Date
|
Hours
|
Work Log Summary
|
Details
|
03-22-2020
|
0.50
|
Reinstall brake lines to pedals
|
|
|
|
03-01-2020
|
1.00
|
Test fit pedal extensions
|
|
|
|
02-25-2020
|
0.50
|
Build spring extension for repositioned pedals
|
|
|
|
01-26-2020
|
1.00
|
Trial fit pedals. Fit strut stiffener. Install win
|
|
|
|
01-21-2020
|
0.50
|
Paint rudder pedals
|
|
|
|
01-19-2020
|
0.50
|
Trial fit pedals
|
|
|
|
01-14-2020
|
1.00
|
Complete welding right side pedals
|
|
|
|
01-12-2020
|
1.00
|
Complete welding left side pedals
|
|
|
|
01-08-2020
|
1.50
|
Begin widening pedal assembly
|
|
|
|
01-07-2020
|
1.50
|
Trial fit pedals
|
|
|
|
01-02-2020
|
1.00
|
REpair and modify rudder pedals
|
|
|
|
12-30-2019
|
1.00
|
Build windshield standoffs. Build strut stiffeners
|
|
|
|
12-16-2019
|
1.00
|
Reassemble left door
|
|
|
|
12-09-2019
|
0.50
|
Reassemble door
|
|
|
|
12-02-2019
|
0.75
|
Build Camera mount
|
|
|
|
12-01-2019
|
2.00
|
Complete windshield install. Program engine monito
|
|
|
|
07-17-2019
|
2.00
|
Hanger - Reinstall landing gear
|
|
|
|
07-11-2019
|
1.50
|
Prepare fuselage for move to hanger
|
|
|
|
07-01-2019
|
1.50
|
Paint misc metal fittings. Repair and paint exhaus
|
|
|
|
06-30-2019
|
5.00
|
Install landing gear. Rub brake lines and install
|
|
|
|
06-27-2019
|
1.50
|
Final paint on landing gear. Work on left side doo
|
|
|
|
06-25-2019
|
1.50
|
Claen up and prime landing gear. Prepare wheels fo
|
|
|
|
06-24-2019
|
1.50
|
Complete welding on new landing gear
|
|
|
|
06-19-2019
|
2.00
|
Continue work on landing gear
|
|
|
|
06-16-2019
|
4.00
|
Build new longer landing gear
|
|
|
|
06-14-2019
|
2.00
|
Build new longer landing gea
|
|
|
|
06-12-2019
|
2.00
|
Begin building new longer landing gear
|
|
|
|
06-06-2019
|
1.00
|
Make temporary stands. Lift nose to new required h
|
|
|
|
06-04-2019
|
1.50
|
Final assembly of console and switch panel
|
|
|
|
05-31-2019
|
3.00
|
Tidy up wiring. Work on fuel line. Mount fire exti
|
|
|
|
05-28-2019
|
4.00
|
Mount battery box. Run battery cables
|
|
|
|
05-22-2019
|
1.00
|
Prime center section. Work on main ground and feed
|
|
|
|
05-20-2019
|
1.50
|
Cover center section
|
|
|
|
04-14-2019
|
2.00
|
Work on firewall corners. Build heater box
|
|
|
|
04-10-2019
|
0.50
|
Work on firewall corners
|
|
|
|
04-07-2019
|
3.00
|
Temporarily mount engine. Adjust ailerons
|
|
|
|
04-03-2019
|
2.00
|
At hanger. Fit temp engine mount. work on aileron
|
|
|
|
04-01-2019
|
1.00
|
Prepare temp. firewall
|
|
|
|
03-31-2019
|
1.00
|
Work on engine mount
|
Details
|
|
|
03-26-2019
|
2.00
|
Attach wing to fuselage. Measure for aileron pivot
|
|
|
|
01-01-2019
|
4.00
|
Attach left wing to fuselage. Work on elevator tri
|
|
|
|
10-08-2018
|
1.00
|
Touch up paint
|
|
|
|
10-04-2018
|
1.00
|
Touch up paint. repair tire
|
|
|
|
10-03-2018
|
1.00
|
Touchup paint
|
|
|
|
09-30-2018
|
2.00
|
Attach doors. Take fuselage to hanger. Bring left
|
|
|
|
09-27-2018
|
1.00
|
Paint misc. small parts
|
|
|
|
09-26-2018
|
1.00
|
Build bracket for tailwheel spring
|
|
|
|
09-25-2018
|
1.50
|
Assembly
|
|
|
|
09-24-2018
|
1.50
|
Assembly
|
|
|
|
09-23-2018
|
4.00
|
Assembly
|
|
|
|
09-20-2018
|
1.50
|
Complete painting interior parts. Prepare fittings
|
|
|
|
09-19-2018
|
1.50
|
repaint interior parts. Connect brake lines to ped
|
|
|
|
09-18-2018
|
1.50
|
Install beacon. Reinstall floor, reinstall pedals.
