Powered By Kitlog Pro v2.0
Doug's Web Site
CH 750 Cruzer
Fuselage
Work Logs Found:
50
Category Work Time:
184 Hours
Date
Hours
Work Log Summary
Details
02-17-2019
3.00
Cleaned the Aircraft, Riveted counterweights
Details
11-27-2018
2.00
Configured autopilot roll servo
Details
07-26-2018
4.00
Installed seat belt, screws in arm rest tunnel
Details
07-10-2018
4.00
Oil pressure manifold, skylight
Details
04-16-2018
2.50
Trimmed top skin
Details
04-14-2018
2.50
Drilled top skin L angles
Details
04-13-2018
5.00
Clecoed top skin back on
Details
03-13-2018
3.50
Cut prob hole in cowl
Details
03-12-2018
3.50
Wired master switch
Details
12-08-2017
2.00
Riveted heat valves
Details
12-01-2017
2.00
Installed tow bar
Details
11-28-2017
4.50
Revised heater cables and Parking Brake cable
Details
11-17-2017
2.50
Modified heater push- pull L angle
Details
11-03-2017
3.50
Added B nut to heater butterfly valve
Details
10-27-2017
2.50
Heater flanges and battery strap
Details
09-15-2017
4.00
Installed seat pans and backs
Details
09-14-2017
6.00
Finished carpeting
Details
09-08-2017
2.50
ELT remote control install/audio alert indicator
Details
09-05-2017
4.00
Trimmed the carpet, worked on the instrument panel
Details
09-03-2017
4.00
Constructed template for carpet
Details
09-01-2017
6.00
Installed pax adjustable slide, instrument panel
Details
08-30-2017
4.00
Installed adjustable seat option
Details
08-29-2017
3.50
Installed pilot seat base
Details
08-01-2017
2.50
Worked on instrument panel
Details
07-21-2017
2.00
Covered tunnel and arm rest
Details
07-02-2017
5.00
Nut plates and more
Details
06-26-2017
2.00
Finished other half of rear tunnel
Details
06-25-2017
4.00
Added nut plates to 1/2 of the tunnel
Details
06-24-2017
2.50
Cut inspection hole in pilot side baggage floor
Details
06-23-2017
3.50
Wire work and tapping windshield holes
Details
06-21-2017
3.50
Misc. tasks
Details
06-11-2017
2.50
Clecoed pilot side baggage floor
Details
06-04-2017
3.00
Tapped servo arm for rod end
Details
06-01-2017
3.00
Installed NACA vents with Chemseal
Details
05-16-2017
1.50
Painted top skin
Details
05-15-2017
1.50
Trimmed top skin
Details
05-03-2017
3.50
Added fuel and vent lines
Details
05-02-2017
2.50
Bent fuel and vent tubing
Details
05-01-2017
3.00
Hung pilot door
Details
04-30-2017
2.50
Added Passenger side door gusset
Details
04-29-2017
2.00
Pilot side door gusset
Details
04-26-2017
3.50
Hung a door
Details
04-25-2017
1.00
Expanded holes in rear of top window
Details
04-23-2017
1.50
Drilled door hinges
Details
04-22-2017
2.00
Expanded holes in top window
Details
04-19-2017
3.00
Drilled top windshiel and sunroof
Details
04-18-2017
5.00
Windshield trimming, side Z channel
Details
04-12-2017
3.00
Trimmed sides of windshield
Details
04-03-2017
3.50
Fuel low level sensor and NACA vents
Details
03-30-2017
30.00
Fit and cut windshield
Details
SITE NAVIGATION
Contact Builder
CH 750 Cruzer Home
Category
# Logs
# Hours
All
323
1149
Aircraft
1
5
Avionics
5
16
Avionics
16
61
Avionics
38
126
Brakes
38
126
Controls
20
72
Cowl
16
61
Doors
11
38
Empennage
7
26
Engine
29
112
Fuel
9
32
Fuselage
50
184
Miscellaneous
3
8
W&B
38
126
Windows
4
14
Wings
11
45
Wiring
27
97
Copyright © 2001-2024 Matronics. All Rights Reserved.