KitLog pro

Powered By Kitlog Pro v2.0

PAUL'S WEB SITE
Work Logs Found: 289
Category Work Time: 460 Hours
 Date
Hours
Work Log Summary

Details

 03-22-2020
0.50
Reinstall brake lines to pedals

 03-01-2020
1.00
Test fit pedal extensions

 02-25-2020
0.50
Build spring extension for repositioned pedals

 01-26-2020
1.00
Trial fit pedals. Fit strut stiffener. Install win

 01-21-2020
0.50
Paint rudder pedals

 01-19-2020
0.50
Trial fit pedals

 01-14-2020
1.00
Complete welding right side pedals

 01-12-2020
1.00
Complete welding left side pedals

 01-08-2020
1.50
Begin widening pedal assembly

 01-07-2020
1.50
Trial fit pedals

 01-02-2020
1.00
REpair and modify rudder pedals

 12-30-2019
1.00
Build windshield standoffs. Build strut stiffeners

 12-16-2019
1.00
Reassemble left door

 12-09-2019
0.50
Reassemble door

 12-02-2019
0.75
Build Camera mount

 12-01-2019
2.00
Complete windshield install. Program engine monito

 07-17-2019
2.00
Hanger - Reinstall landing gear

 07-11-2019
1.50
Prepare fuselage for move to hanger

 07-01-2019
1.50
Paint misc metal fittings. Repair and paint exhaus

 06-30-2019
5.00
Install landing gear. Rub brake lines and install

 06-27-2019
1.50
Final paint on landing gear. Work on left side doo

 06-25-2019
1.50
Claen up and prime landing gear. Prepare wheels fo

 06-24-2019
1.50
Complete welding on new landing gear

 06-19-2019
2.00
Continue work on landing gear

 06-16-2019
4.00
Build new longer landing gear

 06-14-2019
2.00
Build new longer landing gea

 06-12-2019
2.00
Begin building new longer landing gear

 06-06-2019
1.00
Make temporary stands. Lift nose to new required h

 06-04-2019
1.50
Final assembly of console and switch panel

 05-31-2019
3.00
Tidy up wiring. Work on fuel line. Mount fire exti

 05-28-2019
4.00
Mount battery box. Run battery cables

 05-22-2019
1.00
Prime center section. Work on main ground and feed

 05-20-2019
1.50
Cover center section

 04-14-2019
2.00
Work on firewall corners. Build heater box

 04-10-2019
0.50
Work on firewall corners

 04-07-2019
3.00
Temporarily mount engine. Adjust ailerons

 04-03-2019
2.00
At hanger. Fit temp engine mount. work on aileron

 04-01-2019
1.00
Prepare temp. firewall

 03-31-2019
1.00
Work on engine mount
Details
     

 03-26-2019
2.00
Attach wing to fuselage. Measure for aileron pivot

 01-01-2019
4.00
Attach left wing to fuselage. Work on elevator tri

 10-08-2018
1.00
Touch up paint

 10-04-2018
1.00
Touch up paint. repair tire

 10-03-2018
1.00
Touchup paint

 09-30-2018
2.00
Attach doors. Take fuselage to hanger. Bring left

 09-27-2018
1.00
Paint misc. small parts

 09-26-2018
1.00
Build bracket for tailwheel spring

 09-25-2018
1.50
Assembly

 09-24-2018
1.50
Assembly

 09-23-2018
4.00
Assembly

 09-20-2018
1.50
Complete painting interior parts. Prepare fittings

 09-19-2018
1.50
repaint interior parts. Connect brake lines to ped

 09-18-2018
1.50
Install beacon. Reinstall floor, reinstall pedals.

