KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
Work Logs Found: 21
Category Work Time: 38 Hours
 Date
Hours
Work Log Summary

Details

 06-09-2024
2.70
Glare shield lighting
Details
       

 08-14-2021
3.50
Installed the pilot LED lights
Details
       

 08-13-2021
1.50
Red Pilot LED build up
Details
     

 08-12-2021
2.50
White Pilot LED built up
Details
       

 07-24-2021
1.50
Upgrades to the front cockpit LEDs
Details

 07-24-2021
0.70
Right side GIB LED lighting upgrade
Details
     

 06-29-2021
0.90
Lighting - tests
Details
       

 04-27-2021
1.20
Rear Passenger Light (GIB) replaced LED-left
Details
       

 04-25-2021
1.50
Re-Do Rear Baggage LED lights
Details

 12-06-2020
2.30
Wiring Pitot / Heater
Details
       

 12-05-2020
3.10
Ran wing tip lighting wires
Details
       

 12-04-2020
1.00
Wing tip light interference
Details
     

 09-10-2020
1.00
Bonding the landing light pivot point mount
Details
       

 09-09-2020
2.50
Landing/Taxi light install
Details
       

 11-02-2019
1.00
Wingtip lighting – Landing/Taxi lights
Details
     

 01-15-2018
1.50
Wingtip position lights
Details
       

 01-14-2018
3.00
Wingtip landing lighting
Details
     

 12-18-2017
2.00
Wingtip Lighting – Left wingtip
Details
     

 12-12-2017
1.50
Wingtip Lighting – Right wingtip
Details
       

 11-11-2017
3.20
AeroLED wingtip light install
Details
       

 06-15-2017
0.00
AeroLED lights arrive
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.