|
|
|
|
09-16-2018
|
2.00
|
Paint interior parts
|
|
|
|
09-13-2018
|
1.00
|
Replace control hardware with castlenuts
|
|
|
|
09-11-2018
|
1.00
|
Attach windscreen to fuselage
|
|
|
|
09-07-2018
|
1.50
|
Trim windscreen to fit doors. Replace suspension h
|
|
|
|
09-05-2018
|
1.00
|
Paint antenna mount. Work on brake lines. Work on
|
|
|
|
09-04-2018
|
1.00
|
Begin running brake lines. work on right side air
|
|
|
|
09-03-2018
|
4.00
|
Complete dash. Cutout windscreen. Install left sid
|
|
|
|
08-30-2018
|
1.00
|
Prep and prime dash
|
|
|
|
08-28-2018
|
1.50
|
Work on dash
|
|
|
|
08-24-2018
|
2.00
|
Fit and bolt center section
|
|
|
|
08-23-2018
|
1.00
|
Torque bolts
|
|
|
|
07-18-2018
|
0.50
|
Paint touch up
|
|
|
|
07-17-2018
|
0.50
|
Paint touch up
|
|
|
|
07-09-2018
|
1.00
|
Cover center section leading edge. Paint base colo
|
|
|
|
07-08-2018
|
2.00
|
General assembly
|
|
|
|
07-03-2018
|
6.00
|
Prime horizontal stablizer. Fuel tank vent assembl
|
|
|
|
06-28-2018
|
1.00
|
Paint touchup
|
|
|
|
06-27-2018
|
1.00
|
Paint red stripe on fuselage
|
|
|
|
06-26-2018
|
2.00
|
Paint 2nd base coat (Blue) on upper fuselage
|
|
|
|
06-25-2018
|
1.50
|
Mask for 2nd base coat. Shrink fabric on elevators
|
|
|
|
06-24-2018
|
3.00
|
Prep and paint gray base on fuselage
|
|
|
|
06-18-2018
|
1.00
|
last primer coat on fuselage.shrink 1st side of ho
|
|
|
|
06-17-2018
|
3.00
|
2nd primer coat. Begin covering horizontal stabliz
|
|
|
|
06-15-2018
|
2.00
|
Finish tapes on upper side of fuselage. 1st primer
|
|
|
|
06-14-2018
|
2.00
|
Fit rudder cable fairings. Complete tapes
|
|
|
|
06-12-2018
|
0.50
|
Final primer coat on underside of fuselage
|
|
|
|
06-11-2018
|
1.00
|
Sand and second cross coat of primer
|
|
|
|
06-10-2018
|
0.50
|
Prime bottom of fuselage
|
|
|
|
06-07-2018
|
1.00
|
Covering - Add tapes
|
|
|
|
06-06-2018
|
1.50
|
Covering - Add tapes
|
|
|
|
06-05-2018
|
1.50
|
Covering - Add tapes
|
|
|
|
06-05-2018
|
1.50
|
Covering - add tapes
|
|
|
|
06-03-2018
|
0.50
|
Covering - tighten upper part of cabin and below d
|
|
|
|
06-01-2018
|
1.00
|
Covering - Upper part of cabin and below door
|
|
|
|
05-31-2018
|
0.50
|
Covering - Tighten center part of cabin. install d
|
|
|
|
05-30-2018
|
3.00
|
Covering - Tighten lower part of cabin. Cover uppe
|
|
|
|
05-29-2018
|
3.00
|
Covering - tighten rear of fueslage. Cover lower p
|
|
|
|
05-28-2018
|
5.00
|
Covering
|
|
|
|
05-27-2018
|
2.00
|
Covering - underside
|
|
|
|
05-23-2018
|
0.50
|
Prepare underside of fuselage for covering
|
|
|
|
05-22-2018
|
0.50
|
cover section above left door
|
|
|
|
05-21-2018
|
0.50
|
Cover section above right door
|
|
|
|
05-18-2018
|
4.00
|
Final paint fuselage and interior parts
|
|
|
|
05-15-2018
|
0.50
|
Clean up center section
|
|
|
|
05-14-2018
|
0.50
|
Work on center section
