Date
|
Hours
|
Work Log Summary
|
Details
|
03-23-2006
|
2.00
|
Built CS102/136 Assy
|
Details
|
|
|
03-22-2006
|
2.00
|
Nose Wheel Window outer glass, install cover
|
|
|
|
03-21-2006
|
0.75
|
Cleaned Glass Windows prepped for glassing
|
|
|
|
03-15-2006
|
1.00
|
Installed Node Wheel Cover Windows
|
|
|
|
03-09-2006
|
1.00
|
Trimmed and cleaned nose wheel cover
|
|
|
|
03-07-2006
|
0.50
|
Removed Plug from cover
|
|
|
|
03-06-2006
|
2.00
|
Completed Nose Plug and glassed
|
|
|
|
03-05-2006
|
2.00
|
Start plug for nose wheel cover
|
Details
|
|
|
03-04-2006
|
2.00
|
Reinstall NG3
|
Details
|
|
|
02-26-2006
|
2.00
|
Tape Canard Brace
|
Details
|
|
|
02-25-2006
|
2.00
|
Install Canard Brace
|
Details
|
|
|
02-24-2006
|
1.00
|
Layup Canard Brace/Trim Nose Doors
|
Details
|
|
|
02-23-2006
|
3.50
|
Nose Gear Door Stuff/Canard Brace
|
Details
|
|
|
02-22-2006
|
3.00
|
Trim and Size Gear Doors
|
Details
|
|
|
02-21-2006
|
3.00
|
Work on Nose Gear Doors
|
Details
|
|
|
02-19-2006
|
4.00
|
Glass the nose bottom
|
Details
|
|
|
02-18-2006
|
2.50
|
Nose Bottom/Strut Prep
|
Details
|
|
|
02-17-2006
|
3.50
|
Reinstall Strut Cover, strut prep
|
Details
|
|
|
02-16-2006
|
3.00
|
Install Noselift / Cut remaining hole for nose whe
|
Details
|
|
|
02-15-2006
|
3.00
|
Fit/Install Strut Cover
|
Details
|
|
|
02-08-2006
|
1.00
|
Routed nose for support wood
|
Details
|
|
|
02-03-2006
|
1.50
|
Cut Wooden Block, Sanded Nose Foam
|
Details
|
|
|
01-31-2006
|
2.50
|
Completed NG-3, NG5
|
Details
|
|
|
01-30-2006
|
1.00
|
Installed Foot and NG-3
|
Details
|
|
|
01-29-2006
|
2.00
|
Trimed Strut, MKNG6A, Nose Cone
|
Details
|
|
|
01-28-2006
|
2.50
|
2cd Ply and Nose Buildup
|
Details
|
|
|
01-27-2006
|
1.00
|
1st Ply on Nose Strut
|
Details
|
|
|
01-26-2006
|
0.50
|
Prep Strut
|
Details
|
|
|
01-24-2006
|
1.00
|
Trim Strut/Recover MKNG6A / NG15
|
Details
|
|
|
01-22-2006
|
3.00
|
Contour Nose
|
Details
|
|
|
01-21-2006
|
2.25
|
Complete Side Sanding Templates...
|
Details
|
|
|
01-20-2006
|
1.25
|
Continued prep for contouring
|
Details
|
|
|
01-19-2006
|
3.00
|
Contour Nose, Bore Lift Tab Mounts
|
Details
|
|
|
01-17-2006
|
1.00
|
Nose Templates
|
Details
|
|
|
09-24-2005
|
0.50
|
Continue Carving Nose
|
|
|
|
09-23-2005
|
2.00
|
Start Carving Nose
|
Details
|
|
|
09-20-2005
|
0.50
|
Install Horizontal Nose piece
|
Details
|
|
|
09-19-2005
|
1.00
|
Glass F0
|
Details
|
|
|
09-17-2005
|
3.00
|
Trim sides, install NG
|
Details
|
|
|
09-16-2005
|
4.00
|
Install sides
|
Details
|
|
|
09-15-2005
|
3.00
|
Contour inside of nose foam
|
Details
|
|
|
09-10-2005
|
8.00
|
Carved Bottom, install nose bottom...
|
Details
|
|
|
08-08-2005
|
0.50
|
Install Front Assy
|
Details
|
|
|
08-07-2005
|
0.50
|
Install Jig For Front Assy
|
Details
|
|
|
08-06-2005
|
1.50
|
Trim Hole For Actuator
|
Details
|
|
|
02-13-2005
|
0.50
|
final Drill and Sand of NG-30's
|
Details
|
|
|
02-11-2005
|
2.00
|
Route NG-30 Reinforcements, Glass
|
Details
|
|
|
02-10-2005
|
2.00
|
Glass Outside of NG-30 4 Ply
|
Details
|
|
|
02-09-2005
|
0.50
|
Prep NG30 and install plywood HP
|
Details
|
|
|
02-08-2005
|
0.50
|
Install Glass Hardpoints
|
Details
|
|
|
02-04-2005
|
1.00
|
15 Ply Glass Layups for Hard Points
|
Details
|
|
|
02-01-2005
|
1.50
|
Cut aluminum for CH13
|
Details
|
|
|
01-30-2005
|
2.00
|
Layup Inside NG-30s
|
Details
|
|
|
01-28-2005
|
1.00
|
Glass NG31 and 32
|
Details
|
|
|
01-27-2005
|
1.00
|
Cut plywood hardpoints for 13
|
Details
|
|
|
01-26-2005
|
0.50
|
Cut foam for NG-31
|
|
|
|
01-24-2005
|
1.00
|
Cut foam for NG-30
|
Details
|
|