Date
|
Hours
|
Work Log Summary
|
Details
|
07-10-2016
|
2.00
|
RTV'd the bafle/engine areas.
|
|
|
|
02-26-2016
|
2.00
|
Enlarged the VA-132C filter retainiing bracket hol
|
|
|
|
02-21-2016
|
1.00
|
Completed the bckup ring for the alternate air doo
|
|
|
|
02-19-2016
|
2.00
|
Secured the fwd left baffles with safety wire.
|
Details
|
|
|
02-16-2016
|
2.00
|
Secured lower left baffles with safety wire. Atta
|
|
|
|
02-10-2016
|
2.00
|
Began finalizing the baffle material, fit the righ
|
|
|
|
01-31-2016
|
4.00
|
Trimmed baffles, cowling ramps, redid a few baffle
|
|
|
|
01-27-2016
|
2.00
|
Secured all baffle material. Riveted some baffles
|
Details
|
|
|
01-13-2016
|
1.00
|
Continued installing material.
|
|
|
|
01-12-2016
|
1.00
|
Continued installing material. Need more material
|
|
|
|
01-11-2016
|
2.00
|
Continued installing material.
|
|
|
|
01-09-2016
|
4.00
|
Cut baffle material and installed RT side for fit/
|
Details
|
|
|
01-08-2016
|
7.00
|
Assembled baffles, found a drawing error, called V
|
Details
|
|
|
01-07-2016
|
3.00
|
Completed riveting baffles and began installation.
|
|
|
|
01-06-2016
|
2.00
|
Continued baffle riveting.
|
|
|
|
01-05-2016
|
3.00
|
Installed more nutplates and began riveting baffle
|
|
|
|
01-04-2016
|
1.00
|
Installed more nutplates on the baffles.
|
|
|
|
01-02-2016
|
1.00
|
Paint 50% complete. Some required more paint.
|
Details
|
|
|
12-31-2015
|
5.00
|
Completed all bracket fab for the baffles. All dr
|
Details
|
|
|
12-30-2015
|
4.00
|
Began painting baffle parts - failed to look good.
|
Details
|
|
|
12-29-2015
|
4.00
|
Continued to make baffle material patterns.
|
|
|
|
12-28-2015
|
7.00
|
Cut baffle access holes for oil cooler duct and ig
|
Details
|
|
|
12-16-2015
|
1.00
|
Laid out baffle hole patterns for material
|
|
|
|
12-15-2015
|
2.00
|
Installed aft support bracket, fabed baffle materi
|
|
|
|
12-14-2015
|
3.00
|
Used clay method to determine baffle cowl interfer
|
Details
|
|
|
12-10-2015
|
1.00
|
More trimming and fitting.
|
|
|
|
12-09-2015
|
5.00
|
Much more trimming and fitting of the baffle to co
|
Details
|
|
|
12-08-2015
|
6.00
|
Fabed more angles, tabs, supports, etc. drilled/d
|
Details
|
|
|
12-05-2015
|
1.00
|
Reinstalled LT floor parts for forward wall and fa
|
|
|
|
12-04-2015
|
3.00
|
More drilling and dimpling. Prepped for painting.
|
|
|
|
12-03-2015
|
3.00
|
Filter supports drilled, deburred, dimpled, etc.
|
|
|
|
12-02-2015
|
1.00
|
Adjusted/trimmed filter support brackets to the sn
|
|
|
|
11-30-2015
|
3.00
|
Enlarged the air intake in the LT floor. Fit the s
|
|
|
|
11-19-2015
|
2.00
|
Reworked snorkel again. cutout areas around alter
|
Details
|
|
|
11-14-2015
|
1.00
|
Glassed the snorkel cutouts made for clearance.
|
|
|
|
11-14-2015
|
3.00
|
Began alternate air door installation. Glassed ho
|
|
|
|
11-13-2015
|
1.00
|
Trimmed the snorkel servo attach area.
|
|
|
|
11-10-2015
|
2.00
|
More snorkel work and cut the air filter opening,
|
|
|
|
10-31-2015
|
3.00
|
Drilled and fitted back baffles and brackets.
|
Details
|
|
|
10-26-2015
|
3.00
|
Fabed more brackets, matched drilled. Fabed new c
|
|
|
|
10-24-2015
|
1.00
|
Fabed 2 new brackets for front RT ramp.
|
|
|
|
10-21-2015
|
2.00
|
Continued front ramp installation.
|
|
|
|
10-20-2015
|
3.00
|
Completed front baffle initial fitting.
|
|
|
|
10-19-2015
|
4.00
|
Continued front baffle fitting.
|
|
|
|
10-14-2015
|
4.00
|
Continued front baffle fitting.
|
|
|
|
10-02-2015
|
1.00
|
Continued front baffle fitting.
|
|
|
|
10-01-2015
|
1.00
|
Continued front baffle fitting.
|
|
|
|
09-30-2015
|
1.00
|
Began fitting. front baffles
|
|
|
|
09-29-2015
|
4.00
|
Removed the prop. Began fitting front baffle ramp
|
|
|
|
09-28-2015
|
2.00
|
Sanded lower cowl. Began engine baffle installati
|
|
|