KitLog pro

Powered By Kitlog Pro v2.0

Bruce's airplane project
Work Logs Found: 63
Category Work Time: 144 Hours
 Date
Hours
Work Log Summary

Details

 05-10-2008
3.00
Leak checked the fuel tanks
Details
     

 03-30-2008
4.50
Wing bellcrank inspection port
Details
     

 09-29-2007
7.00
Left wing attachment
Details
     

 09-02-2007
6.00
Wing root fairing nutplates added
     

 08-26-2007
4.00
Right fuel tank bracket mounting
Details
       

 08-22-2007
1.50
Right fuel tank vent line formed
     

 08-18-2007
2.00
Right flap pushrod install
Details
       

 07-29-2007
3.00
Set right wing incidence
Details
       

 07-22-2007
5.00
Aligned right wing with fuselage
Details
       

 06-23-2007
4.00
Right wing attached to fuselage
Details
     

 06-09-2007
7.00
Right wing bottom outer panel attached
Details

 05-20-2007
2.50
Autopilot roll servo mounted
Details
       

 05-12-2007
6.00
Left wing bottom skin attached
Details
     

 04-22-2007
1.00
Left wing aileron control bracket torqued
     

 04-07-2007
2.00
Left wing wiring
Details

 05-20-2006
2.00
Landing light installation completed
Details
     

 05-19-2006
2.00
Landing light mount fabricated
       

 05-16-2006
1.00
Landing light work
Details
     

 05-14-2006
1.00
Prepared right wing for landing light installation
Details
     

 05-10-2006
2.50
Fabricated rudder nav/strobe mount
Details
       

 05-07-2006
3.00
WingTip nav light installation
Details
     

 05-04-2006
1.50
Wingtip Lens preparation
Details
       

 05-03-2006
1.00
Wing wiring

 05-02-2006
1.50
Right wingtip work
Details
     

 04-30-2006
2.00
Right wingtip preparation
Details
     

 04-29-2006
3.00
Assembled/tested LED nav lights
Details
     

 04-28-2006
2.00
Left wingtip completed
Details

 04-23-2006
2.50
Wingtip attachment HW added
Details
     

 04-22-2006
1.50
Left wingtip fitting
Details
     

 04-20-2006
0.75
Wingtip attach preparation
Details

 04-19-2006
1.50
Tested strobes, ran pitot line
Details

 04-18-2006
1.00
Prepped inspection plates

 04-17-2006
1.00
Attached inspection port nutplates

 04-16-2006
2.50
Primed wing skins, pitot doubler

 04-13-2006
1.50
Pitot mounting progress
Details
       

 04-12-2006
2.00
Pitot mount fabrication
Details
       

 04-11-2006
2.00
Ran wiring conduit in both wings
Details
       

 04-09-2006
2.00
Dimpled remaining skin of both wings

 04-08-2006
1.50
Drilled wiring conduit passage thru both wings
Details
       

 04-06-2006
1.50
Deburred R/L wing skins

 04-05-2006
2.00
Prepared wing skins
Details
     

 04-04-2006
1.50
Fuel tank pickup/sender mounted
Details
       

 03-29-2006
1.50
Right wing flap mounted

 03-27-2006
1.50
Right wing flap hinge prepared

 03-25-2006
1.50
Right wing aileron mounted

 03-22-2006
1.50
Left wing flap hung
     

 03-19-2006
2.50
Left wing aileron linkage and flap hinge work
       

 03-18-2006
1.50
Left aileron hung
     

 03-09-2006
1.50
Both wings flap braces and aileron fairings rivett
Details

 03-07-2006
1.00
Right wing aileron fairing preparation

 03-06-2006
1.00
Left wing flap brace assembly
Details
     

 03-05-2006
1.50
Flap brace preparation
     

 03-04-2006
2.00
Left wing aileron brackets mounted
Details

 03-02-2006
1.50
Right wing aileron brackets mounted
       

 02-27-2006
1.50
Aileron hinge brackets assembled
Details
     

 02-26-2006
1.50
Primed aileron brackets, control rods

 02-25-2006
1.00
Aileron mounting bracket preparation

 02-23-2006
1.00
Right bellcrank mounted
     

 02-22-2006
1.50
Aileron control rod fabrication
     

 02-19-2006
4.00
Aileron control rod fabrication
Details
     

 02-18-2006
2.50
QB kit inventory
Details

 01-08-2006
3.00
Wing Stand Construction
Details
     

 01-07-2006
4.00
Wing Stand Construction










Copyright © 2001-2024 Matronics. All Rights Reserved.