 09-16-2018
2.00
Paint interior parts

 09-13-2018
1.00
Replace control hardware with castlenuts

 09-11-2018
1.00
Attach windscreen to fuselage

 09-07-2018
1.50
Trim windscreen to fit doors. Replace suspension h
     

 09-05-2018
1.00
Paint antenna mount. Work on brake lines. Work on

 09-04-2018
1.00
Begin running brake lines. work on right side air

 09-03-2018
4.00
Complete dash. Cutout windscreen. Install left sid
     

 08-30-2018
1.00
Prep and prime dash

 08-28-2018
1.50
Work on dash

 08-24-2018
2.00
Fit and bolt center section

 08-23-2018
1.00
Torque bolts

 07-18-2018
0.50
Paint touch up

 07-17-2018
0.50
Paint touch up

 07-09-2018
1.00
Cover center section leading edge. Paint base colo

 07-08-2018
2.00
General assembly
       

 07-03-2018
6.00
Prime horizontal stablizer. Fuel tank vent assembl

 06-28-2018
1.00
Paint touchup

 06-27-2018
1.00
Paint red stripe on fuselage

 06-26-2018
2.00
Paint 2nd base coat (Blue) on upper fuselage

 06-25-2018
1.50
Mask for 2nd base coat. Shrink fabric on elevators

 06-24-2018
3.00
Prep and paint gray base on fuselage

 06-18-2018
1.00
last primer coat on fuselage.shrink 1st side of ho

 06-17-2018
3.00
2nd primer coat. Begin covering horizontal stabliz

 06-15-2018
2.00
Finish tapes on upper side of fuselage. 1st primer

 06-14-2018
2.00
Fit rudder cable fairings. Complete tapes

 06-12-2018
0.50
Final primer coat on underside of fuselage

 06-11-2018
1.00
Sand and second cross coat of primer

 06-10-2018
0.50
Prime bottom of fuselage

 06-07-2018
1.00
Covering - Add tapes

 06-06-2018
1.50
Covering - Add tapes

 06-05-2018
1.50
Covering - Add tapes

 06-05-2018
1.50
Covering - add tapes

 06-03-2018
0.50
Covering - tighten upper part of cabin and below d

 06-01-2018
1.00
Covering - Upper part of cabin and below door

 05-31-2018
0.50
Covering - Tighten center part of cabin. install d

 05-30-2018
3.00
Covering - Tighten lower part of cabin. Cover uppe

 05-29-2018
3.00
Covering - tighten rear of fueslage. Cover lower p

 05-28-2018
5.00
Covering

 05-27-2018
2.00
Covering - underside

 05-23-2018
0.50
Prepare underside of fuselage for covering

 05-22-2018
0.50
cover section above left door

 05-21-2018
0.50
Cover section above right door

 05-18-2018
4.00
Final paint fuselage and interior parts

 05-15-2018
0.50
Clean up center section

 05-14-2018
0.50
Work on center section

 05-13-2018
3.00
Paint other parts

 05-12-2018
4.00
Final paint fuselage (ran out of paint)

