Date
|
Hours
|
Work Log Summary
|
Details
|
02-11-2017
|
6.00
|
sub panel, storage bin and Smoke system work
|
Details
|
|
|
02-10-2017
|
6.00
|
Sub panel, and smoke tank work
|
Details
|
|
|
02-06-2017
|
1.50
|
wire management in tail cone
|
Details
|
|
|
02-03-2017
|
2.00
|
install of fuel lines
|
|
|
|
02-02-2017
|
1.00
|
installed bus manager and fule pumps
|
|
|
|
01-29-2017
|
4.00
|
paint cleanup, repaint of some parts
|
Details
|
|
|
01-28-2017
|
7.00
|
paint prep and paint
|
Details
|
|
|
01-27-2017
|
5.00
|
|
Details
|
|
|
01-13-2017
|
4.00
|
Wrap up of rear throttle and start of electric ale
|
Details
|
|
|
01-11-2017
|
1.50
|
HVAC work
|
Details
|
|
|
01-09-2017
|
0.50
|
Installed Naca Vent
|
Details
|
|
|
01-06-2017
|
6.00
|
Rear Seat Throttle
|
Details
|
|
|
01-02-2017
|
2.00
|
Installed U805-1/flap postion sensor
|
Details
|
|
|
12-28-2016
|
2.00
|
Firewall heat box
|
Details
|
|
|
12-27-2016
|
2.00
|
Firewall heat box
|
Details
|
|
|
12-26-2016
|
2.50
|
Installed push pull for heat, air, and alt air
|
Details
|
|
|
12-23-2016
|
7.00
|
Misc fuselage work
|
Details
|
|
|
12-22-2016
|
0.50
|
Installing nut plates on F880B
|
Details
|
|
|
11-24-2016
|
2.50
|
Fit and install of flap position sensor
|
Details
|
|
|
11-20-2016
|
2.50
|
Firewall penetrations starter selenoid install
|
Details
|
|
|
11-19-2016
|
3.00
|
Throttle and Prop pitch firewall penetration insta
|
Details
|
|
|
11-16-2016
|
2.50
|
Battery bay door
|
Details
|
|
|
11-14-2016
|
2.50
|
Bus manager bracket, top 8 rivets on F-817
|
Details
|
|
|
11-14-2016
|
2.00
|
battery bay door
|
Details
|
|
|
11-13-2016
|
0.50
|
Riveting sides of the F 850
|
Details
|
|
|
11-11-2016
|
4.50
|
Forward bottom skins and misc
|
Details
|
|
|
11-07-2016
|
0.50
|
misc fuse work in prep for turtle deck riveting
|
Details
|
|
|
11-06-2016
|
1.00
|
interior parts painting
|
Details
|
|
|
11-04-2016
|
1.50
|
more painting of interior parts
|
Details
|
|
|
11-03-2016
|
2.00
|
Passenger footwell rivetting & other misc
|
Details
|
|
|
11-02-2016
|
1.00
|
misc fuse work
|
Details
|
|
|
11-01-2016
|
2.00
|
Non attatched Interior cockpit painting
|
Details
|
|
|
10-31-2016
|
1.50
|
Floor riveting
|
Details
|
|
|
10-28-2016
|
2.50
|
Interior paint
|
Details
|
|
|
10-27-2016
|
1.00
|
misc fuse work
|
Details
|
|
|
10-26-2016
|
1.50
|
Misc interior parts painting
|
Details
|
|
|
10-26-2016
|
1.00
|
Create F864E Throttle cable bracket
|
Details
|
|
|
10-25-2016
|
1.50
|
Comm and ADSB/Trans antenna routing
|
Details
|
|
|
10-24-2016
|
2.50
|
painted fwd foot well of the interior
|
Details
|
|
|
10-21-2016
|
1.00
|
Exhaust Ramp
|
Details
|
|
|
10-20-2016
|
0.75
|
Exhuast ramp fitting
|
Details
|
|
|
10-19-2016
|
1.00
|
Made and riveted exhaust ramp stiffener
|
Details
|
|
|
10-18-2016
|
1.50
|
SS Exhaust ramp cut and rough form
|
Details
|
|
|
10-17-2016
|
1.00
|
Left side firewall penetration
|
Details
|
|
|
09-30-2016
|
1.50
|
Battery Box
|
Details
|
|
