Powered By Kitlog Pro v2.0
PAUL'S WEB SITE
Cabin Eagle
Empennage
Work Logs Found:
63
Category Work Time:
98 Hours
Date
Hours
Work Log Summary
Details
12-30-2018
1.00
Work on elevator trim
12-27-2018
1.00
Paint touch up
12-26-2018
1.00
Paint touch up
12-25-2018
1.00
Paint touch up
12-20-2018
1.00
Work on Horizontal stablizer. Setup arduino test b
12-12-2018
1.00
Paint aileron
08-09-2018
1.50
Prime empennage. Wiring
08-06-2018
1.50
Prime empennage. Wiring
08-05-2018
4.00
Continue work on replacement empennage struts. Pri
08-02-2018
1.00
Work on replacement empennage struts.
07-31-2018
1.50
Continue covering verticals. Wiring
07-25-2018
1.50
continue covering verticals.
07-23-2018
1.00
Tail light housing
07-19-2018
1.50
Paint. work on empennage struts
07-14-2018
2.00
Install and setup elevator controls and stops. Mea
07-13-2018
2.00
Continue color coats on hor. stab. and elevators.
07-12-2018
1.50
Mask and apply 2nd base color to topp of hor. stab
07-11-2018
1.00
Paint horizontal stablizer
07-10-2018
1.00
Paint horizontal stablizer
06-30-2018
3.00
Prime horizontal stablizer. Fit elevator trim tab
06-29-2018
2.00
Prime horizontal stablizer
06-21-2018
1.50
Cover 2nd side of elevators. Add tapes to horizont
06-20-2018
0.50
Shrink 2nd side of horizontal stablizer and 1st si
06-19-2018
1.50
Cover 2nd side of horizontal stablizer. Begin cove
08-01-2017
1.00
Continue rigging elevators.
07-30-2017
5.00
Rigging rudder cables and elevator controls. Start
07-26-2017
1.00
Work on rudder cables.
06-27-2017
3.00
Complete prep and priming of tail feathers and str
06-11-2017
5.00
Prepare and Prime tail feathers
06-04-2017
3.00
Prepare tail feather struts
05-24-2017
1.50
Final welding of tail feathers
05-05-2017
3.00
Final welding on horizontal stabliser
05-03-2017
1.00
Work on trim tab servo install
05-02-2017
1.00
Final weld on Elevator
05-01-2017
0.50
Work on trim tab
04-27-2017
1.50
Work on elevator trim tab
04-26-2017
1.00
Work on tail feathers
04-23-2017
4.00
Work on Tail feather ribs
01-19-2017
1.00
Work on Rudder cable routing and rudder pedals
01-18-2017
1.00
Work on Rudder cable routing and rudder pedals
01-17-2017
1.50
Work on Rudder cable routing
01-16-2017
4.00
Rebuild pedal assembly. Work on Horizontal stablis
01-06-2017
1.00
Work on Elevator Torque tube
01-05-2017
1.00
Work on Elevator torque tube
01-04-2017
0.50
Add structure to support Elevator control tube
12-30-2016
2.00
Rudder Stops and controls
12-29-2016
1.00
Work on Elevator controls
12-28-2016
1.50
Work on Elevator controls
12-27-2016
0.50
Work on Elevator
12-20-2016
1.00
Work on elevator
12-04-2016
3.00
Build elevator horn. Start layout of controls and
12-02-2016
2.00
Build and tack together Elevators
12-01-2016
1.00
Continue work on horizontal stabliser
11-30-2016
1.00
Tack together horizontal stabliser
11-29-2016
1.00
Bend tubes for horizontal stabliser leading edge.
11-28-2016
1.00
Weld up last Elevator Hinge section
11-17-2016
1.00
Work on Rudder
11-16-2016
0.50
Mock up rudder hinges
11-15-2016
1.00
Build Elevator hinges
11-07-2016
1.00
Work on Fin
11-06-2016
1.00
Build hinges for Rudder. Work on fuel tank, Layout
11-05-2016
1.00
Work on Fin
11-03-2016
0.50
Mock up Fin
SITE NAVIGATION
Contact Builder
Cabin Eagle Home
Category
# Logs
# Hours
All
717
1313
Avionics
18
34
Empennage
63
98
Engine
21
44
Fuel System
16
22
Fuselage
289
460
General Assembly
50
132
Miscellaneous
73
93
None
11
Prop
1
2
Tools
3
10
Wings
156
396
Wings
16
22
Copyright © 2001-2024 Matronics. All Rights Reserved.