 05-04-2018
2.50
Final prime fuselage

 05-02-2018
2.50
Final welding on fuselage and controls

 04-30-2018
5.00
Final weld both wing extensions. Work on center se

 04-26-2018
1.00
Work on right wing mount extension

 04-25-2018
1.00
Work on center section

 04-23-2018
1.00
Work on center section

 04-22-2018
3.00
Fuselage back from Pisgah. Work on inner torque tu

 04-19-2018
1.50
Door assembly

 04-18-2018
1.50
Door assembly

 04-13-2018
2.00
Finalize measure for wing adjustment

 04-12-2018
1.50
Begin assembly of doors. Build jury strut lower mo

 04-11-2018
1.00
Top coat aluminium parts

 04-10-2018
1.50
Top coat Aluminium parts

 04-09-2018
1.00
Prime misc parts
       

 04-07-2018
2.00
Prime Aluminium parts

 04-06-2018
2.00
Aileron Alignment

 04-03-2018
1.00
Prime Aluminium parts

 04-01-2018
3.50
Work on Ailerons and front center section. Alodine

 03-28-2018
1.00
Prepare Aluminium panels

 03-25-2018
2.00
Work on wing alignment. Ailerons

 03-19-2018
1.00
Work on Aileron push rods and pivot

 03-14-2018
2.00
Mockup modified torque tube pivot. Measure for squ

 03-12-2018
1.00
Build extended Aileron Torque tube pivot

 03-10-2018
4.00
Attach wings. Mock up Ailerons. Measure for bolts
       

 03-01-2018
1.50
Work on struts
     

 02-28-2018
1.00
Weld rear center section support tabs

 02-27-2018
1.50
Weld rear center section support

 02-22-2018
0.50
Discover out of square condition on rear of cabin

 02-21-2018
1.00
Work on center section leading edge

 02-20-2018
1.00
Weld on tabs for ELT

 02-19-2018
2.00
Work on fuselage

 02-15-2018
1.50
Work on center section. Prepare paint booth

 01-25-2018
1.00
Work on center section leading edge

 01-24-2018
1.50
Work on windscreen template and center section

 01-23-2018
1.00
Work on windscreen template

 01-21-2018
2.00
Work on center section and glpvebox

 01-15-2018
4.00
Attach wings
Details

 01-11-2018
0.50
work on center section

 01-10-2018
1.00
Work on center section and dash

 01-09-2018
1.50
Prime last welded sections. Work on center section

 01-08-2018
1.50
Cleanup Panel. Work on center section

 01-06-2018
1.00
Cutout panel for instruments

 01-01-2018
1.00
Panel layout

 12-29-2017
1.50
Build dash panel

 12-28-2017
1.50
Mock up rear wing mounts.
Details

 12-26-2017
4.00
Final welding front wing mounts

 12-25-2017
3.00
Building dash

 12-21-2017
1.00
Begin building dash

 12-20-2017
2.00
Align both wing mounts
     

 12-19-2017
2.00
Build right wing mount

 12-18-2017
2.00
Build left kick panel
Details
     

 12-17-2017
4.00
Bring fuselage back from Hanger.
Details
       

 12-15-2017
2.00
Right side kick panel
       

 10-08-2017
2.00
Final welding on fuselage

 10-02-2017
0.50
Work on center section

 10-01-2017
1.00
Work on center section

 09-24-2017
4.00
Final welding on top and front of fuselage

 09-20-2017
1.50
Weld tabs. Build Engine mount spools

 09-19-2017
1.50
Build and weld tabs.Finish weld engine mount plate

 09-18-2017
1.00
Build tabs for kick panel Aluminium. Work on Alumi

 08-30-2017
1.50
Wiring

 08-28-2017
1.50
Work on center consol

 08-27-2017
1.00
Wiring

 08-23-2017
0.50
Work on latch for left door

 08-21-2017
1.50
Wiring and work on latch for left door

 08-20-2017
4.00
Work on center section leading edge

 08-06-2017
2.50
Door holds. Wiring.
     

 07-24-2017
1.00
Continue work on doors. Build 2nd strut attach.

 07-23-2017
1.50
Continue work on doors. Build 2nd strut attach.

 07-17-2017
1.00
Work on doors.
     

 07-16-2017
3.00
Work on doors.
     

 07-06-2017
1.00
Attach floor boards.

 06-23-2017
1.00
Bend up SS Firewall.

 06-22-2017
1.00
Final welding on firewall. Bend SS for firewall.

 06-21-2017
1.00
Continue work on left door. Research fuel line.
     

 06-20-2017
1.00
Work on throttle linkage

 06-18-2017
4.00
Work on left door.
     

 06-13-2017
1.00
Paint rudder pedals and control column

 06-12-2017
1.00
Work on left door hinge.

 06-08-2017
1.50
Build door handle (right)
       

 06-06-2017
1.00
Mockup electrical panel. Work on right door.
     

 06-02-2017
2.00
Work on right door
     

 05-31-2017
1.50
Work on right door hinges.
     

 05-30-2017
1.50
Work on right door frame

 05-29-2017
5.00
Install rear fuel tank mount and front support bar

 05-22-2017
3.00
Final welding horizontal stabliser and rudder. Cut
     

 05-21-2017
3.00
Complete pedals and install brake master cylinder.
     

 05-17-2017
1.00
Weld in tubing for Panel and components

 05-09-2017
1.50
Aluminium floor panels
       

 04-24-2017
1.00
Weld Control tube ends

 04-19-2017
1.00
Work on Left wheel/brake

 04-18-2017
1.00
Assembly of Left Front Landing gear

 04-17-2017
0.50
Work on Right step

 04-16-2017
0.50
Work on Right wheel/brake

 04-13-2017
1.00
Assembly of Right Front Landing gear
     

 04-11-2017
1.00
Final Welding on Landing gear

 04-05-2017
1.00
Final Welding on Landing gear

 04-04-2017
1.00
Final Welding on Landing gear

 04-02-2017
2.00
Color coat on Fuselage (Blue)
     

 03-30-2017
1.00
Inject Tubeseal in painted areas and rivet closed
     

 03-29-2017
2.00
2nd coat of primer on fuselage

 03-26-2017
7.00
Sand and Clean fuselage rear of panel. Prime

 03-24-2017
1.00
Work on Firewall engine mount fittings

 03-24-2017
2.50
Weld windsheild tabs, Tab floor tabs

 03-23-2017
1.00
Make tabs for windshield

 03-22-2017
1.00
Final welding, Light grinding

 03-21-2017
1.00
Final welding - Tabs, Brackets, Door mods.
     

 03-14-2017
1.00
Tubeseal
     

 03-12-2017
5.00
Final welding - Tabs, Brackets, Battery door, Door
     

 03-08-2017
1.50
Final welding - Tabs, Brackets, Door mods.

 03-06-2017
1.00
Final welding - Tabs, Brackets, Door mods.

