel
Details
04-24-2018
0.00
wiring, VPX, AOA
Details
04-23-2018
0.00
sub panel wiring cont.
Details
04-20-2018
0.00
sub panel wiring
Details
04-19-2018
0.00
finish panel, airframe wiring cont.
Details
04-18-2018
0.00
complete panel labeling
Details
04-17-2018
3.75
panel labels
Details
04-05-2018
2.00
test fit panel, begin paint prep
Details
04-04-2018
8.00
complete panel wiring
Details
04-03-2018
2.50
audio wiring cont.
Details
04-02-2018
3.50
audio wiring
Details
03-30-2018
8.75
complete engine/ems wiring, start on audio
Details
03-29-2018
8.50
EMS / engine wiring
Details
03-28-2018
7.50
panel wiring cont.
Details
03-27-2018
9.50
panel wiring
Details
03-26-2018
2.00
making network cables
03-23-2018
7.50
VPX & load analysis
Details
03-22-2018
5.50
panel wiring cont.
03-21-2018
6.50
panel wiring
Details
03-19-2018
8.50
panel mechanicals
Details
02-03-2018
0.00
panel mock up
Details
09-16-2017
1.25
powdercoat brake res and battery hold down
Details
08-16-2017
3.00
pitot tube cont.
Details
08-15-2017
4.50
Heated pitot tube installation
Details
07-26-2017
2.50
install AOA probe
Details
SITE NAVIGATION
RV9A Home
Category
# Logs
# Hours
All
423
1684
Airframe assy/rig
26
95
Airframe Electrical
20
82
Canopy
36
164
Engine/FWF/Prop
28
150
Exterior Prime/Paint
34
148
Fiberglass
50
234
Fuselage
55
233
Hangar
20
Interior paint
16
50
Miscellaneous
37
102
Panel/Avionics
26
95
Prime/Paint
34
148
Upgrades
31
133
Wheels/Brakes/Fuel
10
50