Date
|
Hours
|
Work Log Summary
|
Details
|
02-12-2019
|
1.50
|
Mounted fire extinguisher
|
Details
|
|
|
02-01-2019
|
1.25
|
Finished carpet install
|
Details
|
|
|
01-27-2019
|
3.00
|
Carpet adhesive, Reinforce tunnel
|
Details
|
|
|
01-26-2019
|
4.00
|
Carpet work
|
Details
|
|
|
01-22-2019
|
6.00
|
More carpet work.
|
Details
|
|
|
01-17-2019
|
4.00
|
Initial cut and fit of baggage back carpet
|
Details
|
|
|
01-05-2019
|
1.50
|
Console edge moulding
|
Details
|
|
|
01-02-2019
|
1.75
|
Riveted baggage floor
|
Details
|
|
|
12-31-2018
|
2.75
|
Baggage area prep
|
Details
|
|
|
12-25-2018
|
2.75
|
Finish install of side panels, mike jacks, seat pa
|
Details
|
|
|
12-18-2018
|
1.25
|
Placarding and glareshield trim
|
Details
|
|
|
12-13-2018
|
1.75
|
Side upholstery work
|
Details
|
|
|
12-12-2018
|
0.75
|
Side upholstery work
|
Details
|
|
|
11-17-2018
|
5.00
|
Finished header tank access panels
|
Details
|
|
|
11-16-2018
|
2.25
|
Started work on header tank access coverings
|
Details
|
|
|
11-03-2018
|
1.50
|
Baggage area riveting
|
Details
|
|
|
10-27-2018
|
2.00
|
Finished baggage floor inspection panel work
|
Details
|
|
|
10-26-2018
|
3.50
|
Work on baggage floor nutplates
|
Details
|
|
|
10-21-2018
|
3.25
|
Starting work on baggage floor inspection panels
|
Details
|
|
|
10-05-2018
|
4.75
|
Tunnel attachment and upholstery
|
Details
|
|
|
10-03-2018
|
2.00
|
Installed deat belts
|
Details
|
|
|
10-01-2018
|
2.00
|
Installed seat bottom snaps
|
Details
|
|
|
08-27-2018
|
1.75
|
Redoing center console fabric adhesive
|
Details
|
|
|
08-03-2017
|
3.00
|
Finished folding console
|
Details
|
|
|
08-02-2017
|
5.50
|
Started folding console
|
Details
|
|
|
07-25-2017
|
0.50
|
Rivet door jamb gusset missed earlier
|
Details
|
|
|
07-25-2017
|
1.00
|
Deburring session
|
Details
|
|
|
07-06-2017
|
1.25
|
Map box
|
Details
|
|
|
07-05-2017
|
7.50
|
Center Console
|
Details
|
|
|
06-30-2017
|
1.25
|
Seat test
|
Details
|
|
|
05-27-2017
|
2.00
|
Treated and installed gusset and doublers
|
Details
|
|
|
05-25-2017
|
7.25
|
Starting to fix gusset error
|
Details
|
|
|
05-24-2017
|
2.25
|
Attached seat back brackets to seat pans
|
Details
|
|
|
05-11-2017
|
0.50
|
Riveted seat belt bracket
|
Details
|
|
|
05-06-2017
|
2.00
|
Control Stick, Seat belt brackets
|
Details
|
|
|
05-03-2017
|
1.50
|
Pilot seat pan
|
Details
|
|
|
05-01-2017
|
13.25
|
Pilot side sliding seat and rivet
|
Details
|
|
|
04-28-2017
|
5.00
|
Pass side sliding seat work
|
Details
|
|
|
04-27-2017
|
3.75
|
Finished prep of torque tube bearing assy, Positio
|
Details
|
|
|
04-21-2017
|
3.00
|
Torque tube bearing work
|
Details
|
|
|
04-20-2017
|
3.30
|
Riveted seat support angles, Started torque tube b
|
Details
|
|
|
04-19-2017
|
1.50
|
Passthrough holes in rear seat support angles
|
Details
|
|
|
04-06-2017
|
1.50
|
Reinstalled pedal assembly
|
Details
|
|
|
04-05-2017
|
4.75
|
Finished mounting weldements
|
Details
|
|
|
04-02-2017
|
3.75
|
Weldement mounting
|
Details
|
|
|
04-01-2017
|
1.75
|
Finished cabin joining riveting
|
Details
|
|
|
03-27-2017
|
1.00
|
Riveted rear SSO support
|
Details
|
|
|
03-27-2017
|
2.25
|
Fuselage Joining
|
Details
|
|
|
03-24-2017
|
5.50
|
Cabin SSO reassembly
|
Details
|
|
|
03-23-2017
|
3.00
|
SSO Supports
|
Details
|
|
|
03-18-2017
|
5.00
|
Drill Longerons, Brake pedals
|
Details
|
|
|
03-17-2017
|
3.75
|
Finished debur/corrosion protect, heel gussets
|
Details
|
|
|
03-16-2017
|
2.00
|
Reassembly and riveting continues
|
Details
|
|
|
03-15-2017
|
2.00
|
reassembly of cabin continues
|
Details
|
|
|
03-14-2017
|
2.25
|
Getting more cabin reassembled
|
Details
|
|
|
03-13-2017
|
4.00
|
Still more debur and reassemble
|
Details
|
|
|
03-08-2017
|
1.25
|
Little bit more debur work
|
|
|
|
03-05-2017
|
3.00
|
Continue Debur/Cortec/Reassemble
|
Details
|
|
|
03-04-2017
|
7.25
|
Front side skins, upsize holes, start debur
|
Details
|
|
|
03-03-2017
|
1.75
|
Seat base/angle drilling. Drilled baggage floor t
|
Details
|
|
|
03-02-2017
|
1.50
|
Seat bottom angle/seat base
|
Details
|
|
|
02-26-2017
|
6.00
|
Gear weldement, Gear channel doublers
|
Details
|
|
|
02-25-2017
|
5.00
|
Drilling gear weldements
|
Details
|
|
|
02-23-2017
|
1.75
|
Cabin frame gussets
|
Details
|
|
|
02-22-2017
|
1.00
|
Finished drilling cabin frame
|
Details
|
|
|
02-21-2017
|
1.50
|
Finished cabin frame trimming and test fit.
|
Details
|
|
|
02-20-2017
|
1.25
|
Started trimming cabin frame
|
Details
|
|
|
02-18-2017
|
4.50
|
Seat bases
|
Details
|
|
|
02-12-2017
|
4.50
|
Forward fuselage to rear fitting
|
Details
|
|
|
02-05-2017
|
0.00
|
Cabin floor, fuselage continued
|
Details
|
|
|
02-05-2017
|
3.75
|
Cabin floor, cabin sides
|
Details
|
|
|
02-04-2017
|
5.50
|
Drilled longerons, cleco'd armrest sides, drilled
|
Details
|
|
|
02-01-2017
|
1.00
|
Trimmed other longeron, began clecoing cabin floor
|
Details
|
|
|
01-30-2017
|
1.00
|
Trim forward longeron
|
Details
|
|