Powered By Kitlog Pro v2.0
N2C...CruZer
CH 750 CruZer
Cabin
Work Logs Found:
28
Category Work Time:
72 Hours
Date
Hours
Work Log Summary
Details
01-08-2018
2.00
Seat Base/Tunnel Riveting
Details
01-05-2018
3.00
Riveted Firewall, brake cylinders, fire barrier
Details
01-02-2018
2.00
Lower Engine Mounts
Details
12-31-2017
1.00
Upper Engine Mounts
Details
12-30-2017
1.00
Front Side Skin L Angles
Details
12-29-2017
1.50
Front Side Skin Doublers
Details
12-16-2017
2.00
Cabin Front L Angles
Details
12-15-2017
2.00
Firewall Mounted
Details
12-13-2017
2.00
Mounted Brake Pedals
Details
12-12-2017
3.00
Firewall riveted...mostly
Details
12-11-2017
3.50
Powdercoat and Firewall
Details
12-09-2017
2.50
Brake Pedals
Details
12-08-2017
8.00
Rivet Cabin/ Landing Gear Weldments
Details
11-22-2017
3.00
Riveting
Details
11-17-2017
1.00
Corrosion proof steel frame
Details
11-08-2017
2.00
Reassemble cabin/Powder Coating
Details
11-06-2017
1.00
Clecoing back together
Details
10-27-2017
8.00
Deburring
Details
09-25-2017
1.50
Gear Channel Doublers
Details
09-22-2017
1.50
Seat Base and gear channel doublers
Details
06-21-2017
3.00
LG Weldments
Details
06-20-2017
3.00
Attached Steel Cabin Frame
Details
06-19-2017
3.00
Seat Pans
Details
06-15-2017
2.50
Attached Cabin Floor to Fuselage
Details
06-13-2017
1.50
Co-Pilot brake brackets
Details
06-12-2017
1.50
Sidewall L angles
Details
06-10-2017
3.00
Cabin Floor
Details
06-09-2017
2.50
Cabin Floor...Rudder Pedals
Details
SITE NAVIGATION
Contact Builder
CH 750 CruZer Home
Category
# Logs
# Hours
All
192
441
Aileron/Elevator Div
2
8
Auto Pilot
2
4
Cabin
28
72
Controls
10
24
Dual Sticks
3
9
Elevator
14
35
Engine
12
6
Flaperons
6
16
Fuel Senders
5
12
Fuselage
29
70
Horizontal Stab
5
14
Landing Gear
13
31
Miscellaneous
6
2
Rudder
3
8
Vertical Fin
10
22
Wings
44
108
Copyright © 2001-2024 Matronics. All Rights Reserved.