Date
|
Hours
|
Work Log Summary

|
Details

|
07-03-2018
|
3.00
|
adj K factor; adj elev trim indic.; rewire elev tr
|
Details
|
|
|
06-24-2018
|
0.00
|
Fully clean ADSB report - PASS
|
Details
|
  |
|
04-30-2018
|
0.50
|
adj AP VRT and pitch trim speed
|
Details
|
|
|
04-25-2018
|
0.00
|
ADSB pass e-mail
|
Details
|
 |
|
04-23-2018
|
0.20
|
K factor adjustment #1
|
Details
|
 |
|
04-07-2018
|
1.00
|
update GNS 530W with correct, current SW
|
Details
|
|
|
04-07-2018
|
1.00
|
install LED status light for TT autotrim; and cali
|
Details
|
|
|
04-02-2018
|
0.50
|
switch wires for Dynon power in....now +5v as it s
|
|
  |
|
04-02-2018
|
0.00
|
install new GPS ground plane
|
Details
|
|
|
04-02-2018
|
1.00
|
get SW version; T Jason no pics...some on phone
|
Details
|
  |
|
04-02-2018
|
2.50
|
fab, fit and install ground plane for GDU 460 and
|
Details
|
|
|
03-05-2018
|
2.00
|
xponder antenna cont'd
|
|
|
|
03-05-2018
|
2.00
|
testing ADSB-530W communication per Garmin
|
Details
|
|
|
03-05-2018
|
2.00
|
Dynon D1 power supply
|
Details
|
|
|
03-05-2018
|
2.00
|
change out transponder antenna
|
Details
|
|
|
03-05-2018
|
2.00
|
AP autotrim trim
|
Details
|
|
|
12-24-2017
|
2.50
|
static ins and outs
|
Details
|
  |
|
12-23-2017
|
5.00
|
pitot-static all good; ARINC 429 good
|
Details
|
|
|
12-18-2017
|
3.00
|
more pitot troubleshooting
|
Details
|
|
|
12-16-2017
|
3.00
|
more troubleshooting ADSB and pitot issues
|
Details
|
  |
|
12-12-2017
|
3.00
|
more TX troubleshooting
|
Details
|
  |
|
12-11-2017
|
3.00
|
more troubleshooting
|
Details
|
|
|
12-11-2017
|
0.00
|
door seal pump; pitot-static test tool
|
|
|
|
11-29-2017
|
2.00
|
T Jason troubleshooting issues
|
Details
|
|
|
11-29-2017
|
1.00
|
redo pitot and AOA fittings at wing tip
|
Details
|
|
|
11-29-2017
|
1.00
|
Adjust prop govenor to stop; was only getting ~250
|
|
|
|
11-19-2017
|
7.00
|
1st flight; troubleshoot squawks
|
Details
|
|
|
10-19-2017
|
3.00
|
fix tach sensor wiring; clear up remaining open it
|
Details
|
  |
|
10-15-2017
|
2.25
|
rewire RPM and FF
|
Details
|
|
|
10-15-2017
|
6.00
|
many Misc items
|
Details
|
|
|
10-09-2017
|
3.00
|
pull R mag; install Garmin RPM sensor
|
Details
|
|
|
10-09-2017
|
2.25
|
Misc. finalizing items
|
Details
|
|
|
10-09-2017
|
2.50
|
misc cont'd
|
Details
|
|
|
10-03-2017
|
4.00
|
pitot-static-xponder cert test
|
Details
|
 |
|
10-02-2017
|
5.75
|
engine start; magnetometer cal., misc
|
Details
|
|
|
09-25-2017
|
2.00
|
mag interference test; calibrate fuel tanks
|
Details
|
|
|
09-25-2017
|
2.50
|
fix P8 flap control; ELT
|
Details
|
  |
|
09-23-2017
|
1.50
|
wire up ELT connection; help hangar neighbor with
|
Details
|
|
|
09-23-2017
|
0.50
|
Batts (2014) A=27.3v, B (2012) =26.2 volts
|
Details
|
|
|
09-16-2017
|
1.50
|
Study P-8 wires CP stick; rewire pitot; zip ties
|
Details
|
|
|
09-16-2017
|
1.50
|
secure all wires mid and aft.
|
|
|
|
09-11-2017
|
1.75
|
troubleshoot co-pilot stick grip issues
|
Details
|
|
|
09-11-2017
|
1.25
|
pitot and ELT
|
Details
|
|
|
09-11-2017
|
1.25
|
load Sorcerer settings; more pitot fooling
|
Details
|
|
|
09-11-2017
|
3.00
|
cont. check out of G3 install
|
Details
|
  |
|
09-09-2017
|
3.25
|
W&B; connect batteries
|
Details
|
|
|
09-09-2017
|
1.50
|
Power up
|
Details
|
|
|
09-04-2017
|
3.75
|
vent hose, adels, shunt, cb cover
|
Details
|
|
|
09-04-2017
|
2.00
|
G3X screens & radios back in. MILESTONE!
