Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
Cowl
Work Logs Found:
48
Category Work Time:
37 Hours
Date
Hours
Work Log Summary
Details
01-13-2019
0.50
Top Cowl Repaint 2
Details
12-16-2018
0.50
Repainted Lower Cowl 3
Details
07-04-2018
1.00
Heat shield on lower cowl
Details
06-01-2018
1.00
Cowls Finalize Hinge Pins
Details
12-08-2017
1.00
Reflective Material Upper Cowl
Details
12-08-2017
1.00
Reflective Material Lower Cowl
12-07-2017
1.00
Cowl hinge pin
Details
07-14-2017
0.10
Rubber Grommet
Details
07-14-2017
0.10
Baffle Hole Plugs
07-13-2017
0.20
Baffles Underneath Rods 3
Details
07-13-2017
0.20
Baffles Underneath Rods 2
Details
07-13-2017
1.00
Baffles Underneath Rods 1
Details
02-20-2017
0.10
Finishing the Cowl
Details
02-16-2017
0.50
Lower Cowl Aft Bracket 3
Details
02-16-2017
1.00
Lower Cowl Aft Bracket 2
Details
02-15-2017
1.00
Lower Cowl Aft Bracket 1
Details
02-14-2017
1.00
Lower Cowl Forward Platenuts
Details
02-06-2017
0.20
Lower Cowl Hinge Install 2
Details
01-06-2017
1.00
Lower Cowl Hinge Install 1
Details
01-03-2017
1.00
Upper Cowl Top Pins Latch
Details
01-02-2017
0.30
Cowl Pin Covers 4
01-02-2017
0.20
Cowl Pin Covers 3
01-02-2017
1.00
Cowl Pin Covers 2
01-02-2017
1.00
Cowl Pin Covers 1
Details
01-01-2017
1.00
Upper Cowl Smooth Pores
Details
01-01-2017
1.00
Upper Cowl Inlet Baffles 2
Details
01-01-2017
0.50
Upper Cowl Inlet Baffles 1a
Details
01-01-2017
1.00
Upper Cowl Inlet Baffles 1
Details
01-01-2017
0.50
Oil Door 4
01-01-2017
1.00
Oil Door 3
Details
01-01-2017
1.00
Oil Door 2
Details
01-01-2017
1.00
Oil Door 1
Details
12-10-2016
1.00
Installing Upper Cowl Top Hinges
Details
12-10-2016
1.00
Installing Cowl Side Hinges 2
Details
12-10-2016
1.00
Installing Cowl Side Hinges 1
Details
12-10-2016
1.00
Cowl Instal 11 Fitting Upper Cowl
Details
12-10-2016
1.00
Cowl Instal 10 Fitting Upper Cowl
Details
12-09-2016
1.00
Cowl Instal 9 Fitting Upper Cowl
Details
12-09-2016
1.00
Cowl Instal 8 Fitting Upper Cowl
Details
12-09-2016
1.00
Cowl Instal 7 Fitting Upper Cowl
Details
12-09-2016
1.00
Cowl Instal 6 Fitting Upper Cowl
Details
12-09-2016
1.00
Cowl Instal 5 Fitting Upper Cowl
Details
12-09-2016
1.00
Cowl Instal 4 Fitting the Front of both cowls
Details
12-09-2016
0.20
Cowl Instal 3 Upper Hinge
12-09-2016
0.50
Cowl Instal 2 Upper Hinge
Details
12-09-2016
1.00
Cowl Instal 1 Upper Hinge
Details
04-29-2016
0.20
Cowl Hinges on Fuselage 2
Details
04-29-2016
1.00
Cowl Hinges on Fuselage 1
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.