KitLog pro

Powered By Kitlog Pro v2.0

Tom's Mustang II
Work Logs Found: 24
Category Work Time: 126 Hours
 Date
Hours
Work Log Summary

Details

 11-22-2013
15.00
Engine Overhaul
       

 08-30-2005
3.50
Collective lock
Details

 08-22-2005
4.50
New control rods
Details
       

 08-14-2005
6.00
brackets for new control rods
Details

 09-12-2002
4.00
Installed valve covers
Details

 09-12-2002
2.00
FIRST ENGINE RUN
Details

 09-11-2002
1.50
Painted Valve covers
Details

 09-10-2002
0.50
Valve covers
Details

 09-09-2002
4.00
carburator flange
Details

 08-29-2002
6.50
Carburator
Details

 06-24-2002
10.50
Oil Tank, Control Rods, Panel
Details

 06-14-2002
8.00
Oil Tank
Details

 06-13-2002
7.00
Fuel Tanks
Details

 06-12-2002
8.00
Fuel Primer And Tanks
Details

 06-11-2002
8.00
Fuel Lines
Details

 05-14-2002
3.00
Oil Cooler/Carb
Details

 01-15-2002
5.00
Transmission
Details
     

 01-10-2002
4.00
Main Rotor Gearbox
Details

 01-07-2002
4.00
Realigned Main Trans
Details

 01-05-2002
1.00
Alternator
Details

 12-24-2001
2.50
Metal Work
Details

 12-20-2001
4.00
Installed Transmission
Details
     

 11-20-2001
7.00
Shrouding And Alignment
Details

 10-08-2001
6.00
Engine Installation
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.