 03-05-2017
3.00
Final welding - Tabs, Brackets,Door mods

 02-28-2017
1.00
more Tabs and Brackets

 02-27-2017
1.00
Modifications to passenger side door frame
       

 02-26-2017
6.00
Tabs and Brackets
       

 01-12-2017
1.00
Work on Elevator controls

 01-09-2017
0.50
Work on Elevator controls

 01-02-2017
3.00
Work on Rudder Pedals. Modicications to floor

 01-01-2017
3.00
Work on Rudder Pedals
       

 12-19-2016
1.00
Work on controls
       

 12-18-2016
2.00
Complete 2nd seat. Work on controls
       

 12-14-2016
1.00
Prepare 2nd seat
       

 12-11-2016
1.00
Work on Elevator control torque tube and pivots

 12-08-2016
0.50
Weld up Aileron control tube

 12-07-2016
0.50
Cut out materials for 2nd seat

 12-06-2016
1.00
Continue work on controls

 12-05-2016
1.00
Continue work on controls

 11-24-2016
1.00
Mock up right wing to Fueslage
Details
       

 11-11-2016
2.50
Add diagonals to cabin top. Add seat support, Weld
     

 11-02-2016
1.00
Landing Gear installed

 11-01-2016
1.00
Fitting Landing gear

 10-31-2016
1.00
Final welding around station 1

 10-30-2016
1.50
Add additional bracing beneath seat and floor
     

 10-25-2016
1.00
Final weld landing gear fittings

 10-24-2016
1.00
Final weld tail wheel support

 10-19-2016
0.50
Cur out tabs

 10-18-2016
0.50
Cut out tabs

 10-14-2016
1.00
Work on Landing gear
       

 10-06-2016
1.00
Finish and install 1st seat
     

 10-04-2016
1.50
Continue 1st seat and build seat hardware
       

 10-03-2016
1.50
Seats

 10-02-2016
1.00
Cut out strips for seats
     

 09-29-2016
0.50
Work on Landing Gear
       

 09-28-2016
0.50
Work on Landing Gear

 09-26-2016
0.50
Work on Landing Gear

 09-24-2016
3.00
Work on Landing Gear
     

 09-23-2016
2.00
Work on Landing Gear
       

 09-21-2016
1.50
Complete installation of left side Landing Gear fi
       

 09-20-2016
1.00
Complete installation of right side landing gear f
       

 09-19-2016
0.50
Work onLanding gear fittings

 09-12-2016
1.00
Work on Landing Gear fittings

 09-06-2016
1.50
Continue fully welding fuselage

 09-05-2016
2.00
Continue fully welding fuselage
       

 09-04-2016
3.00
Begin fully welding fuselage
       

 08-31-2016
0.50
Drill holes for tubeseal

 08-29-2016
1.00
Work on fuel tank, prep for final welding

 08-24-2016
1.50
Work on seat adjusters

 08-23-2016
0.75
Add last diagonals from station 2 to station 1

 08-22-2016
0.50
Work on fuel tank and leading edge center section

 08-11-2016
0.75
Begin work on seat adjusters
     

 08-10-2016
0.75
Cut out tabs

 08-09-2016
1.00
Add cabin top diagonal. Work on tabs. Work on cent

 08-08-2016
1.50
Add 2nd diagonal from Cabin top to station 1, add

 08-05-2016
1.00
Add tubes from cabin top to station 1 plus 1 diago

 08-03-2016
1.50
Continue work on landing gear to fuselage fittings

 08-01-2016
0.75
Continue work on landing gear to fuselage fittings

 07-31-2016
1.00
Cleaned up 1st four landing gear fuselage fittings

 07-28-2016
1.50
Bend and tack lower longerons to station 1. work o

 07-27-2016
1.50
Add diagonals from upper to lower longerons for st
     

 07-26-2016
0.50
Begin cutting out landing gear fuselage fittings
     

 07-26-2016
1.50
Add diagonals from upper to lower longerons for st
     

 07-20-2016
1.00
Add diagonals from upper to lower longerons for st
     

 07-20-2016
1.50
Add cross braces to station 1. Add diagonals from
     

 07-19-2016
1.00
Build station 1 on bench and fully weld
       

 07-18-2016
1.50
complete diagonals between bottom longerons
     

 07-16-2016
1.00
Add diagonals from upper to lower longerons for st
     

 07-11-2016
1.00
Add diagonals from upper to longer longerons for s
     

 07-10-2016
1.50
Complete diagonals between bottom longerons

 07-09-2016
1.50
Cut all remaining diagonals for tail section

 07-04-2016
2.50
Add diagonals fron station 3 to station 4
       

 07-03-2016
1.50
Tack in station 4
     

 07-02-2016
1.00
Install upper Longerons
     

 07-01-2016
1.00
Bend Longerons and tack in tail post
     

 06-30-2016
1.50
Add door diagonals and corner bracing
     

 06-25-2016
1.00
Install spreaders for seat back and panel
     

 06-24-2016
1.50
Build cabin top (with wing mounts)
       

 06-23-2016
1.50
Add cabin uprights - Stations 2 and 3
       

 06-21-2016
1.50
Tack cabin floor spreaders and diagonal
       

 06-19-2016
1.50
Layout fuselage on bench
       










Copyright © 2001-2024 Matronics. All Rights Reserved.