KitLog pro

Powered By Kitlog Pro v2.0

Chops' Web Site
Work Logs Found: 61
Category Work Time: 266 Hours
 Date
Hours
Work Log Summary

Details

 01-06-2022
4.00
Joystick doubler
Details
       

 10-31-2021
5.00
Rudder pedals assembly
Details
       

 10-10-2021
4.00
Final fit undercarriage legs
Details
       

 08-29-2021
2.00
Cabin heat cable
Details
     

 08-08-2021
5.00
Brake lines
Details
       

 04-05-2021
5.00
Park brake valve
Details
       

 02-21-2021
7.00
Interior work
Details
       

 01-29-2021
1.00
Pilot seatback assembly
Details
     

 01-27-2021
1.00
Rear seat frame assembly
Details
       

 01-26-2021
2.00
Happy Australia Day (and seat frame assembly)
Details
     

 01-25-2021
9.00
Seats, throttle and various parts priming and pain
Details
       

 01-05-2021
8.00
Undercarriage installation and alignment - AGAIN
Details
       

 12-27-2020
2.00
Tail cone stiffeners
Details

 12-27-2020
3.00
Rear seat throttle part 3
Details
       

 11-21-2020
3.00
Rear seat throttle part 2
Details
       

 10-28-2020
3.00
Start rear throttle installation
Details
     

 10-05-2020
5.00
Seats construction
Details
       

 10-02-2020
4.00
Lower right longeron final rivet
Details
       

 10-02-2020
3.00
Bolt installation lower longerons
Details
       

 09-27-2020
1.00
QB incorrect hardware in lower longerons
Details
     

 03-06-2020
5.00
Right lower longeron change cont.
Details
       

 11-30-2019
5.00
Right lower longeron change cont.
Details
     

 11-10-2019
5.00
Right lower longeron change
Details
       

 02-17-2019
4.00
Avionics tray mod
Details
       

 02-03-2019
2.00
ADAHRS mount fitted
Details
       

 02-01-2019
1.00
Park brake cable
Details
     

 01-28-2019
3.00
Rear turtle deck former fitted
Details
       

 01-18-2019
3.00
Finish turtle deck riveting
Details
       

 01-15-2019
3.00
Park brake fit
Details
       

 01-06-2019
5.00
Turtle deck fitted
Details
       

 01-04-2019
2.00
Dry fit nose locker door
Details
     

 01-03-2019
4.00
Nose locker door
Details
       

 12-27-2018
3.00
Nose locker floor access panel cont.
Details
       

 12-23-2018
3.00
Nose locker floor cutout
Details
       

 12-11-2018
2.00
Assembled avionics rack
Details
       

 11-29-2018
3.00
Flap actuator cover
Details
       

 11-13-2018
3.00
Nose locker parts fabrication
Details
     

 10-27-2018
5.00
First fit of forward skin
Details
       

 08-18-2018
3.00
Instrument panel fit
Details
       

 08-15-2018
3.00
Roll bar installation
Details
       

 07-25-2018
5.00
Turtledeck fitment
Details
       

 05-11-2018
5.00
Gear tower cut-outs Part #2
Details
       

 10-21-2017
3.00
SB 16-12-16 RV-8QB Center Section Bolts
Details
     

 09-18-2017
5.00
Fitting the main gear
Details
       

 05-21-2017
7.00
Horizontal Stabiliser installation
Details
       

 05-01-2017
10.00
Interior paint job
Details
       

 04-30-2017
8.00
Interior painting
Details
       

 03-06-2017
2.00
Gear tower cut-outs Part #1
Details
       

 02-19-2016
0.50
Grove gear legs arrive
Details
       

 01-26-2016
4.00
Pitch servo installation kit
Details
       

 01-19-2016
8.00
Rear seat rudder pedals Part 1
Details
       

 01-12-2016
4.00
Electric aileron trim installation
Details
       

 11-28-2015
10.00
Aircraft flooring
Details
       

 11-23-2015
4.00
Painting day
Details
       

 11-01-2015
4.00
Floor stiffiners
Details
     

 10-14-2015
6.00
Rear lap seatbelt mount correction
Details
       

 10-05-2015
4.00
Flooring
Details
       

 09-23-2015
9.00
Elevator pushrods fabricated
Details
     

 09-21-2015
10.00
Control sticks and torque tube assembly
Details
       

 09-19-2015
12.00
Ground adjustable rudder pedals
Details
       

 03-19-2011
1.00
Dented fuselage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.