05-19-2020
|
1.50
|
Auto Pilot Ground Tests, Adjust Oil Press Alarm
|
Details
|
  |
|
02-21-2020
|
6.75
|
Trouble Shoot & Calibrate. Seal Firewall
|
Details
|
  |
|
02-20-2020
|
4.25
|
Installed Labels, Entered Set Points and Ranges
|
Details
|
  |
|
02-16-2020
|
4.00
|
Avionics Trouble Shooting
|
Details
|
  |
|
02-12-2020
|
5.00
|
Configuring I/O Channels. Diagnosing Elev. Trim P
|
Details
|
  |
|
02-11-2020
|
4.25
|
Updated Avionics Software. Started Calibration.
|
Details
|
  |
|
12-13-2019
|
7.25
|
Installed Pitot/AOA and Fuel Level Transmitters
|
Details
|
  |
|
12-12-2019
|
3.25
|
Installed GTP 59 OAT. Begin fitting Pitot Tube
|
Details
|
  |
|
12-10-2019
|
6.50
|
Install GMU 11 & Stick Grips
|
Details
|
  |
|
11-26-2019
|
3.25
|
Updated Drawings to As Built
|
Details
|
  |
|
10-14-2019
|
6.75
|
Install Yaw Servo, F-1025 Rear Seat Side Covers
|
Details
|
  |
|
10-11-2019
|
5.50
|
Installed Pitch Servo for Autopilot
|
Details
|
  |
|
09-05-2019
|
7.75
|
Install Right Wing Connector, Add Lighting Pot Gro
|
Details
|
  |
|
08-12-2019
|
5.00
|
Completed G5 Wiring, Epoxy Sealed Lower Cowl
|
Details
|
  |
|
08-09-2019
|
7.00
|
G5 Mounting & Wiring
|
Details
|
  |
|
08-08-2019
|
6.25
|
G5 Bracket Design, Glare Shield Cover
|
Details
|
  |
|
08-07-2019
|
5.25
|
GMU Mount & Connectors for GMU and GSA 28
|
Details
|
  |
|
08-06-2019
|
7.25
|
Fix Overhead Lights, Seat Heaters; Worked on G5 Mo
|
Details
|
  |
|
08-02-2019
|
7.00
|
Instrument Lights, Overhead Lights
|
Details
|
  |
|
08-01-2019
|
3.50
|
Software Updates, Com Tests, Config Checks
|
Details
|
  |
|
07-19-2019
|
3.00
|
Installed Stick Switch Connectors
|
Details
|
  |
|
07-18-2019
|
6.00
|
Trouble Shoot Seat Heat & Switch Lights
|
Details
|
  |
|
07-17-2019
|
7.25
|
CAN Bus Trouble Shooting & Repair
|
Details
|
  |
|
07-16-2019
|
7.00
|
CAN Bus Trouble Shooting
|
Details
|
  |
|
07-15-2019
|
7.25
|
Reviewing Config. Requirements
|
Details
|
  |
|
07-11-2019
|
7.25
|
CAN Bus Trouble Shooting
|
Details
|
  |
|
07-10-2019
|
7.00
|
Installed GDUs & GTN. First Power to Panel
|
Details
|
  |
|
07-09-2019
|
7.25
|
Center Breakers, Close Center Panel, Replace Coax
|
Details
|
  |
|
07-08-2019
|
5.50
|
Closed Right Section Panel, Started Center Breaker
|
Details
|
  |
|
07-05-2019
|
7.75
|
Right Side Breakers & Avionics Tray
|
Details
|
  |
|
07-02-2019
|
7.50
|
Cut Right Avionics Tray, Removed heater cables, wi
|
Details
|
  |
|
07-01-2019
|
8.00
|
Coax Connections, Stick Grip Wires, Right Air Vent
|
Details
|
  |
|
06-28-2019
|
7.25
|
Transponder Antenna. Heater SCAT tubing Install
|
Details
|
  |
|
06-26-2019
|
7.00
|
Right Side Panel Wiring
|
Details
|
  |
|
06-25-2019
|
7.25
|
Right Panel: GAD 27 & GEA 24
|
Details
|
  |
|
06-24-2019
|
7.75
|
Left Side Completion, GAD 27 Connectors
|
Details
|
  |
|
06-21-2019
|
7.25
|
Left Panel Finalization
|
Details
|
  |
|
06-20-2019
|
7.25
|
ELT Wiring, Left Tray Modification
|
Details
|
  |
|
06-19-2019
|
7.00
|
ELT Install, Coax Connectors, Revised GTR 20 Locat
|
Details
|
  |
|
06-18-2019
|
7.75
|
Rudder Trim, Heater Cables
|
Details
|
  |
|
06-17-2019
|
7.75
|
Fitting Center Side Panels to Control Panel
|
Details
|
  |
|
06-14-2019
|
2.25
|
Control Panel Center Console Sides
|
Details
|
  |
|
06-13-2019
|
7.25
|
Continued Left Panel Wiring Work
|
Details
|
  |
|
06-12-2019
|
7.25
|
GMA 245 Wiring Completed, Alternator and Battery C
|
Details
|
  |
|
06-11-2019
|
7.25
|
Rear Headset Jacks, Audio Wiring Prep.
