Powered By Kitlog Pro v2.0
Peters Web Site
RV-9A
11 Instrument Panel
Work Logs Found:
69
Category Work Time:
184 Hours
Date
Hours
Work Log Summary
Details
06-09-2024
1.00
Compass Deviation Card
Details
03-28-2023
0.50
Instrument Panel Placard
Details
03-19-2023
1.00
4: Instrument Panel Labelling
Details
03-13-2023
1.00
4: Compass Adjustment Access Holes
Details
03-10-2020
0.50
2: Panel Screws
Details
03-10-2020
1.50
1: Vent and Throttle Brackets
Details
02-15-2020
2.50
3: USB Power Outlet
Details
02-15-2020
1.50
2: Throttle Mixture Bracket
Details
02-14-2020
1.50
Throttle/Mixture Bracket
Details
02-01-2020
1.50
2: Throttle/Mixture Bracket
Details
01-27-2020
1.00
5: Engine Controls
Details
01-27-2020
1.00
3: Engine Controls Bracket
Details
01-04-2020
4.00
Reinstalled Instrument Panel
Details
12-24-2019
0.00
Instrument Panel is Painted
Details
12-14-2019
0.50
2: Instument Panel
Details
12-01-2019
1.00
3: Flushing Instrument Panel Rivets
Details
10-19-2019
2.00
2: Map Box Door
Details
09-22-2019
2.00
2: Map Box
Details
09-21-2019
3.50
2: Map Box Door
Details
09-15-2019
2.00
1: Map Box
Details
09-14-2019
3.00
2: Map Box Door
Details
06-23-2019
2.00
2: Fresh Air Vents
Details
06-02-2019
2.00
2: Map Box
Details
04-27-2019
1.00
1: Angle of Attack HUD
Details
04-26-2019
1.00
2: Panel Switch Lighting
Details
04-21-2019
14.00
EFIS Wiring
Details
03-23-2019
4.00
1: CO Monitor
Details
03-10-2019
2.50
1: Relocating the VHF Com
Details
03-09-2019
0.50
4: Instrument Panel Wiring Loom
Details
03-09-2019
3.50
3: CO Monitor Wiring
Details
03-09-2019
1.00
2: USB Power Outlet
Details
03-03-2019
0.00
2: Instrument Panel Taking Shape
Details
03-03-2019
5.00
1: Panel Switch Wiring
Details
03-02-2019
2.50
1: Nav/Strobe Switch Wiring
Details
02-24-2019
6.50
Panel Switch Wiring
Details
02-23-2019
6.00
Panel Switch Wiring
Details
02-22-2019
4.00
1: Panel Wiring
Details
02-03-2019
6.00
1: Panel Switch Wiring - Take 2
Details
02-02-2019
1.00
2: Testing the Panel Switch Backlights
Details
02-02-2019
5.00
1: Panel Switch Wiring - Take 1
Details
01-28-2019
2.00
CO Monitor Warning Light
Details
01-27-2019
4.00
2: Instrument Panel Nutplates
Details
01-27-2019
2.00
1: Magnetic Compass Installation
Details
01-26-2019
3.00
Audio Mixer and AoA Switch Panel
Details
01-13-2019
4.00
Instrument Panel
Details
01-11-2019
2.50
Instrument Panel Cut-Outs
Details
01-10-2019
1.50
Instrument Panel Cut-Outs
Details
01-09-2019
1.00
Instrument Panel Cut-Outs
Details
01-08-2019
1.50
Instrument Panel Cut-Outs
Details
01-07-2019
1.00
Instrument Panel Cut Outs
Details
01-06-2019
4.50
1: Instrument Panel Cut-Outs and Layout
Details
01-05-2019
4.00
2: Additional Sub-Panel Mounting Plate
Details
01-05-2019
2.00
1: Instrument Panel Cut-Out
Details
12-15-2018
6.50
More Panel Wiring
Details
12-03-2018
2.00
More Panel Wiring
Details
12-02-2018
7.00
More Panel Wiring
Details
12-01-2018
3.00
Instrument Panel Wiring
Details
11-11-2018
4.00
The Wiring Begins
Details
11-10-2018
5.00
AoA Control Box Bracket
Details
11-04-2018
2.00
2: AoA Bracket
Details
11-04-2018
4.00
1: Mounting Avionics
Details
11-03-2018
3.00
3: Started Mounting Avionics
Details
11-03-2018
2.00
1: Instrument Panel Layout
Details
10-21-2018
1.50
4: Fresh Air Vents
Details
06-30-2018
1.50
1: Instrument Panel Map Box
Details
06-24-2018
1.50
3: Instrument Panel Map Box
Details
06-24-2018
2.00
2: Instrument Panel Map Box
Details
11-05-2017
5.00
1: Instrument Panel Layout Rev 02.01
Details
06-10-2017
1.00
2: Map Box
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
979
2250
01 Workshop
10
02 Tools
24
4
03 Empennage
145
324
04 Wings
84
236
05 Fuselage
140
392
06 Firewall
33
79
07 Engine/Propellor
134
359
08 Avionics
38
118
09 Lighting
29
70
10 Electrical
35
88
11 Instrument Panel
69
184
12 Fuel System
27
65
13 Canopy
75
186
14 Landing Gear
16
46
15 Cockpit Interior
20
46
17 Painting
1
3
28 CofA
7
19
29 Regulatory
4
17
49 Miscellaneous
37
14
50 YMTG Hangar
51
Copyright © 2001-2024 Matronics. All Rights Reserved.