Powered By Kitlog Pro v2.0
Bobs Ten
RV-10
Cowling
Work Logs Found:
66
Category Work Time:
147 Hours
Date
Hours
Work Log Summary
Details
06-17-2020
3.50
Modify Cowl
Details
06-16-2020
2.90
Modify Cowl
Details
06-12-2020
4.00
Modify Cowl
Details
06-11-2020
1.00
Modify Cowl
Details
06-10-2020
3.50
Modify Cowl
Details
06-09-2020
3.20
Modify Cowl
Details
06-08-2020
2.50
Install Intake System
Details
08-23-2019
2.00
Install Fiberfrax in Cowling
Details
07-14-2019
2.00
Install Fiberfrax in Cowling
Details
07-05-2019
2.00
Install Fiberfrax in Cowling
Details
07-04-2019
1.20
Install Fiberfrax in Cowling
Details
07-03-2019
2.70
Sand and Seal Cowling
Details
07-02-2019
2.00
Sand and Seal Cowling
Details
06-22-2019
1.20
Paint Interior Cowling
Details
06-16-2019
2.00
Paint Interior Cowling
Details
06-01-2019
3.00
Sand and Seal Cowling, Electrical
Details
05-31-2019
1.70
Sand and Seal Cowling
Details
05-26-2019
2.00
Sand and Seal Cowling
Details
05-21-2019
2.00
Sand and Seal Cowling
Details
05-20-2019
2.30
Sand and Seal Cowling
Details
05-19-2019
2.70
Sand and Seal Cowling
Details
05-18-2019
2.00
Sand and seal Cowling
Details
05-17-2019
2.00
Sand and Seal Cowling
Details
05-16-2019
1.90
Sand and Seal Cowling
Details
12-30-2017
3.00
Misc Tasks
Details
12-22-2017
3.00
Install Oil Door
Details
12-21-2017
2.00
Install Oil Door
Details
12-20-2017
1.00
Install Oil Door
Details
12-19-2017
2.00
Install Oil Door
Details
12-16-2017
1.50
Install Oil Door
Details
12-15-2017
1.70
Install Oil Door
Details
12-14-2017
1.50
Install Oil Door
Details
12-13-2017
2.50
Install Oil Door
Details
09-07-2017
3.50
Install Cowling
Details
09-02-2017
4.00
Install Cowling
Details
08-29-2017
2.50
Install Cowling
Details
08-27-2017
2.30
Install ShowPlanes Intake System
Details
08-22-2017
3.10
Install Cowling
Details
08-21-2017
1.60
Install Cowling
Details
08-20-2017
2.00
Install Cowling
Details
08-19-2017
4.70
Install Cowling
Details
08-18-2017
2.20
Install Cowling
Details
08-13-2017
0.60
Install Cowling
Details
08-13-2017
1.50
Install Cowling
Details
08-06-2017
4.40
Install Cowling
Details
08-05-2017
2.40
Install Cowling
Details
08-01-2017
1.80
Install Cowling
Details
07-31-2017
2.00
Install Cowling
Details
07-30-2017
3.80
Details
07-29-2017
1.30
Install Cowling
Details
07-29-2017
1.00
Install Cowling
Details
07-24-2017
4.00
Install Cowling
Details
07-23-2017
1.60
Install Cowling
Details
07-23-2017
2.00
Install Cowling
Details
07-19-2017
2.50
Install Cowling
Details
07-17-2017
2.50
Install Cowling
Details
07-16-2017
1.80
Install Cowling
Details
07-15-2017
2.30
Install Cowling
Details
07-12-2017
3.20
Install Cowling
Details
07-10-2017
0.80
Install Cowling
Details
07-09-2017
1.50
Install Cowling
Details
07-08-2017
1.80
Install Cowling
Details
07-08-2017
1.00
Install Cowl
Details
07-07-2017
1.00
Install Cowling
Details
06-24-2017
1.50
Install Cowling
Details
06-23-2017
1.60
Install Cowling
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1466
2834
Access Panels
24
49
Aileron
2
3
Aileron Actuation
17
28
Avionics
154
396
Baggage Area
26
38
Baggage Door
9
17
Bottom Wing Skins
9
21
Brake Lines
13
19
Brakes
7
15
Cabin Top
100
165
Control System
28
57
Cowling
66
147
Doors
94
174
Electrical
103
219
Elevator
64
76
Empennage
3
6
Empennage Attach
23
36
Empennage Fairings
26
33
Engine
114
249
Engine Start Prep
5
35
ER Fuel Tanks
28
55
Fairings
54
108
Flaps
8
12
Flight Controls
2
10
Floor Panels
1
4
Front Fuselage
2
5
Fuel Lines
24
40
Fuel Tanks
3
8
Fuselage
18
60
Heat Valves
13
31
Horizontal Stab
49
54
Instrument Panel
21
62
Interior
15
39
Inventory
7
25
Landing Gear
6
16
Lighting
3
8
Miscellaneous
17
55
Moving
2
6
Practice Tool Box
2
4
QB Fuselage
21
38
Rear Spar
1
0
Rudder
33
27
Rudder Pedals & Brak
15
28
Rudder Pedals and Br
1
1
Seat Backs
7
14
Seats
4
10
Shipping
1
1
Tailcone
90
103
Tailcone Attachment
2
5
Tools
1
2
Top Wing Skins
2
1
Vertical Stab
26
28
Wheels
3
8
Windows
8
21
Wing
4
6
Wing Attach
30
49
Wing Ribs
1
1
Wing Spar
1
2
Wing Tips
19
38
Wings
34
66
Copyright © 2001-2024 Matronics. All Rights Reserved.