Powered By Kitlog Pro v2.0
WAYNE'S WEB SITE
RV-8
Empennage
Work Logs Found:
15
Category Work Time:
44 Hours
Date
Hours
Work Log Summary
Details
01-14-2019
2.00
test fit elevators. Trimmed HS
Details
01-10-2019
2.00
Made rod end bearing installation and measurement
Details
01-02-2019
2.00
Match drilled, dimpled riveted riight elevatop tip
Details
01-02-2019
2.00
Fit,match drilled,dimpled riveted left elevator ti
Details
01-01-2019
3.00
riveted ruder tip.Trimed right elevator tip
Details
12-31-2018
1.00
Added rivet washers to rudder tip
Details
12-27-2018
2.00
Fit Rudder Cap
Details
12-23-2018
1.00
installed rudder counterbalance weight
Details
12-22-2018
3.00
finished trim tab
Details
12-21-2018
7.00
rolled leading edge of left elevator and rudder
Details
12-12-2018
4.00
Built trim tab
Details
12-10-2018
4.00
set rivets on top hing of elevator trim tab
Details
12-09-2018
3.00
left elevator control horn
Details
03-01-2017
3.00
Riveted right elevator frame together
Details
01-10-2017
5.00
Inventory
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
123
423
Elevators
25
73
Empennage
15
44
Fiberglass/Composite
5
11
Horizontal Stabiler
22
60
Intro
1
1
Rudder
11
44
Shop Tools
4
17
Vertical Stabilizer
9
38
Wings
31
135
RV-8 Home
Copyright © 2001-2025 Matronics. All Rights Reserved.