|
Details
|
 |
|
09-04-2017
|
1.50
|
CB plate; pitot-aoa-static lines
|
Details
|
|
|
09-04-2017
|
1.25
|
adels behind panel; GPS & XM antennae
|
|
|
|
08-31-2017
|
0.00
|
pics 3
|
Details
|
|
|
08-31-2017
|
0.00
|
pics 2
|
Details
|
|
|
08-31-2017
|
3.75
|
numerous small items
|
Details
|
|
|
08-31-2017
|
0.00
|
firewall schematic drawing-behind panel connection
|
Details
|
  |
|
08-31-2017
|
0.00
|
add 1A fuse to shunt leads
|
Details
|
|
|
08-17-2017
|
1.00
|
work on co-pilot vent hose
|
Details
|
|
|
08-17-2017
|
1.00
|
move ground block to a different, more accessible
|
Details
|
|
|
08-17-2017
|
0.00
|
L side so far
|
|
|
|
08-17-2017
|
1.00
|
Attempt to make main power connection
|
Details
|
|
|
08-15-2017
|
2.75
|
pull GMU 22 cable-run opposite direction, repin
|
Details
|
  |
|
08-14-2017
|
3.00
|
Relocate dimmer; pilot side rails; route and conne
|
Details
|
  |
|
08-13-2017
|
1.00
|
hang panel; install GPS/XM ant.shelf; CR2 batt to
|
Details
|
|
|
08-13-2017
|
5.25
|
begin reconnecting everything
|
Details
|
|
|
08-13-2017
|
0.00
|
additional pics
|
Details
|
|
|
08-07-2017
|
1.00
|
sort & secure wires on panel; clean front window
|
|
  |
|
08-07-2017
|
0.00
|
part 2
|
Details
|
|
|
08-07-2017
|
6.00
|
many final small tasks before hanging panel back o
|
Details
|
|
|
08-07-2017
|
0.50
|
make rough schematic of what needs to be connector
|
Details
|
 |
|
08-03-2017
|
2.00
|
ring out P-2,3; ground block strap, main buss term
|
|
|
|
08-03-2017
|
2.00
|
figure GPS & XM antennas; fab shelf, set 1st click
|
Details
|
|
|
08-03-2017
|
0.00
|
figure ant. shelf; locate, set 1st click bond
|
Details
|
|
|
08-03-2017
|
0.00
|
buss to CB
|
Details
|
 |
|
08-03-2017
|
2.50
|
adels, zip ties, RTV... tidy up wire runs
|
Details
|
|
|
07-30-2017
|
1.00
|
wig-wag wiring to P-1, pin 14; pull some old VP wi
|
Details
|
|
|
07-30-2017
|
0.00
|
P-13 plug end.
|
Details
|
 |
|
07-30-2017
|
2.00
|
P-1-0 fuel probes, ELT, VR #2 sense wires, door se
|
Details
|
 |
|
07-30-2017
|
2.25
|
GTX 345 cable and antenna cable
|
Details
|
|
|
07-29-2017
|
1.50
|
run GMU 22 magnetometer cable - left side
|
Details
|
|
|
07-29-2017
|
1.50
|
re-install RAM air cable
|
Details
|
|
|
07-29-2017
|
1.00
|
plan GTX wiring run; drill holes. No pics yet.