|
|
|
|
05-13-2018
|
3.00
|
Paint other parts
|
|
|
|
05-12-2018
|
4.00
|
Final paint fuselage (ran out of paint)
|
|
|
|
05-04-2018
|
2.50
|
Final prime fuselage
|
|
|
|
05-02-2018
|
2.50
|
Final welding on fuselage and controls
|
|
|
|
04-30-2018
|
5.00
|
Final weld both wing extensions. Work on center se
|
|
|
|
04-26-2018
|
1.00
|
Work on right wing mount extension
|
|
|
|
04-25-2018
|
1.00
|
Work on center section
|
|
|
|
04-23-2018
|
1.00
|
Work on center section
|
|
|
|
04-22-2018
|
3.00
|
Fuselage back from Pisgah. Work on inner torque tu
|
|
|
|
04-19-2018
|
1.50
|
Door assembly
|
|
|
|
04-18-2018
|
1.50
|
Door assembly
|
|
|
|
04-13-2018
|
2.00
|
Finalize measure for wing adjustment
|
|
|
|
04-12-2018
|
1.50
|
Begin assembly of doors. Build jury strut lower mo
|
|
|
|
04-11-2018
|
1.00
|
Top coat aluminium parts
|
|
|
|
04-10-2018
|
1.50
|
Top coat Aluminium parts
|
|
|
|
04-09-2018
|
1.00
|
Prime misc parts
|
|
|
|
04-07-2018
|
2.00
|
Prime Aluminium parts
|
|
|
|
04-06-2018
|
2.00
|
Aileron Alignment
|
|
|
|
04-03-2018
|
1.00
|
Prime Aluminium parts
|
|
|
|
04-01-2018
|
3.50
|
Work on Ailerons and front center section. Alodine
|
|
|
|
03-28-2018
|
1.00
|
Prepare Aluminium panels
|
|
|
|
03-25-2018
|
2.00
|
Work on wing alignment. Ailerons
|
|
|
|
03-19-2018
|
1.00
|
Work on Aileron push rods and pivot
|
|
|
|
03-14-2018
|
2.00
|
Mockup modified torque tube pivot. Measure for squ
|
|
|
|
03-12-2018
|
1.00
|
Build extended Aileron Torque tube pivot
|
|
|
|
03-10-2018
|
4.00
|
Attach wings. Mock up Ailerons. Measure for bolts
|
|
|
|
03-01-2018
|
1.50
|
Work on struts
|
|
|
|
02-28-2018
|
1.00
|
Weld rear center section support tabs
|
|
|
|
02-27-2018
|
1.50
|
Weld rear center section support
|
|
|
|
02-22-2018
|
0.50
|
Discover out of square condition on rear of cabin
|
|
|
|
02-21-2018
|
1.00
|
Work on center section leading edge
|
|
|
|
02-20-2018
|
1.00
|
Weld on tabs for ELT
|
|
|
|
02-19-2018
|
2.00
|
Work on fuselage
|
|
|
|
02-15-2018
|
1.50
|
Work on center section. Prepare paint booth
|
|
|
|
01-25-2018
|
1.00
|
Work on center section leading edge
|
|
|
|
01-24-2018
|
1.50
|
Work on windscreen template and center section
|
|
|
|
01-23-2018
|
1.00
|
Work on windscreen template
|
|
|
|
01-21-2018
|
2.00
|
Work on center section and glpvebox
|
|
|
|
01-15-2018
|
4.00
|
Attach wings
|
Details
|
|
|
01-11-2018
|
0.50
|
work on center section
|
|
|
|
01-10-2018
|
1.00
|
Work on center section and dash
|
|
|
|
01-09-2018
|
1.50
|
Prime last welded sections. Work on center section
|
|
|
|
01-08-2018
|
1.50
|
Cleanup Panel. Work on center section
|
|
|
|
01-06-2018
|
1.00
|
Cutout panel for instruments
|
|
|
|
01-01-2018
|
1.00
|
Panel layout
|
|
|
|
12-29-2017
|
1.50
|
Build dash panel
|
|
|
|
12-28-2017
|
1.50
|
Mock up rear wing mounts.
