Date
|
Hours
|
Work Log Summary
|
Details
|
12-20-2017
|
1.50
|
Install powder coated rollbar
|
|
|
|
12-13-2017
|
1.50
|
Stiffner side wall attach
|
|
|
|
12-10-2017
|
4.00
|
Finish roll bar,
|
Details
|
|
|
12-02-2017
|
3.50
|
Roll Bar
|
|
|
|
11-29-2017
|
1.50
|
Start Roll Bar
|
|
|
|
11-26-2017
|
3.50
|
Finish and install control sticks
|
Details
|
|
|
11-18-2017
|
3.00
|
Bell crank assembly, drill control sticks
|
|
|
|
11-15-2017
|
2.50
|
Elevator pushrod assembly
|
|
|
|
11-11-2017
|
1.50
|
Install flap actuator motor, prep air vents
|
|
|
|
11-04-2017
|
3.00
|
Flap torque arm install, correct rudder pedals
|
|
|
|
11-02-2017
|
2.00
|
Route install rudder cables
|
|
|
|
10-22-2017
|
4.50
|
Install brake lines
|
|
|
|
10-14-2017
|
3.00
|
Attach brake pedal assemblies
|
|
|
|
10-07-2017
|
1.00
|
Prime and paint firewall
|
|
|
|
10-04-2017
|
2.00
|
Rudder pedals
|
|
|
|
10-01-2017
|
2.00
|
Rudder pedal assembly
|
|
|
|
10-01-2017
|
2.00
|
Baggage side skins, fuel lines, valve filter line
|
|
|
|
09-20-2017
|
2.00
|
Finish center brace, left fuel line install
|
|
|
|
09-16-2017
|
3.00
|
Flap motor bracket, baggage floor splice
|
|
|
|
09-14-2017
|
3.00
|
Baggage floors, seat hinges
|
|
|
|
09-07-2017
|
1.50
|
Baggage floor install, fuel selector
|
|
|
|
09-04-2017
|
3.00
|
Baggage floor install
|
|
|
|
09-02-2017
|
3.00
|
Fuel valve install,install bushings, seatback hing
|
|
|
|
08-22-2017
|
1.50
|
Rivet center bottomskin
|
|
|
|
08-17-2017
|
2.00
|
Bulkhead installation
|
|
|
|
08-09-2017
|
1.50
|
Fuselage bulkhead install, rivet skins
|
|
|
|
07-26-2017
|
2.50
|
Bulkhead install, rivet fuselage top
|
|
|
|
04-19-2017
|
2.00
|
Leading edge close out, rod end install
|
|
|
|
04-17-2017
|
1.50
|
Aft fusulage close out
|
|
|
|
04-12-2017
|
2.00
|
Top side skins assembly
|
|
|
|
04-09-2017
|
3.00
|
Side skins prep
|
|
|
|
04-08-2017
|
1.50
|
Top skin prep, Match drill
|
|
|
|
03-30-2017
|
2.00
|
Aft deck installation
|
|
|
|
03-14-2017
|
1.50
|
Phone cable, aft deck install
|
|
|
|
03-12-2017
|
3.50
|
Rudder cable guides,pitot static lines
|
|
|
|
03-09-2017
|
2.00
|
Rudder stops, and nut plates
|
|
|
|
02-28-2017
|
1.50
|
Rivet tail cone , challenging night! Quit early...
|
|
|
|
02-20-2017
|
2.00
|
Rivet skins fuselage
|
|
|
|
02-18-2017
|
2.00
|
Rivet skins fusulage
|
Details
|
|
|
02-15-2017
|
2.00
|
Rivet bottom skins aft fuselage
|
|
|
|
02-12-2017
|
5.00
|
Lower aft fusalage installation, prep for riveting
|
|
|
|
02-05-2017
|
2.00
|
Wiring harness install,prepare side skins for rive
|
Details
|
|
|
01-28-2017
|
5.00
|
Aft fuselage assembly, dimple,prepare parts
|
Details
|
|
|
01-26-2017
|
2.50
|
Bottom skin and bulkhead riveting
|
Details
|
|
|
01-17-2017
|
2.50
|
Battery angle and bellcrank assembly,bottom skin
|
|
|
|
01-14-2017
|
2.50
|
Bulkhead assembly, prepare bottom skin
|
Details
|
|
|
01-10-2017
|
2.50
|
Bulkhead prep
|
|
|
|
01-08-2017
|
2.50
|
Bulkhead
|
|
|
|
01-05-2017
|
1.50
|
bulkhead prep
|
|
|
|
01-02-2017
|
4.00
|
parts prep, rudder stops, drill vertical stab,star
|
|
|