|
Details
|
  |
|
06-10-2019
|
4.25
|
Notched Sub-Panel for GTN 650
|
Details
|
  |
|
06-07-2019
|
7.50
|
Re-Installed LRU Cages and Installed Main Harness
|
Details
|
  |
|
05-14-2019
|
5.50
|
Completed GEA 24 P243 Connector
|
Details
|
  |
|
05-13-2019
|
7.00
|
Began Panel Install, Completed P242 GEA 24
|
Details
|
  |
|
05-03-2019
|
6.50
|
Routed Engine Sensor Wires
|
Details
|
  |
|
05-02-2019
|
6.00
|
Engine Sensors
|
Details
|
  |
|
04-26-2019
|
4.50
|
Completed G5 Case Frame
|
Details
|
  |
|
04-25-2019
|
7.50
|
Creating Case for G5 Mounting
|
Details
|
  |
|
04-24-2019
|
7.00
|
CAN Bus Connections, Ign Switch Wiring
|
Details
|
  |
|
04-23-2019
|
6.50
|
Switch & Breaker Wiring; CAN-Bus Wiring
|
Details
|
  |
|
04-22-2019
|
6.25
|
Power & Switch Wiring, Seat Heater Switches
|
Details
|
  |
|
04-19-2019
|
5.00
|
Wired Panel Lights; CO Detector and Switch LEDs
|
Details
|
  |
|
04-18-2019
|
5.00
|
Ground Blocks; Lighted PushButtons
|
Details
|
  |
|
04-17-2019
|
6.75
|
IBBS Connector; Breakers; Power Leads
|
Details
|
  |
|
04-16-2019
|
7.75
|
CO Det; IBBS
|
Details
|
  |
|
04-10-2019
|
6.25
|
GTR 20 and GTX 45R Wiring
|
Details
|
  |
|
04-09-2019
|
3.75
|
GAD 29; GSU 25 Wiring
|
Details
|
  |
|
04-08-2019
|
8.25
|
GAD 29; GEA 24 P241; GMC 305 Wiring
|
Details
|
  |
|
04-05-2019
|
7.25
|
GAD 27 - P271 Connector Wiring
|
Details
|
  |
|
04-04-2019
|
6.50
|
GMA 245 Wiring
|
Details
|
  |
|
04-03-2019
|
3.50
|
GMA 245 Wiring Started
|
Details
|
  |
|
04-02-2019
|
8.25
|
Completed Wiring for GTN 650
|
Details
|
  |
|
04-01-2019
|
7.50
|
GTN 650 Wiring
|
Details
|
  |
|
03-29-2019
|
4.75
|
MFD & PFD2 Wiring
|
Details
|
  |
|
03-28-2019
|
6.75
|
PFD-1 & MFD Wiring
|
Details
|
  |
|
03-27-2019
|
3.50
|
PFD-1 Wiring
|
Details
|
  |
|
03-26-2019
|
7.00
|
PFD-1 Wiring Harness Fabrication Begins
|
Details
|
  |
|
03-25-2019
|
4.25
|
Determine CAN Bus Order & Document
|
Details
|
  |
|
03-22-2019
|
6.00
|
Measure & Create Harness Layout Board
|
Details
|
  |
|
03-21-2019
|
4.50
|
Avionics Relay, Switches, Measured Sub-Panel
|
Details
|
  |
|
03-20-2019
|
1.50
|
Sketched Wire Bundle Routing Diagream with Distanc
|
Details
|
  |
|
03-20-2019
|
5.00
|
Installing Breakers & ELT Control Head
|
Details
|
  |
|
03-19-2019
|
2.50
|
Determininng Breakers Install & Req'd Crimp Connec
|
Details
|
  |
|
03-18-2019
|
1.50
|
Enlarging Panel Holes
|
Details
|
  |
|
03-15-2019
|
5.50
|
Preparing Panel for Wiring
|
Details
|
  |
|
03-14-2019
|
5.00
|
Completed Wiring Diagrams
|
Details
|
  |
|
03-13-2019
|
6.75
|
Added Wire Numbers to Wiring Diagrams
|
Details
|
  |
|
03-12-2019
|
7.00
|
Wiring Diagrams Refinement
|
Details
|
  |
|
03-11-2019
|
8.50
|
Wiring Diagrams Development/Refinement
|
Details
|
  |
|
03-09-2019
|
1.50
|
Rivet Firewall Penetrations
|
Details
|
  |
|
03-06-2019
|
3.00
|
Reviewed & Marked-up Wiring Diagrams
|
Details
|
  |
|
03-05-2019
|
8.50
|
Revised Wiring Diagrams, Added A/C and Seat Heater
|
Details
|
  |
|
02-27-2019
|
6.50
|
Mounted LRUs to Panel Trays
|
Details
|
  |
|
02-26-2019
|
7.75
|
Mounting Voltage Regulators, GSU 25, CO Detector
|
Details
|
  |
|
02-25-2019
|
6.50
|
Determining LRU Mounting Locations
|
Details
|
  |
|
02-22-2019
|
6.50
|
Mounting GTX 45R Transponder Rack
