KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
Work Logs Found: 16
Category Work Time: 66 Hours
 Date
Hours
Work Log Summary

Details

 08-17-2019
0.50
Started engine and ran util oil temp reached 215 d

 05-04-2019
0.50
Started Engine

 11-21-2018
1.00
Started Engine
Details

 07-15-2018
0.50
Started Engine
Details

 05-22-2018
0.50
Started engine
Details

 01-10-2018
3.00
Installed power panel (again) and started engine
Details

 11-02-2017
1.00
Started Engine
Details

 09-10-2017
2.00
Started Engine
Details

 09-09-2017
2.00
Installed Engine RS232 connectors
Details

 07-15-2017
2.50
Installed air filter and engine air inlet hose
Details
       

 02-25-2017
4.00
Extended the front air scoop for air cooling the e
Details
     

 01-21-2017
8.00
Routed and connected all the engine wiring
Details
       

 01-14-2017
8.00
Installed oil lines
Details
     

 12-28-2016
2.50
Installed large fuel filter
Details
     

 09-10-2016
6.00
Installed Engine
Details
       

 07-16-2016
24.00
Installed new generator mod to the 912is engine
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.