Powered By Kitlog Pro v2.0
Johns Web Site
RV-12iS
24.0 Rollover Struct
Work Logs Found:
9
Category Work Time:
28 Hours
Date
Hours
Work Log Summary
Details
05-13-2017
5.00
Roll Bar Final Installation
Details
04-30-2017
3.00
Baggage Bulkhead Assembly
Details
12-30-2016
4.00
Baggage bulkheads
Details
11-23-2016
3.00
Roll bar final assembly
Details
11-22-2016
3.00
Roll bar frame assembly and roll bar bases
Details
10-30-2016
1.50
Canopy catch installation and latch plate
Details
10-29-2016
3.00
Machine Countersink of outer roll bar flanges
Details
10-23-2016
2.00
Continued work on Rollover Structure
Details
10-22-2016
3.00
Deburring rollover structure parts and trial assem
Details
SITE NAVIGATION
Contact Builder
RV-12iS Home
Category
# Logs
# Hours
All
502
1448
10.0 Tailcone
32
89
11.0 Empenage Assemb
9
28
11.0 Empennage Attac
9
28
11iS Empenange Attac
5
8
12iS Emmpenage Fairi
1
2
13.0 Wing Spar Assem
5
16
14.0 Rear Spar, Stub
9
18
14.0 Wing
9
18
15.0 Wing Ribs
17
55
16.0 Stall Warning
4
7
17.0 Wing Skins
36
110
18.0 Flaperons
12
42
20.0 Fuselage Center
6
22
20is Center Section
32
89
21.0 Mid Fuse Ribs a
36
118
21IS Mid Fuse Ribs a
21
96
22.0 Fwd Lower Fusel
6
22
22iS/U FWD Lower Fus
5
21
23.0 Fuselage Side S
19
62
23iS/U Side Skins
13
44
24.0 Rollover Struct
9
28
24iS/U Rollover Stru
9
34
25iS/U Seatbacks
3
11
26.0 Seat Backs
2
6
26iS/U Fuel Tank
1
4
27 iS Fuel Syste
6
18
27.0 Rudder Pedals a
5
16
27iS/U iS Fuel Syste
6
18
28.0 Fuel System
7
22
28iS/U Rudder Pedals
3
13
29A.0 Fwd Upper Fuse
12
33
29iS/U FWD Upper Fus
13
46
32iS/U Flight Contro
3
7
35GiS/U Preminum Bra
1
3
35iS/U Landing Geat
1
1
40.0 Lighting
13
38
6.0 Vertical Stabili
17
38
7.0 Rudder
11
22
7A Trim Tab
1
2
8.0 Anti Servo Tabs
5
9
9.0 Horizontal Stabi
24
42
Empennage
4
9
Empennage
17
38
Empennage/Tailcone K
17
38
Fixtures
2
9
Fuselage
6
9
Hangar
4
Miscellaneous
7
22
SB 18-02-03 AST
1
2
SB180202
2
5
Shop Supplies
2
8
Wings
2
2
Copyright © 2001-2024 Matronics. All Rights Reserved.