|
Details
|
  |
|
02-20-2019
|
7.25
|
Mounting GTN650 Cage to Panel
|
Details
|
  |
|
02-18-2019
|
6.00
|
Preparing Avionics Cage Mounting
|
Details
|
  |
|
02-15-2019
|
8.00
|
Panel Installation
|
Details
|
|
|
02-06-2019
|
2.50
|
Begin Fitting GTN 650 & Audio Panel to Aircraft
|
Details
|
|
|
02-05-2019
|
5.00
|
Avionics Inventory, Fuel Valve Extension
|
Details
|
  |
|
01-29-2019
|
4.75
|
Developing Wiring Diagrams
|
Details
|
  |
|
01-23-2019
|
7.00
|
Avionics LRU Wiring Diagrams
|
Details
|
  |
|
01-15-2019
|
4.50
|
Wiring Diagrams
|
Details
|
  |
|
10-28-2018
|
4.50
|
Avionics Wiring Diagrams
|
Details
|
  |
|
10-03-2018
|
3.50
|
Avionics Wiring Diagrams
|
Details
|
  |
|
09-15-2018
|
3.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
09-14-2018
|
5.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-14-2018
|
5.50
|
Continued Development of Avionics Wiring Diagrams
|
Details
|
  |
|
06-13-2018
|
2.50
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-12-2018
|
4.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-11-2018
|
3.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-07-2018
|
2.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-06-2018
|
5.00
|
Avionics Wiring Diagrams Creation
|
Details
|
  |
|
05-31-2018
|
3.00
|
Develop Draft LRU Pages in PowerPoint
|
Details
|
  |
|
05-30-2018
|
2.00
|
Organize Previous Avionics Work in Preparation
|
Details
|
  |
|
02-22-2018
|
7.50
|
Fitting Control Panel & Center Console
|
Details
|
  |
|
02-21-2018
|
7.25
|
Started Fitting Control Panel to Aircraft
|
Details
|
  |
|
02-06-2018
|
1.25
|
Unpacked & Inventoried Panel & Parts
|
Details
|
  |
|
01-03-2018
|
1.50
|
Final Review of Panel CAD Drawing
|
Details
|
  |
|
12-12-2017
|
1.00
|
Panel Layout
|
Details
|
  |
|
11-20-2017
|
2.00
|
Panel Design
|
Details
|
  |
|
11-09-2017
|
3.00
|
Panel Planning
|
Details
|
  |
|
08-02-2017
|
5.00
|
Planning & Ordering Avionics Equipment
|
Details
|
  |
|
07-31-2017
|
4.50
|
Planning for Panel Avionics Order
|
Details
|
  |
|
06-09-2017
|
7.75
|
Tail Cone Wiring Harness
|
Details
|
  |
|
06-08-2017
|
2.00
|
Wiring diagrams Development
|
Details
|
  |
|
06-07-2017
|
5.00
|
Preparation for Tail Cone and Wing Wiring
|
Details
|
  |
|
06-01-2017
|
7.00
|
Creating Avionics Wiring Diagrams
|
Details
|
  |
|
04-20-2017
|
3.00
|
Installled Headset Jack Recess Panels
|
Details
|
  |
|
04-05-2017
|
5.75
|
Installed Molex Connectors to Trim Servos
|
Details
|
  |
|
04-04-2017
|
5.00
|
Flap Position Transmitter
|
Details
|
  |
|
03-31-2017
|
1.50
|
Coax Labels
|
Details
|
  |
|
03-29-2017
|
6.25
|
Installed Coax Antenna Connectors, Rung Out Wires
|
Details
|
  |
|
03-20-2017
|
7.00
|
Fabricated Bracket for Flap Position Sensor & Pull
|
Details
|
  |
|
03-13-2017
|
7.75
|
Avionics Wiring In Fuselage
|
Details
|
  |
|
03-09-2017
|
4.00
|
Developed Listing of Avionics Wires To Be Installe
|
Details
|
  |
|
01-24-2017
|
4.50
|
Install Coax to Tail Cone
|
Details
|
  |
|
12-12-2016
|
5.50
|
GPS Antenna Installation
|
Details
|
|
|
12-07-2016
|
6.00
|
Install Antennas
|
Details
|
  |
|
11-03-2016
|
9.00
|
Researching Avionics/Electrical Requirements
|
Details
|
  |
|
10-31-2016
|
6.50
|
Installed Vent Fans In Panel Top
|
Details
|
|