KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 50
Category Work Time: 122 Hours
 Date
Hours
Work Log Summary

Details

 12-20-2017
1.50
Install powder coated rollbar
       

 12-13-2017
1.50
Stiffner side wall attach
     

 12-10-2017
4.00
Finish roll bar,
Details
       

 12-02-2017
3.50
Roll Bar
       

 11-29-2017
1.50
Start Roll Bar
       

 11-26-2017
3.50
Finish and install control sticks
Details
       

 11-18-2017
3.00
Bell crank assembly, drill control sticks
       

 11-15-2017
2.50
Elevator pushrod assembly
       

 11-11-2017
1.50
Install flap actuator motor, prep air vents
       

 11-04-2017
3.00
Flap torque arm install, correct rudder pedals
       

 11-02-2017
2.00
Route install rudder cables
       

 10-22-2017
4.50
Install brake lines
       

 10-14-2017
3.00
Attach brake pedal assemblies
       

 10-07-2017
1.00
Prime and paint firewall
       

 10-04-2017
2.00
Rudder pedals

 10-01-2017
2.00
Rudder pedal assembly
       

 10-01-2017
2.00
Baggage side skins, fuel lines, valve filter line
       

 09-20-2017
2.00
Finish center brace, left fuel line install
       

 09-16-2017
3.00
Flap motor bracket, baggage floor splice
       

 09-14-2017
3.00
Baggage floors, seat hinges
       

 09-07-2017
1.50
Baggage floor install, fuel selector
       

 09-04-2017
3.00
Baggage floor install
       

 09-02-2017
3.00
Fuel valve install,install bushings, seatback hing
       

 08-22-2017
1.50
Rivet center bottomskin
     

 08-17-2017
2.00
Bulkhead installation
       

 08-09-2017
1.50
Fuselage bulkhead install, rivet skins
       

 07-26-2017
2.50
Bulkhead install, rivet fuselage top
       

 04-19-2017
2.00
Leading edge close out, rod end install
       

 04-17-2017
1.50
Aft fusulage close out
       

 04-12-2017
2.00
Top side skins assembly
       

 04-09-2017
3.00
Side skins prep
       

 04-08-2017
1.50
Top skin prep, Match drill
       

 03-30-2017
2.00
Aft deck installation
       

 03-14-2017
1.50
Phone cable, aft deck install
     

 03-12-2017
3.50
Rudder cable guides,pitot static lines
       

 03-09-2017
2.00
Rudder stops, and nut plates
       

 02-28-2017
1.50
Rivet tail cone , challenging night! Quit early...
     

 02-20-2017
2.00
Rivet skins fuselage
       

 02-18-2017
2.00
Rivet skins fusulage
Details
       

 02-15-2017
2.00
Rivet bottom skins aft fuselage
     

 02-12-2017
5.00
Lower aft fusalage installation, prep for riveting
       

 02-05-2017
2.00
Wiring harness install,prepare side skins for rive
Details
       

 01-28-2017
5.00
Aft fuselage assembly, dimple,prepare parts
Details
       

 01-26-2017
2.50
Bottom skin and bulkhead riveting
Details
       

 01-17-2017
2.50
Battery angle and bellcrank assembly,bottom skin
       

 01-14-2017
2.50
Bulkhead assembly, prepare bottom skin
Details
       

 01-10-2017
2.50
Bulkhead prep
       

 01-08-2017
2.50
Bulkhead
       

 01-05-2017
1.50
bulkhead prep
       

 01-02-2017
4.00
parts prep, rudder stops, drill vertical stab,star
       










Copyright © 2001-2024 Matronics. All Rights Reserved.