Date
|
Hours
|
Work Log Summary

|
Details

|
07-28-2018
|
1.00
|
High Speed Taxi Testing and Compass Calibration (D
|
Details
|
  |
|
07-01-2018
|
2.00
|
ELT GPS Testing/Ops Testing and AP Servo config an
|
Details
|
|
|
05-03-2018
|
0.50
|
Dynon file update and back up battery charged.
|
Details
|
  |
|
01-31-2018
|
1.50
|
Added final placards - panel now done!
|
Details
|
|
|
01-29-2018
|
1.00
|
Avionics Access Hatch - FIPS seals completed.
|
Details
|
|
|
01-28-2018
|
1.00
|
Shimmed ADAHRS to center slip/skid ball w/ .025" s
|
Details
|
  |
|
01-24-2018
|
0.00
|
More final wiring shots.
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots.
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots.
|
Details
|
|
|
01-24-2018
|
0.00
|
More final wiring shots
|
Details
|
|
|
01-24-2018
|
3.00
|
Finished Tie Wraps for all forward wiring, Install
|
Details
|
|
|
01-22-2018
|
4.00
|
Dynon Skyview Configuration - finished & Batt Test
|
Details
|
|
|
01-21-2018
|
3.00
|
Dynon Skyview Configuration
|
Details
|
  |
|
01-20-2018
|
1.00
|
New panel screws installed, thicker mic/phone isol
|
Details
|
  |
|
01-19-2018
|
2.50
|
Panel Done!
|
Details
|
|
|
01-18-2018
|
3.00
|
Wired stack and installed main main panel
|
Details
|
|
|
01-17-2018
|
1.00
|
Installed intercom, comms 1&2, AP Panel and Switch
|
Details
|
 |
|
01-16-2018
|
2.00
|
Drilled music input (alternate) hole and TX 1&2 lo
|
Details
|
 |
|
01-15-2018
|
4.00
|
Seat Heat Finally Finished
|
Details
|
  |
|
01-14-2018
|
4.00
|
Seat Heat Cont'd
|
Details
|
 |
|
01-13-2018
|
3.00
|
Seat Heat Cont'd
|
Details
|
|
|
01-12-2018
|
3.50
|
Seat Heat Harness fabrication started
|
Details
|
 |
|
01-11-2018
|
3.00
|
Designed switch labels and placards/overlays
|
Details
|
 |
|
01-10-2018
|
1.50
|
Wiring Diagrams continued
|
Details
|
  |
|
01-09-2018
|
1.00
|
Wiring Diagrams continued
|
Details
|
  |
|
01-08-2018
|
2.00
|
Fuse blocks relabeled, seat heat doc redo, wiring
|
Details
|
|
|
01-07-2018
|
2.50
|
Installed RAMI AV-17 antennas, comm 1&2, ELT test
|
Details
|
 |
|
01-06-2018
|
0.00
|
PTT Notes - Pilot PTT ground COMMON with trim on s
|
Details
|
  |
|
01-06-2018
|
2.00
|
Avionics stack (2 SV Comms and SV Intcom) planning
|
Details
|
  |
|
01-05-2018
|
2.00
|
Tested Trim System, ELT Batteries installed. Prep
|
Details
|
  |
|
01-04-2018
|
7.00
|
Aileron trim spring Install, Safeair FW pass throu
|
Details
|
|
|
01-03-2018
|
3.00
|
Fuel Capacitance Senders wired to EMS.
|
Details
|
 |
|
01-02-2018
|
3.50
|
EMS D-37 All Sensors Terminated. EMS D-25 wires r
|
Details
|
 |
|
01-01-2018
|
5.50
|
EMS Wiring - hook ups to sensors
|
Details
|
  |
|
12-30-2017
|
7.00
|
Auto Pilot/Auto Trim Wiring / EMS 220 Wiring
|
Details
|
|
|
12-29-2017
|
4.00
|
Dynon Skyview HDX is live!
|
Details
|
|
|
12-28-2017
|
2.00
|
SV D-37 EFIS D-subs completed (Serial/GPS/Audio)
|
Details
|
  |
|
12-27-2017
|
2.00
|
Airframe Wiring Testing and SV D-37 Audio Splices
|
Details
|
  |
|
12-16-2017
|
9.00
|
Dynon dual D-37 Serial Wires spliced, GPS bundle s
|
Details
|
|
|
12-12-2017
|
2.00
|
Avionics wiring - ADAHRS and roll/pitch servos
|
Details
|
 |
|
12-11-2017
|
3.00
|
Avionics Wiring - power and grounds
|
Details
|
|
|
12-10-2017
|
5.00
|
Panel - airframe wiring terminated
|
Details
|
  |
|
12-09-2017
|
4.00
|
Panel - airframe wiring terminated
|
Details
|
  |
|
12-08-2017
|
3.00
|
Annunciator Lights - wired
|
Details
|
 |
|
12-07-2017
|
4.00
|
Alternator/Regulator Finished, Flap wiring routed
|
Details
|
|
|
12-06-2017
|
2.00
|
ACS Switch
|
|
|
|
12-05-2017
|
3.00
|
Alternator/Reg wiring, warn light, flap switch wir
|
Details
|
  |
|
12-04-2017
|
3.00
|
Bus power to panel switches
|
Details
|
|
|
12-03-2017
|
2.00
|
Bus wiring completed
|
|
  |
|
11-29-2017
|
2.00
|
Primary/Secondary/Tertiary Bus Diagrams completed
|
Details
|
  |
|
11-28-2017
|
2.00
|
Wiring Diagram - Primary Wiring Diagram Completed
|
Details
|
  |
|
11-25-2017
|
4.00
|
Wire Diagramming/Planning with Tiny Cad
|
Details
|
  |
|
11-19-2017
|
1.00
|
Glareshield padding and LED light strip installed.
