Powered By Kitlog Pro v2.0
Doug's Web Site
CH 750 Cruzer
Fuel
Work Logs Found:
9
Category Work Time:
32 Hours
Date
Hours
Work Log Summary
Details
12-12-2018
2.00
Installed new fuel pump
Details
12-03-2018
2.50
Fuel flow testing
Details
11-19-2018
2.00
Calibrated right fuel tank
Details
11-17-2018
5.00
Calibrated left tank
Details
11-10-2018
2.00
Drained fuel from left tank
Details
03-07-2018
4.50
Connected fuel lines in cockpit
Details
02-05-2018
7.00
Mounted both baffles, fuel lines, oil cooler
Details
10-20-2017
2.50
Installed course filters and fuel pumps
Details
06-06-2017
4.00
Connected fuel and vent lines to Skytek
Details
SITE NAVIGATION
Contact Builder
CH 750 Cruzer Home
Category
# Logs
# Hours
All
323
1149
Aircraft
1
5
Avionics
5
16
Avionics
16
61
Avionics
38
126
Brakes
38
126
Controls
20
72
Cowl
16
61
Doors
11
38
Empennage
7
26
Engine
29
112
Fuel
9
32
Fuselage
50
184
Miscellaneous
3
8
W&B
38
126
Windows
4
14
Wings
11
45
Wiring
27
97
Copyright © 2001-2024 Matronics. All Rights Reserved.