HERB'S WEB SITE
Peitenpol Air Camper
controls
Work Logs Found:
6
Category Work Time:
27 Hours
Date
Hours
Work Log Summary
Details
07-17-2017
1.00
elavator stop
07-17-2017
8.00
elavator control linkage
Details
08-31-2016
4.00
cables
02-07-2016
8.00
control stick
02-01-2016
5.00
Bellcrank
01-23-2016
1.00
Material for control stick and bell crank