|
Details
|
 |
|
11-18-2017
|
1.00
|
Panel installed and mocked up with all EFISs & avi
|
Details
|
|
|
11-16-2017
|
4.00
|
Drilled and installed avionics stack nutplates. F
|
Details
|
|
|
11-15-2017
|
3.00
|
Installed GPS antenna to mount. Fabricated circui
|
Details
|
|
|
11-14-2017
|
2.50
|
Drilled TX 1 & 2 switch. GPS mount fabricated
|
Details
|
  |
|
11-13-2017
|
2.50
|
Finished avionics stack holes
|
Details
|
|
|
11-12-2017
|
7.00
|
Cut EFIS 1, Drilled EFS 1 & EFIS 2 to panel.
|
Details
|
|
|
11-11-2017
|
3.00
|
Cut holes for EFIS2, ELT and USBs
|
Details
|
  |
|
11-10-2017
|
3.00
|
Installed instrument panel and cabin heat cable
|
Details
|
 |
|
11-08-2017
|
2.50
|
Panel - lower mount finished, sanded and clearcoat
|
Details
|
|
|
11-07-2017
|
2.00
|
Panel hole cutting and lower panel mounting
|
Details
|
|
|
11-06-2017
|
2.00
|
Panel layout and hole cutting
|
Details
|
 |
|
11-05-2017
|
2.00
|
Panel - More layout and spot micro w/black dye
|
Details
|
  |
|
11-04-2017
|
3.00
|
Panel Layout and spot micro w/black dye
|
Details
|
  |
|
10-01-2017
|
1.50
|
Cut Hobbs and 12V charger holes, panel dimmer
|
Details
|
|
|
09-30-2017
|
1.00
|
Installed sender manifold
|
Details
|
|
|
09-29-2017
|
0.50
|
Sender manifold spacer fabrication
|
Details
|
  |
|
09-27-2017
|
1.00
|
Installed ELT horn and more panel layout
|
Details
|
  |
|
09-26-2017
|
3.00
|
Panel design and layout
|
|
 |
|
09-25-2017
|
0.50
|
Installed MP Sender
|
Details
|
  |
|
09-24-2017
|
2.00
|
Installed Dynon Batt, Radio, EMS, BNC regulator
|
Details
|
|
|
07-29-2017
|
3.00
|
Mounted Busses 1 & 2 and Dynon Hubs 1 & 2. Began
|
Details
|
|
|
06-19-2017
|
1.00
|
Positioning of canopy on frame. Taped off canopy
|
Details
|
  |
|
06-01-2017
|
2.00
|
Installed copper buss type bars for master/starter
|
Details
|
  |
|
05-19-2017
|
1.00
|
Ammeter Shunt and ANL-60 FW mounts riveted, gear l
|
Details
|
  |
|
05-18-2017
|
2.00
|
Ammeter Shunt and ANL-60 FW mounts fabricated/dril
|
Details
|
  |
|
05-16-2017
|
2.00
|
Sticks insalled and harnesses ran fwd. AFP Fuel P
|
Details
|
|
|
05-15-2017
|
4.00
|
Stick harnesses fabricated
|
Details
|
  |
|
05-14-2017
|
1.00
|
Clecoed FWD bulkhead/panel to measure stick length
|
Details
|
|
|
05-13-2017
|
4.00
|
Wing Wiring to Fuselage (Cont'd)
|
Details
|
|
|
05-11-2017
|
2.00
|
Wing Wiring to Fuselage (Cont'd)
|
Details
|
 |
|
05-10-2017
|
2.00
|
Wing Wiring to Fuselage
|
Details
|
  |
|
05-05-2017
|
2.00
|
Ran all existing wiring forward, installed forest
|
Details
|
 |
|
04-25-2017
|
2.00
|
Drilled AMM Shunt, fabricated FP and Flap harnesse
|
Details
|
  |
|
04-07-2017
|
1.00
|
ELT GPS 4 conductor wire soldered.
|
|
  |
|
04-06-2017
|
3.50
|
Wiring in aft fuselage
|
Details
|
|
|
04-03-2017
|
1.00
|
Transponder, ADSB and Pitch Servo wire harnesses r
|
Details
|
  |
|
04-02-2017
|
6.00
|
Finished ADAHARS Mount.
|
Details
|
|
|
03-30-2017
|
1.00
|
Installed Transponder rack, installed ADSB-IN moun
|
Details
|
  |
|
03-29-2017
|
1.00
|
Ran OAT lines and heat shrunk them. Removed top s
|
Details
|
  |
|
10-12-2015
|
2.00
|
Rescured wiring and pitot/AOA lines near bellcrank
|
|
  |
|
03-27-2015
|
2.00
|
Fiberglassed in Marker Beacon antenna
|
|
 |
|
03-23-2015
|
2.00
|
Marker Beacon Antenna Install - R wing
|
Details
|
 |
|
03-15-2015
|
3.00
|
Fabricated Pitch Trim Harness and D-sub
|
|
  |
|
03-10-2015
|
3.00
|
Finished wing wiring
|
Details
|
|
|
03-09-2015
|
4.00
|
Roll Servo Install, L/R aileron bellcranks install
|
Details
|
|
|
03-07-2015
|
5.00
|
Autopilot Roll/Pitch Servo Harnesses Fabricated
|
Details
|
  |
|
03-04-2015
|
3.00
|
Terminated Land/Taxi, Nav/Stobes/VOR wiring ends
|
|
  |
|
03-03-2015
|
3.00
|
Landing/Taxi Wiring, Nav/Strobe, VOR runs
|
|
  |
|
03-01-2015
|
8.00
|
Installed Pitot Mast, AOA & Pitot Tubing Wiring
|
|
|