KitLog pro

Powered By Kitlog Pro v2.0

Dick's Web site
Work Logs Found: 38
Category Work Time: 121 Hours
 Date
Hours
Work Log Summary

Details

 03-29-2006
1.50
Insert hinge pins of HZ
Details
       

 03-26-2006
2.00
Finish elevators &I attach to HZ
Details
       

 03-22-2006
2.00
The elevators Fit!!
Details
       

 03-22-2006
2.50
Prime, assemble and partway rivet elevators
Details
       

 03-21-2006
3.50
Elevator prep

 03-17-2006
3.50
Fitting hinges to elevators
Details
       

 03-16-2006
4.00
Horizontal Stabilizer is DONE!!
Details
       

 03-15-2006
4.50
Horiz Stab
Details
       

 03-14-2006
4.50
Horiz Stab Ready to rivet
Details

 03-13-2006
4.00
Prep horiz stab for rivet
Details

 03-08-2006
1.50
Second side skin of HZ
Details
     

 03-02-2006
1.00
Finally got one side of each skin attached

 02-28-2006
2.00
Work on rebuilding the horizont Stab
Details

 02-27-2006
1.00
Disassemble horiz stab and prepare to install new
Details
     

 02-23-2006
2.00
First Assembly of elevator/rib assembly
Details
     

 02-20-2006
2.00
rebuild internal ribs
Details
       

 02-02-2006
8.00
Rudder almost done
Details
       

 02-01-2006
6.00
Finish vert stab
Details
       

 01-31-2006
5.00
Drilling to copper cleco and fit skin on Vert Stab
Details
       

 01-27-2006
2.00
Fitting skin to Vert Stab
Details
       

 01-25-2006
5.00
Trying to fit skin
Details

 01-24-2006
5.00
Vert Stab
Details

 01-23-2006
3.00
Front spar prep
Details
       

 01-21-2006
2.00
Finished a sub part!
Details
       

 01-20-2006
3.00
Fit top HZ Stab skin
Details

 01-12-2006
2.00
Vertical Stabilizer
Details
       

 01-11-2006
4.00
Fitting HZ skins
Details

 01-10-2006
5.00
Horiz stab & Vert stab
Details
       

 01-09-2006
4.00
Tip ribs installed
Details
       

 01-06-2006
2.00
Horiz stab & elevaor skins
Details
       

 01-05-2006
5.00
Horizontal Stabilizer
Details
       

 01-03-2006
4.00
Trim tab ass'y
Details
       

 01-01-2006
1.00
lay out trim tab and clip

 12-28-2005
5.00
First Cleco's
Details
       

 12-24-2005
2.00
Bracket T06-06
Details
       

 12-23-2005
2.50
Fabricate parts
       

 12-22-2005
2.00
Finished remade T03-04
Details

 12-15-2005
2.00
T 03-03
Details
 










Copyright © 2001-2024 Matronics. All Rights Reserved.