|
Details
|
  |
|
07-24-2017
|
0.50
|
re-install parking brake cable
|
|
  |
|
07-24-2017
|
1.25
|
re-install oil cooler, heat and defrost cables
|
Details
|
|
|
07-24-2017
|
0.75
|
mount magnetometer shelf
|
Details
|
|
|
07-24-2017
|
1.25
|
install power plug for Dynon D1
|
Details
|
|
|
07-24-2017
|
1.50
|
hall effect sensor to Alt 2 B lead
|
Details
|
|
|
07-24-2017
|
0.00
|
3 cables + parking in; just ram air left to do
|
|
 |
|
07-17-2017
|
0.40
|
voltage sense jumper VR1 to VR2
|
Details
|
|
|
07-17-2017
|
2.25
|
final mounting of av fan, dimmer, and 12V converte
|
|
|
|
07-17-2017
|
1.25
|
add alternate static valve and related plumbing
|
Details
|
|
|
07-16-2017
|
1.75
|
replumb pitot-static AOA with SafeAir fittings
|
Details
|
|
|
07-16-2017
|
0.50
|
add 2nd click bonds for avionics fan & dimmer
|
|
|
|
07-02-2017
|
1.00
|
pull new 3C shielded wire in R wing for OAT
|
Details
|
  |
|
07-02-2017
|
0.75
|
place dimmer/fan/inverter; click bond 1
|
Details
|
|
|
07-02-2017
|
0.75
|
misc shop
|
|
  |
|
07-02-2017
|
1.00
|
flox in GTX45R rack under R rear seat
|
Details
|
|
|
07-02-2017
|
1.25
|
finish wiring all connectors for OAT tips & fusela
|
|
  |
|
07-02-2017
|
2.00
|
Figure out and Fab mounting brackets for GTX45R
|
|
|
|
06-26-2017
|
2.00
|
wire VR1 and VR2, ammeter shunt
|
|
|
|
06-26-2017
|
2.00
|
wire up molex for FF and RPM
|
|
 |
|
06-26-2017
|
1.50
|
wire up GTP 59 OAT
|
Details
|
|
|
06-26-2017
|
1.75
|
ring out wig-wag wires and wire up tip ends of bot
|
Details
|
|
|
06-26-2017
|
1.50
|
misc adels and zip ties; plan GTX45R mounting loca
|
Details
|
  |
|
06-26-2017
|
1.25
|
fool with turning mag to get new tach sensor on
|
Details
|
|
|
06-26-2017
|
1.00
|
finish up pitot and AOA plumbing/wiring
|
|
|
|
06-19-2017
|
2.50
|
wire up oil temp, fuel psi, oil psi, map, adels le
|
Details
|
|
|
06-18-2017
|
5.75
|
wire up EGT and CHT; route
|
|
|
|
06-18-2017
|
2.00
|
unpack & inventory panel box
|
|
|
|
06-18-2017
|
2.00
|
sensor manifold
|
Details
|
|
|
06-18-2017
|
0.00
|
sensor manifold
|
|
 |
|
05-25-2017
|
1.00
|
Oil temp sensor
|
Details
|
|
|
05-25-2017
|
0.00
|
GMU 44 bracket final assembly
|
Details
|
|
|
05-25-2017
|
3.00
|
finish GMU 22 bracket & platform
|
Details
|
|
|
05-23-2017
|
2.50
|
work on GMU 22 magnetometer shelf
|
Details
|
|
|
05-23-2017
|
1.00
|
ring out J243 tach wires
|
Details
|
 |
|
05-22-2017
|
3.25
|
Garmin GAP 26 pitot/AOA
|
Details
|
|
|
05-21-2017
|
4.75
|
Begin G3X install
|
Details
|
|
|
05-08-2017
|
2.50
|
install defroster; adels for wire run; ready for i
|
Details
|
|
|
04-10-2017
|
4.50
|
add last click bond for defrost plenum; reroute &
|
Details
|
  |
|
04-03-2017
|
0.00
|
VR #2 cont'd
|
|
|
|
04-03-2017
|
1.25
|
Voltage Reg #2; add SB1B-28, pull LS-1
|
Details
|
|
|
04-03-2017
|
1.25
|
run AOA tubing; verify sync wires for Rec LIghts
|
Details
|
|
|
04-03-2017
|
0.00
|
Rec Light wiring cont'd
|
|
|
|
04-03-2017
|
1.00
|
defroster fit cont'd; add 3 more clic bonds
|
|
  |
|
12-30-2016
|
3.50
|
pull all control cables; ALT, OIL, HEAT, DEFROST,
|
Details
|
  |
|
12-24-2016
|
3.50
|
rang out 3 RG400 lines; run new wire, vac.
|
Details
|
|
|
12-19-2016
|
0.00
|
weigh-in
|
Details
|
|
|
12-19-2016
|
1.00
|
Pul old magnetometer and xponder cable; tidy up wi
|
|
  |
|
12-19-2016
|
1.00
|
plan out mag shelf extension; cut phenolic, drill
|
Details
|
|
|
12-19-2016
|
0.00
|
panel ready for boxing up
|
|
|
|
12-19-2016
|
3.00
|
finish boxing up panel for shipment
|
|
|
|
12-12-2016
|
3.25
|
Continue cleaning up wires; remove rest of interio
|
Details
|
  |
|
11-30-2016
|
2.00
|
Pull remaining parts/wires; ready to pack up
|
Details
|
|
|
11-14-2016
|
5.75
|
pull parts, seats & side panels out, panel out
|
Details
|
|
|
11-08-2016
|
2.50
|
pull ARINC, EM wiring, Cables etc
|
Details
|
  |
|
11-07-2016
|
5.75
|
Pull AFS sensors and VP200 CU unit
|
Details
|
  |
|
10-31-2016
|
0.00
|
Pulling Day 1, part 3
|
|
|
|
10-31-2016
|
6.75
|
Begin removal of original panel for Upgrade
|
Details
|
 |
|
10-31-2016
|
0.00
|
Begin pulling panel
|
Details
|
|