|
Details
|
|
|
12-26-2017
|
4.00
|
Final welding front wing mounts
|
|
|
|
12-25-2017
|
3.00
|
Building dash
|
|
|
|
12-21-2017
|
1.00
|
Begin building dash
|
|
|
|
12-20-2017
|
2.00
|
Align both wing mounts
|
|
|
|
12-19-2017
|
2.00
|
Build right wing mount
|
|
|
|
12-18-2017
|
2.00
|
Build left kick panel
|
Details
|
|
|
12-17-2017
|
4.00
|
Bring fuselage back from Hanger.
|
Details
|
|
|
12-15-2017
|
2.00
|
Right side kick panel
|
|
|
|
10-08-2017
|
2.00
|
Final welding on fuselage
|
|
|
|
10-02-2017
|
0.50
|
Work on center section
|
|
|
|
10-01-2017
|
1.00
|
Work on center section
|
|
|
|
09-24-2017
|
4.00
|
Final welding on top and front of fuselage
|
|
|
|
09-20-2017
|
1.50
|
Weld tabs. Build Engine mount spools
|
|
|
|
09-19-2017
|
1.50
|
Build and weld tabs.Finish weld engine mount plate
|
|
|
|
09-18-2017
|
1.00
|
Build tabs for kick panel Aluminium. Work on Alumi
|
|
|
|
08-30-2017
|
1.50
|
Wiring
|
|
|
|
08-28-2017
|
1.50
|
Work on center consol
|
|
|
|
08-27-2017
|
1.00
|
Wiring
|
|
|
|
08-23-2017
|
0.50
|
Work on latch for left door
|
|
|
|
08-21-2017
|
1.50
|
Wiring and work on latch for left door
|
|
|
|
08-20-2017
|
4.00
|
Work on center section leading edge
|
|
|
|
08-06-2017
|
2.50
|
Door holds. Wiring.
|
|
|
|
07-24-2017
|
1.00
|
Continue work on doors. Build 2nd strut attach.
|
|
|
|
07-23-2017
|
1.50
|
Continue work on doors. Build 2nd strut attach.
|
|
|
|
07-17-2017
|
1.00
|
Work on doors.
|
|
|
|
07-16-2017
|
3.00
|
Work on doors.
|
|
|
|
07-06-2017
|
1.00
|
Attach floor boards.
|
|
|
|
06-23-2017
|
1.00
|
Bend up SS Firewall.
|
|
|
|
06-22-2017
|
1.00
|
Final welding on firewall. Bend SS for firewall.
|
|
|
|
06-21-2017
|
1.00
|
Continue work on left door. Research fuel line.
|
|
|
|
06-20-2017
|
1.00
|
Work on throttle linkage
|
|
|
|
06-18-2017
|
4.00
|
Work on left door.
|
|
|
|
06-13-2017
|
1.00
|
Paint rudder pedals and control column
|
|
|
|
06-12-2017
|
1.00
|
Work on left door hinge.
|
|
|
|
06-08-2017
|
1.50
|
Build door handle (right)
|
|
|
|
06-06-2017
|
1.00
|
Mockup electrical panel. Work on right door.
|
|
|
|
06-02-2017
|
2.00
|
Work on right door
|
|
|
|
05-31-2017
|
1.50
|
Work on right door hinges.
