KitLog pro

Powered By Kitlog Pro v2.0

JOE'S WEB SITE
Work Logs Found: 34
Category Work Time: 96 Hours
 Date
Hours
Work Log Summary

Details

 12-01-2018
4.00
First Inspection and Maintenance
Details
       

 06-01-2017
2.00
Mount oil recovery tank and gascolator
Details
       

 05-17-2017
4.00
EMS-Wiring for Oil Pressure and Temperature
Details
       

 05-16-2017
5.00
EMS-Wiring
Details

 04-18-2017
3.00
Oil Cooler Configuration Complete
Details
       

 04-10-2017
7.00
Configuring Oil Cooler
       

 04-07-2017
2.00
Configuring Oil Cooler
Details
       

 03-29-2017
4.00
Attach Oil Level Check Door
Details
       

 03-28-2017
3.00
Cowl installation
Details
     

 03-27-2017
3.00
Camloc determination
Details
       

 03-22-2017
6.00
Cowling Fitting
Details
       

 03-15-2017
1.00
Wired Regulator
Details
     

 03-14-2017
1.00
Trimmed excess material form skin
Details
       

 03-07-2017
2.00
Installed SCAT
       

 02-27-2017
4.00
Removed Lower Engine Mount & Install Cabin Heat Ca
Details
       

 02-25-2017
7.00
Finalize air box, battery mount & cabin heat mixer
Details
       

 02-11-2017
4.00
Installed Battery, Cabin/Carb Heat Box, Starter So
Details
     

 02-10-2017
1.00
Mate Carb/Cabin Heat with Muffler
Details
       

 02-10-2017
3.00
Attachd Muffler to Engine
Details
       

 02-06-2017
0.00
Install Air Box Cable (Carb Heat) #2
Details
       

 02-06-2017
3.00
Install Air Box Cable (Carb Heat) #1
       

 02-05-2017
2.00
Fabricate New Choke Cable Connection
Details
       

 01-31-2017
2.00
Connect Choke Cable
Details
     

 12-17-2016
1.00
Reangle Cart Heat Cable Outer Clamp
Details
       

 12-17-2016
0.00
Reangle Cart Heat Cable Outer Clamp
     

 12-15-2016
3.00
Throttle, Choke, Cabin Heat & Carb Heat Work
Details
       

 12-14-2016
3.00
Installed and connected throttles to carburetor
Details
       

 12-13-2016
3.00
Dual Throttle Redesign and Insatll
Details
       

 12-12-2016
2.00
Mount Airbox
Details
     

 12-10-2016
1.00
Change Angle of Carb Heat Cable Outer Clamp
Details
       

 12-08-2016
3.00
Attached engine mount to engine and mounted engine
Details
       

 12-03-2016
1.00
Painted Engine Mount and Nose Wheel Fork

 12-02-2016
3.00
Cleaned and primed engine mount and nose wheel for
Details
       

 11-29-2016
3.00
Inventoried FWF Kit
       










Copyright © 2001-2024 Matronics. All Rights Reserved.