|
09-29-2016
|
1.00
|
Trim firewall penetraion for left side
|
Details
|
|
|
09-06-2016
|
1.00
|
Lower motor mount drilling and fuel return line
|
Details
|
|
|
09-02-2016
|
0.50
|
upper motor mount hole drilling
|
Details
|
|
|
09-01-2016
|
1.00
|
Motor Mount fitting
|
Details
|
|
|
08-31-2016
|
4.00
|
Primer cleanup
|
Details
|
|
|
08-11-2016
|
1.50
|
Parts prep and fuel system work
|
Details
|
|
|
08-10-2016
|
1.25
|
fwd top skin tear down and prep
|
Details
|
|
|
08-09-2016
|
1.50
|
Bagage door primer prep, fwd top skin removal
|
Details
|
|
|
08-08-2016
|
1.50
|
Baggage door fab
|
Details
|
|
|
08-03-2016
|
1.00
|
Fuel system parts order
|
Details
|
|
|
07-11-2016
|
1.00
|
F821afb fitting and drilling
|
|
|
|
07-10-2016
|
0.50
|
F-821AFB fitting
|
|
|
|
07-08-2016
|
1.25
|
Forward top skin cut for Fastback
|
|
|
|
07-06-2016
|
2.00
|
Fuel valve work, cockpit rail riveting, top skin f
|
Details
|
|
|
07-05-2016
|
1.50
|
Andair fuel valve bracket
|
Details
|
|
|
06-20-2016
|
1.00
|
Antenna Doubler prep
|
Details
|
|
|
06-20-2016
|
1.50
|
Antenna Doubler install/misc
|
Details
|
|
|
06-08-2016
|
1.50
|
Auto pilot pitch servo bracket - GSA 28
|
Details
|
|
|
05-26-2016
|
1.00
|
Forward floor and rear foot wells/floor dimpling
|
Details
|
|
|
04-22-2016
|
3.00
|
initial landing gear aligment
|
Details
|
|
|
04-03-2016
|
5.00
|
Parts priming
|
Details
|
|
|
04-02-2016
|
1.50
|
primer prep
|
Details
|
|
|
02-25-2016
|
7.00
|
Fuse parts prep
|
Details
|
|
|
02-16-2016
|
2.00
|
fitted and drilled rear bulkheads
|
Details
|
|
|
02-16-2016
|
3.50
|
Finished driling the skins
|
|
|
|
02-13-2016
|
1.50
|
Fuselage driling
|
Details
|
|
|
02-12-2016
|
1.50
|
Drilling forward skins
|
Details
|
|
|
02-12-2016
|
4.00
|
Drilled fuse skins
|
Details
|
|
|
02-11-2016
|
2.00
|
Fuselage drilling
|
Details
|
|
|
02-02-2016
|
3.00
|
Fitted fastback turtle deck and bulkheads
|
Details
|
|
|
01-16-2016
|
1.50
|
tail cone work
|
Details
|
|
|
12-10-2015
|
1.00
|
Mid fusleage drilling
|
Details
|
|
|
12-09-2015
|
1.00
|
FWD fuselage drilling part 2
|
Details
|
|
|
12-08-2015
|
3.00
|
Forward fuselage drilling
|
Details
|
|
|
12-07-2015
|
1.50
|
Weldment/bulkhead work
|
Details
|
|
|
12-07-2015
|
1.00
|
Longeron tweaking
|
Details
|
|
|
12-04-2015
|
0.50
|
Longeron fitting
|
Details
|
|
|
12-03-2015
|
1.50
|
prep for aft fuse/tailcone assembly
|
Details
|
|
|
12-03-2015
|
3.00
|
Adding Tailcone to FWD fuse
|
Details
|
|
|
12-01-2015
|
1.50
|
Primer of prepped parts
|
Details
|
|
|
12-01-2015
|
2.00
|
aft fuselage pats prep
|
Details
|
|
|
11-30-2015
|
2.50
|
Tail cone bulkhead prep and drill
|
Details
|
|
|
11-30-2015
|
1.50
|
Front seat drill
|
Details
|
|
|
11-26-2015
|
0.50
|
Tail Cone bulkheads Part2
|
Details
|
|
|
11-25-2015
|
1.50
|
Tail cone bulk heads part 1
|
Details
|
|
|
11-24-2015
|
1.50
|
Drilling mid fuse parts
|
Details
|
|
|
11-23-2015
|
2.00
|
Mid Fuselage skins and sructure
|
Details
|
|
|
11-21-2015
|