|
|
|
|
05-30-2017
|
1.50
|
Work on right door frame
|
|
|
|
05-29-2017
|
5.00
|
Install rear fuel tank mount and front support bar
|
|
|
|
05-22-2017
|
3.00
|
Final welding horizontal stabliser and rudder. Cut
|
|
|
|
05-21-2017
|
3.00
|
Complete pedals and install brake master cylinder.
|
|
|
|
05-17-2017
|
1.00
|
Weld in tubing for Panel and components
|
|
|
|
05-09-2017
|
1.50
|
Aluminium floor panels
|
|
|
|
04-24-2017
|
1.00
|
Weld Control tube ends
|
|
|
|
04-19-2017
|
1.00
|
Work on Left wheel/brake
|
|
|
|
04-18-2017
|
1.00
|
Assembly of Left Front Landing gear
|
|
|
|
04-17-2017
|
0.50
|
Work on Right step
|
|
|
|
04-16-2017
|
0.50
|
Work on Right wheel/brake
|
|
|
|
04-13-2017
|
1.00
|
Assembly of Right Front Landing gear
|
|
|
|
04-11-2017
|
1.00
|
Final Welding on Landing gear
|
|
|
|
04-05-2017
|
1.00
|
Final Welding on Landing gear
|
|
|
|
04-04-2017
|
1.00
|
Final Welding on Landing gear
|
|
|
|
04-02-2017
|
2.00
|
Color coat on Fuselage (Blue)
|
|
|
|
03-30-2017
|
1.00
|
Inject Tubeseal in painted areas and rivet closed
|
|
|
|
03-29-2017
|
2.00
|
2nd coat of primer on fuselage
|
|
|
|
03-26-2017
|
7.00
|
Sand and Clean fuselage rear of panel. Prime
|
|
|
|
03-24-2017
|
1.00
|
Work on Firewall engine mount fittings
|
|
|
|
03-24-2017
|
2.50
|
Weld windsheild tabs, Tab floor tabs
|
|
|
|
03-23-2017
|
1.00
|
Make tabs for windshield
|
|
|
|
03-22-2017
|
1.00
|
Final welding, Light grinding
|
|
|
|
03-21-2017
|
1.00
|
Final welding - Tabs, Brackets, Door mods.
|
|
|
|
03-14-2017
|
1.00
|
Tubeseal
|
|
|
|
03-12-2017
|
5.00
|
Final welding - Tabs, Brackets, Battery door, Door
|
|
|
|
03-08-2017
|
1.50
|
Final welding - Tabs, Brackets, Door mods.
|
|
|
|
03-06-2017
|
1.00
|
Final welding - Tabs, Brackets, Door mods.
|
|
|
|
03-05-2017
|
3.00
|
Final welding - Tabs, Brackets,Door mods
|
|
|
|
02-28-2017
|
1.00
|
more Tabs and Brackets
|
|
|
|
02-27-2017
|
1.00
|
Modifications to passenger side door frame
|
|
|
|
02-26-2017
|
6.00
|
Tabs and Brackets
|
|
|
|
01-12-2017
|
1.00
|
Work on Elevator controls
|
|
|
|
01-09-2017
|
0.50
|
Work on Elevator controls
|
|
|
|
01-02-2017
|
3.00
|
Work on Rudder Pedals. Modicications to floor
|
|
|
|
01-01-2017
|
3.00
|
Work on Rudder Pedals
|
|
|
|
12-19-2016
|
1.00
|
Work on controls
|
|
|
|
12-18-2016
|
2.00
|
Complete 2nd seat. Work on controls
|
|
|
|
12-14-2016
|
1.00
|
Prepare 2nd seat
|
|
|
|
12-11-2016
|
1.00
|
Work on Elevator control torque tube and pivots
|
|
|
|
12-08-2016
|
0.50
|
Weld up Aileron control tube
|
|
|
|
12-07-2016
|
0.50
|
Cut out materials for 2nd seat
|
|
|
|
12-06-2016
|
1.00
|
Continue work on controls
|
|
|
|
12-05-2016
|
1.00
|
Continue work on controls
|
|
|
|
11-24-2016
|
1.00
|
