Davids Pipistrel Build Website
Work Logs Found: 41
Category Work Time: 96 Hours
 Date
Hours
Work Log Summary

Details

 08-08-2021
1.00
Installed static and pitot air tubes in baggage co
Details

 10-05-2019
3.00
Added Defoster Fan Breaker to electrical panel
Details
     

 09-16-2019
8.00
Installed aluminum ground plane
Details
     

 08-14-2019
5.00
Routed and connected ELT harness
Details

 08-13-2019
4.00
Manufactured ELT cable harness
     

 08-13-2019
3.00
Epoxied carbon fibre to ELT tray
Details
     

 08-12-2019
2.00
Epoxied ELT transmitter tray to inside of fuselage
Details
     

 08-12-2019
2.00
cutout templates for a ground plane under the com

 08-11-2019
2.00
Installed com antenna

 05-11-2019
1.00
Tested VHF COM Radio
Details

 04-28-2019
1.00
Installed top instrument panel top (dashboard)
       

 11-18-2018
4.00
Tested ADSB
Details

 11-17-2018
1.00
Ran backup battery tests
Details

 11-11-2018
2.00
Configured Dynon so it can find new items on bus
Details

 11-04-2018
2.00
Leveled turn cordination ball in instrument panel
Details

 11-03-2018
1.00
Connected Static and Pitot tube to instruments
Details

 10-28-2018
3.00
Manufactured ground planes for ADSB, Transponder
Details
       

 09-25-2018
6.00
Mounted ADSB and Transponder Antennas
Details
       

 08-26-2018
4.00
Planned electronics location in rear baggage floor
Details

 08-18-2018
3.00
Drilled holes on fuselage for Elevator servo
Details

 04-29-2018
0.50
Test fit elevator servo

 12-29-2017
2.00
Drilled hole in cockpit bulkhead for pitot lines
Details

 09-16-2017
0.50
Removed D1000 Instrument wiring harness
Details

 09-16-2017
1.00
Installed Pilot/Copilot Headphone Jacks
Details

 09-10-2017
1.00
Setup/Tested engine management page on Dynon
Details

 09-09-2017
2.00
installed USB/AUX connectors
Details

 09-09-2017
2.00
Installed latest Software/Database on Dynon
Details

 09-09-2017
0.50
Installed Instruments
Details
     

 09-09-2017
1.00
Installed Dynon networking cables
Details

 09-03-2017
0.50
Installed Instrument panel
Details
       

 09-03-2017
4.00
Installed nutsert fittings on instrument panel
Details
       

 09-02-2017
6.00
Cut out instrument panel with CNC router
Details
       

 07-30-2017
4.00
Added Headphone jacks to breaker panel
Details
     

 05-13-2017
1.50
Connected sensor wires to DB32 connector on EMS 22
Details
       

 05-12-2017
1.50
Mounted Dynon backup batteries
Details
     

 04-29-2017
2.00
Installed Instrument panel base
Details
     

 03-19-2016
4.00
Ran heated pitot tube connections throught the win
Details

 11-27-2015
2.00
Layed out instrument panel in cad program
Details
     

 11-24-2015
1.00
ran static line to adhrs unit
Details

 11-23-2015
0.50
Epoxied static air tube fittings to sides of fusel

 09-08-2015
1.00
Ran wire for ADAHRS unit to front of cockpit
Details
     