1.00
|
Fwd Fuse work
|
Details
|
|
|
11-16-2015
|
1.50
|
Drilling lower longerons
|
Details
|
|
|
11-12-2015
|
2.00
|
Bending of upper longerons
|
Details
|
|
|
10-28-2015
|
2.00
|
front seat
|
Details
|
|
|
08-15-2015
|
0.00
|
Work stoppage for summer
|
Details
|
|
|
08-14-2015
|
0.75
|
riveting of bottom skin to seat ribs
|
Details
|
|
|
08-13-2015
|
0.50
|
started riveting of bottom skin to sesat ribs
|
Details
|
|
|
08-12-2015
|
0.50
|
aileron trim bracket install
|
Details
|
|
|
08-10-2015
|
1.00
|
electric aileron trim bracket prep and install
|
Details
|
|
|
07-16-2015
|
2.00
|
center section assembly
|
Details
|
|
|
07-14-2015
|
2.00
|
created wood spacer
|
Details
|
|
|
07-12-2015
|
1.00
|
center section assembly part 1
|
Details
|
|
|
07-11-2015
|
2.50
|
Forward section assembly
|
|
|
|
07-10-2015
|
2.00
|
Primering
|
Details
|
|
|
07-09-2015
|
1.50
|
primer prep
|
Details
|
|
|
07-08-2015
|
2.50
|
Longeron Bending part 1
|
Details
|
|
|
07-06-2015
|
1.00
|
Seat rib substructure dimple
|
Details
|
|
|
07-04-2015
|
3.00
|
Seat rib assembly final drill and dimple
|
Details
|
|
|
07-02-2015
|
1.00
|
seat rib assembly
|
Details
|
|
|
07-01-2015
|
1.50
|
Seat ribn assembly
|
Details
|
|
|
06-30-2015
|
1.00
|
Pulled the parts for the seat rib assembly
|
Details
|
|
|
06-29-2015
|
2.50
|
Center section parts
|
Details
|
|
|
06-24-2015
|
1.50
|
Forward fuselage baggage bulk heads
|
Details
|
|
|
06-23-2015
|
1.50
|
Riveting of gear towers to forward fuselage skin
|
Details
|
|
|
06-22-2015
|
2.00
|
Gear tower weldment riveting
|
Details
|
|
|
06-19-2015
|
1.50
|
Torqueing of bolts on gear tower weldments
|
Details
|
|
|
06-18-2015
|
2.00
|
weldment material removal
|
Details
|
|
|
06-15-2015
|
1.50
|
Gear towere weldment install
|
Details
|
|
|
06-13-2015
|
3.00
|
Forward lower skin riveting.
|
Details
|
|
|
06-12-2015
|
2.50
|
gear tower riveting
|
Details
|
|
|
06-11-2015
|
1.50
|
Final rivetring of the firewall
|
Details
|
|
|
06-10-2015
|
1.00
|
Riveting of firewall
|
Details
|
|
|
06-09-2015
|
1.50
|
Primered parts for firewall, foreward lower sectio
|
Details
|
|
|
06-09-2015
|
1.00
|
Parts prep for priming
|
Details
|
|
|
06-08-2015
|
1.00
|
Gear tower mod access covers
|
Details
|
|
|
06-06-2015
|
1.50
|
Gear Tower Mod
|
Details
|
|
|
06-06-2015
|
1.00
|
Drilled gear tower for nutplates
|
Details
|
|
|
06-04-2015
|
3.00
|
Drilled gear towers and other prep work
|
Details
|
|
|
06-03-2015
|
0.50
|
clecod right gear tower together
|
Details
|
|
|
06-02-2015
|
1.50
|
Foreward Fuselage floor.
|
Details
|
|
|
05-23-2015
|
2.00
|
Firewall prep
|
Details
|
|
|
05-22-2015
|
0.50
|
Debured the firewall
|
Details
|
|
|
05-21-2015
|
1.50
|
Drilled firewall and brackets
|
Details
|
|
|
04-19-2015
|
2.00
|
Parts organization
|
Details
|
|
|
04-18-2015
|
2.00
|
Inventory
|
Details
|
|
|
04-18-2015
|
2.00
|
From the crate to the shop
|
Details
|
|
|
04-16-2015
|
1.50
|
Fuselage Arrives!
|
Details
|
|