Powered By Kitlog Pro v2.0
Dave's RV-10 Build Log
RV-10
Firewall Forward
Work Logs Found:
51
Category Work Time:
273 Hours
Date
Hours
Work Log Summary
Details
04-22-2020
5.25
Oil Door Latch
Details
03-30-2020
2.50
Revised Top Cowl Firewall Pin Clip
Details
03-25-2020
3.75
Cowl Re-Fitting
Details
03-23-2020
4.50
Modified Left Cooling Air Inlet Ramp
Details
03-20-2020
5.00
Removable Snorkle - Part 3
Details
03-19-2020
3.00
Snorkle Removal Part 2
Details
03-17-2020
3.25
Lower Cowl Snorkle Removal
Details
08-21-2019
7.00
Re-Installed Heater Controls Mount Sure Start
Details
02-04-2019
5.00
Ground Straps, Throttle Quadrant, Fiberglass Bump-
Details
01-28-2019
5.75
Wiring for Starter, Alternator, & Compressor
Details
01-22-2019
4.75
Propeller Install, Seat Heater Wires, Cowl Bumpout
Details
01-07-2019
3.75
Installed Mufflers/Heat Muffs
Details
03-25-2018
0.00
Fractured Foot - Work Will Be Delayed
Details
03-23-2018
6.75
FAB Install & Exhaust Headers
Details
03-22-2018
7.75
Filtered Air Box Baffling
Details
03-21-2018
1.75
Air Box Inlet Work
Details
03-20-2018
6.00
Engine Control Cables Installed
Details
03-19-2018
1.75
Filtered Air Box Inlet Fiberglass Fab
Details
03-06-2018
1.50
Cowl to Filtered Air Box Fab
Details
03-05-2018
3.00
Cowl To Filtered Air Box
Details
03-02-2018
4.75
Air Box to Cowl Connection Fab
Details
03-01-2018
4.00
Filtered Air Box
Details
02-28-2018
7.25
Filtered Air Box Creation
Details
02-27-2018
7.00
Filtered Air Box
Details
02-26-2018
4.00
Filtered Air Box
Details
02-23-2018
7.00
Determing Control Cable Lengths & Routings
Details
02-20-2018
6.75
Throttle Body Install & Cowl Pin Cover Plates
Details
02-16-2018
7.50
Rivet Baffle Seals; Installed Oil Cooler & CHT Pro
Details
02-15-2018
7.25
Fabricating Baffle Seals
Details
02-14-2018
6.00
Installing Baffle Seals
Details
02-13-2018
8.00
Baffle Tension Rods & Spark Plug Top Wires
Details
02-12-2018
7.25
Finished Trimming Baffles
Details
02-09-2018
5.50
Trimming Baffles
Details
02-08-2018
7.25
Baffle Trimming
Details
02-07-2018
7.25
Front Inlet Ramp Baffles - Continued
Details
02-06-2018
6.75
Left Inlet Ramp Baffles
Details
02-05-2018
8.00
Left Inlet Ramp Fitting and Front Baffles
Details
12-12-2017
3.75
Left Intake Baffle Modification for Air Conditione
Details
12-11-2017
3.75
Air box Alternate Air Door and Drain Tube
Details
12-01-2017
6.00
Air Box Fabrication
Details
11-28-2017
6.50
Engine Baffle Prep and Cowling Prep. Door Switch
Details
11-22-2017
4.00
Baffles Install & Cowl Trim
Details
11-21-2017
7.25
Baffles Fabrication & Installation
Details
11-20-2017
5.50
Engine Baffles
Details
11-17-2017
7.25
Engine Baffles Fabrication
Details
11-16-2017
7.25
Alternator Install & Baffles
Details
11-15-2017
6.50
Engine Installation
Details
11-13-2017
6.00
Prep Rear of Engine For Installation
Details
11-08-2017
6.00
Install Backup Alternator onto Engine
Details
11-07-2017
5.00
Began Preping Engine for Mounting
Details
05-18-2017
5.00
Inventory
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
603
3188
Air Conditioner
22
95
Avionics
137
757
Electrical
30
143
Empennage
46
271
Engine
9
38
Finishing Kit
115
568
Firewall Forward
51
273
Fuselage
106
545
Miscellaneous
38
192
Phase 1
3
14
Shop Supplies
3
10
Tools
1
1
Wings
32
209
Wings & Fuselage
10
72
Copyright © 2001-2025 Matronics. All Rights Reserved.