KitLog pro

Powered By Kitlog Pro v2.0

Jeff's RV9A Build
Work Logs Found: 73
Category Work Time: 137 Hours
 Date
Hours
Work Log Summary

Details

 03-25-2018
1.00
Deburr rudder skin and prep for pain
Details
       

 03-21-2018
1.00
Disassemble Rudder
Details
       

 03-19-2018
1.00
Rudder bottom attach strips
Details
       

 03-18-2018
6.00
Clecoed rudder skeleton, skin and horn
Details
       

 03-11-2018
4.00
Fabricated Rudder stiffners & attaced to Skin
Details
       

 02-05-2018
1.00
Trimmed Rudder Stiffner
Details
       

 02-04-2018
1.00
Riveted aft spar to skin
Details
       

 02-01-2018
1.00
Riveted VS bottom and top rib to Skin
Details
       

 01-30-2018
2.00
Riveted VS doubler and hinges to Aft Spar
Details
       

 01-29-2018
3.00
Riveted VS forward Spar and VS center rib to Skin
Details
       

 01-28-2018
1.00
Riveted Ribs to VS forward spar, Front Spar to ski
Details
       

 01-27-2018
2.00
Primed Vertical Stabilizer parts
Details
       

 01-26-2018
1.00
Counter sink Fwd side of VS Aft Spar doubler
Details
       

 01-19-2018
1.00
Dimple Vertical Stabilizer
Details
       

 01-12-2018
2.00
Dimple Vertical Stabilizer
Details
       

 01-07-2018
1.00
Deburr Vertical stabilizer skin
Details
       

 01-06-2018
3.00
Deburred vertical stabilizer ribs, doubler & spars
Details
       

 01-03-2018
1.25
Match drilled all #40 Vertical stabilizer skin hol
Details
       

 12-30-2017
1.00
Attach skin to Vertical Stabilizer
Details
       

 12-26-2017
2.00
Assemble Vertical Stabilizer Ribs and Spars
Details
       

 12-19-2017
2.00
HS911 inboard hinge brackets & VS146 bearing
Details
       

 12-17-2017
2.00
Riveted Horizontal Skin to AFt Spar
Details
       

 12-16-2017
3.00
Riveted Horizontal Main Ribs to Aft Spar
Details
       

 12-13-2017
1.00
Clecoed Aft Spar to Horizontal Stabilizer
Details
     

 12-04-2017
4.00
Riveting Main Ribs to Skin
Details
       

 12-03-2017
3.00
Riveted Horizontal Stabailizer Skin to Forward Spa
Details
       

 11-27-2017
2.00
Attach Horizontal skin to Skeleton
Details
       

 10-29-2017
2.00
center nose rib into horizontal stabilizer skin
Details
       

 10-19-2017
2.00
Rivet Nose and Main Ribs to Front Spar
Details
     

 10-05-2017
2.00
Scuff sanded & Primed Horizontal stabilizer
Details
       

 10-04-2017
2.00
Prep and prime Main Ribs
Details
       

 10-02-2017
4.00
Rivet aft Spars to Doubler, Rivet Hinge Brackets t
Details
       

 09-28-2017
3.00
Prepare Nose ribs, HS 903 Spars, and HS 906 Double
Details
       

 09-27-2017
2.00
Riveted Front Spar, Doubler, Spar and Attach Angl
Details
       

 09-26-2017
1.00
Clecoed Forward Spar & Doulbler together.
Details
       

 09-23-2017
2.00
Labeled and Prepped parts for priming. Primed
Details
       

 09-21-2017
2.00
Marked And Counter sunk Holes On Rear Spar and Fro
Details
       

 09-15-2017
2.00
Counter Sink #40 holes on L/H forward Spar Flange
Details

 09-13-2017
2.00
Counter Sink #40 holes on R/H forward Horizontal S
Details

 09-12-2017
2.00
Dimpled R/H Horizontal Stabilizer Skin
Details
     

 09-10-2017
2.00
Dimpled L/H Horizontal Stabilizer Skin
Details
     

 09-08-2017
1.00
Dimpled R/H nose and main ribs
Details
       

 09-06-2017
1.00
Dimpled L/H Nose and Main Ribs
Details
       

 08-29-2017
2.00
Deburr R/H Horizontal Stabilizer Ribs, Skin, and S
Details
       

 08-27-2017
4.00
Deburr Horizontal Stabilizer Skin, Ribs, and Spars
Details
       

 08-25-2017
2.00
Dissasemble Horizontal Stabilizer
Details
       

 08-24-2017
0.50
Used Borescope to check Alignment of Rib
Details
       

 08-21-2017
1.00
Match Drilled R/H Bottom Horizontal Stabilizer Ski
Details
       

 08-19-2017
1.00
Match Drilling R/H Top Horizontal Stabilizer Skin
Details
     

 08-17-2017
1.00
Match Drilling L/H Bottom Horizontal Stabilizer S
Details
     

 08-15-2017
1.00
Match Drilled L/H Top Horizontal Stabilizer skin
Details
       

 08-11-2017
3.00
Assemble Right Horizontal Stabilizer in Jig
Details
       

 08-06-2017
4.00
Assembling Horizontal Stabilizer in Jig
Details
       

 08-05-2017
1.00
Set-up Jig Cradle Blocks
Details
       

 08-04-2017
4.00
Disassemble Horizontal Debur all #30 Holes
Details
       

 07-30-2017
5.50
HS904 Main Ribs & HS905 Nose Ribs
Details
       

 07-30-2017
2.00
Fluting and Attaching HS904 Main & HS905 Nose Ribs
Details
       

 07-27-2017
2.00
Preparing HS 904 Main Ribs
Details
       

 07-26-2017
0.50
Match Drilled HS 912 Hinge Brackets
Details
       

 07-25-2017
0.50
Rear Spar Doubler and Elevator Hinges
Details
       

 07-25-2017
1.00
Match Drilled HS 908 L & R attach angles
Details
       

 07-24-2017
1.00
Drilling HS 908 attach angles
Details
       

 07-23-2017
2.00
HS 908 L attach angle
Details
     

 07-16-2017
3.00
Cutting out HS908 L & R Attach Angles
Details
       

 07-15-2017
0.01
HS908 Attach Angle Continued
Details
       

 07-15-2017
2.00
HS 908 Attach Angles
Details
       

 07-12-2017
2.00
Skeleton of the Horizontal Stabilizer
Details
       

 07-10-2017
1.00
Empennage Hardware stored in bins and labeled
Details
     

 07-09-2017
1.00
Finished Inventory
Details
     

 07-08-2017
1.00
Inventory of empennage kit
Details
       

 07-07-2017
0.50
Unpacking Box # 2
Details
     

 07-06-2017
2.00
Inventory
Details
       

 07-05-2017
0.50
Empennage has Arrived
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.