Details

 07-10-2016
2.00
RTV'd the bafle/engine areas.

 02-26-2016
2.00
Enlarged the VA-132C filter retainiing bracket hol

 02-21-2016
1.00
Completed the bckup ring for the alternate air doo

 02-19-2016
2.00
Secured the fwd left baffles with safety wire.
Details

 02-16-2016
2.00
Secured lower left baffles with safety wire. Atta

 02-10-2016
2.00
Began finalizing the baffle material, fit the righ

 01-31-2016
4.00
Trimmed baffles, cowling ramps, redid a few baffle

 01-27-2016
2.00
Secured all baffle material. Riveted some baffles
Details

 01-13-2016
1.00
Continued installing material.

 01-12-2016
1.00
Continued installing material. Need more material

 01-11-2016
2.00
Continued installing material.

 01-09-2016
4.00
Cut baffle material and installed RT side for fit/
Details

 01-08-2016
7.00
Assembled baffles, found a drawing error, called V
Details

 01-07-2016
3.00
Completed riveting baffles and began installation.

 01-06-2016
2.00
Continued baffle riveting.

 01-05-2016
3.00
Installed more nutplates and began riveting baffle

 01-04-2016
1.00
Installed more nutplates on the baffles.

 01-02-2016
1.00
Paint 50% complete. Some required more paint.
Details

 12-31-2015
5.00
Completed all bracket fab for the baffles. All dr
Details

 12-30-2015
4.00
Began painting baffle parts - failed to look good.
Details

 12-29-2015
4.00
Continued to make baffle material patterns.

 12-28-2015
7.00
Cut baffle access holes for oil cooler duct and ig
Details

 12-16-2015
1.00
Laid out baffle hole patterns for material

 12-15-2015
2.00
Installed aft support bracket, fabed baffle materi

 12-14-2015
3.00
Used clay method to determine baffle cowl interfer
Details

 12-10-2015
1.00
More trimming and fitting.

 12-09-2015
5.00
Much more trimming and fitting of the baffle to co
Details

 12-08-2015
6.00
Fabed more angles, tabs, supports, etc. drilled/d
Details

 12-05-2015
1.00
Reinstalled LT floor parts for forward wall and fa

 12-04-2015
3.00
More drilling and dimpling. Prepped for painting.

 12-03-2015
3.00
Filter supports drilled, deburred, dimpled, etc.

 12-02-2015
1.00
Adjusted/trimmed filter support brackets to the sn

 11-30-2015
3.00
Enlarged the air intake in the LT floor. Fit the s

 11-19-2015
2.00
Reworked snorkel again. cutout areas around alter
Details

 11-14-2015
1.00
Glassed the snorkel cutouts made for clearance.

 11-14-2015
3.00
Began alternate air door installation. Glassed ho

 11-13-2015
1.00
Trimmed the snorkel servo attach area.

 11-10-2015
2.00
More snorkel work and cut the air filter opening,

 10-31-2015
3.00
Drilled and fitted back baffles and brackets.
Details

 10-26-2015
3.00
Fabed more brackets, matched drilled. Fabed new c

 10-24-2015
1.00
Fabed 2 new brackets for front RT ramp.

 10-21-2015
2.00
Continued front ramp installation.

 10-20-2015
3.00
Completed front baffle initial fitting.

 10-19-2015
4.00
Continued front baffle fitting.

 10-14-2015
4.00
Continued front baffle fitting.

 10-02-2015
1.00
Continued front baffle fitting.

 10-01-2015
1.00
Continued front baffle fitting.

 09-30-2015
1.00
Began fitting. front baffles

 09-29-2015
4.00
Removed the prop. Began fitting front baffle ramp

 09-28-2015
2.00
Sanded lower cowl. Began engine baffle installati