KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
Work Logs Found: 12
Category Work Time: 22 Hours
 Date
Hours
Work Log Summary

Details

 12-22-2016
2.50
Aileron torque tube attachment
Details

 12-21-2016
3.00
Rework of seat hardpoints / Keel airleron bearing
Details

 10-30-2016
2.50
Install 2" flange to warm-air duct
Details

 10-29-2016
2.00
Lay-up patch to cover 1.75" warm-air vent hole
Details

 10-23-2016
0.50
Lay-up patch to cover 2x 1.5" holes in oil-cooler
Details

 10-22-2016
3.00
Warm-air ducting
Details

 10-18-2016
2.00
Prime small aluminum parts.
Details

 10-16-2016
1.50
Prep various aluminum parts for primer. Treat with
Details

 10-15-2016
1.50
Locate and drill rudder pedal bellcrank support br
Details

 10-12-2016
2.00
Second layer glass on oil cooler flange. Locate an
Details

 10-10-2016
1.00
Sand interior of nose section and oil cooler bypas
Details

 10-09-2016
1.00
Glass (fabricate) oil cooler attachment flange
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.