KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
Work Logs Found: 26
Category Work Time: 80 Hours
 Date
Hours
Work Log Summary

Details

 03-11-2019
2.50
Painted Nose wheel pant.
Details
       

 03-06-2019
1.50
Sanded and primed main wheel pants.
Details
       

 02-27-2019
2.00
Installed a mount fior a tow bar on the nose gear.
Details
       

 02-12-2019
3.50
Cut my Pattern for the gear leg fairings.
Details
       

 11-24-2018
1.25
Poster board cutout of gear leg fairing installed.
Details
     

 11-23-2018
2.50
Cut Landing gear fairing from .025 sheet.
Details
       

 11-20-2018
1.00
glazing compound to smooth out the seam of the whe
Details
       

 11-16-2018
2.25
Install wheel pants.
Details
       

 11-01-2018
2.00
Work on brakes.
Details
       

 11-01-2018
2.25
Make wheel pants.
Details
       

 03-09-2018
2.50
Nose gear wheel pant.
Details
       

 01-02-2018
4.00
Installed the cable guide and brake cables.
Details
       

 11-09-2017
6.00
Installing the nose pant.
Details
       

 08-24-2017
3.50
Check gear toe-in.
Details
       

 08-23-2017
6.00
Paint and install nose gear.
Details
       

 08-22-2017
6.00
Preparing and fitting nose gear assembly.
Details
       

 08-21-2017
4.50
Prepare the front landing gear.
Details
       

 08-14-2017
4.75
Installed drum brakes.
Details
       

 08-11-2017
4.75
Toe-in and drill gear legs.
Details
       

 08-07-2017
4.00
Setting the main gear toe-in.
Details
     

 08-04-2017
0.01
Setting the toe-in.
Details

 07-12-2017
2.25
Positioning the landing gear axles.
Details
     

 06-28-2017
5.75
Installed landing gear fuselage attachments.
Details
       

 05-25-2017
2.25
Remove broken bit and Drill gear leg .
Details
       

 05-17-2017
2.00
Drill hole in gear leg.
Details

 05-14-2017
1.00
Attempt to drill drill landing gear leg.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.