Mock up right wing to Fueslage
|
Details
|
|
|
11-11-2016
|
2.50
|
Add diagonals to cabin top. Add seat support, Weld
|
|
|
|
11-02-2016
|
1.00
|
Landing Gear installed
|
|
|
|
11-01-2016
|
1.00
|
Fitting Landing gear
|
|
|
|
10-31-2016
|
1.00
|
Final welding around station 1
|
|
|
|
10-30-2016
|
1.50
|
Add additional bracing beneath seat and floor
|
|
|
|
10-25-2016
|
1.00
|
Final weld landing gear fittings
|
|
|
|
10-24-2016
|
1.00
|
Final weld tail wheel support
|
|
|
|
10-19-2016
|
0.50
|
Cur out tabs
|
|
|
|
10-18-2016
|
0.50
|
Cut out tabs
|
|
|
|
10-14-2016
|
1.00
|
Work on Landing gear
|
|
|
|
10-06-2016
|
1.00
|
Finish and install 1st seat
|
|
|
|
10-04-2016
|
1.50
|
Continue 1st seat and build seat hardware
|
|
|
|
10-03-2016
|
1.50
|
Seats
|
|
|
|
10-02-2016
|
1.00
|
Cut out strips for seats
|
|
|
|
09-29-2016
|
0.50
|
Work on Landing Gear
|
|
|
|
09-28-2016
|
0.50
|
Work on Landing Gear
|
|
|
|
09-26-2016
|
0.50
|
Work on Landing Gear
|
|
|
|
09-24-2016
|
3.00
|
Work on Landing Gear
|
|
|
|
09-23-2016
|
2.00
|
Work on Landing Gear
|
|
|
|
09-21-2016
|
1.50
|
Complete installation of left side Landing Gear fi
|
|
|
|
09-20-2016
|
1.00
|
Complete installation of right side landing gear f
|
|
|
|
09-19-2016
|
0.50
|
Work onLanding gear fittings
|
|
|
|
09-12-2016
|
1.00
|
Work on Landing Gear fittings
|
|
|
|
09-06-2016
|
1.50
|
Continue fully welding fuselage
|
|
|
|
09-05-2016
|
2.00
|
Continue fully welding fuselage
|
|
|
|
09-04-2016
|
3.00
|
Begin fully welding fuselage
|
|
|
|
08-31-2016
|
0.50
|
Drill holes for tubeseal
|
|
|
|
08-29-2016
|
1.00
|
Work on fuel tank, prep for final welding
|
|
|
|
08-24-2016
|
1.50
|
Work on seat adjusters
|
|
|
|
08-23-2016
|
0.75
|
Add last diagonals from station 2 to station 1
|
|
|
|
08-22-2016
|
0.50
|
Work on fuel tank and leading edge center section
|
|
|
|
08-11-2016
|
0.75
|
Begin work on seat adjusters
|
|
|
|
08-10-2016
|
0.75
|
Cut out tabs
|
|
|
|
08-09-2016
|
1.00
|
Add cabin top diagonal. Work on tabs. Work on cent
|
|
|
|
08-08-2016
|
1.50
|
Add 2nd diagonal from Cabin top to station 1, add
|
|
|
|
08-05-2016
|
1.00
|
Add tubes from cabin top to station 1 plus 1 diago
|
|
|
|
08-03-2016
|
1.50
|
Continue work on landing gear to fuselage fittings
|
|
|
|
08-01-2016
|
0.75
|
Continue work on landing gear to fuselage fittings
|
|
|
|
07-31-2016
|
1.00
|
Cleaned up 1st four landing gear fuselage fittings
|
|
|
|
07-28-2016
|
1.50
|
Bend and tack lower longerons to station 1. work o
|
|
|
|
07-27-2016
|
1.50
|
Add diagonals from upper to lower longerons for st
|
|
|
|
07-26-2016
|
0.50
|
Begin cutting out landing gear fuselage fittings
|
|
|
|
07-26-2016
|
1.50
|
Add diagonals from upper to lower longerons for st
|
|
|
|
07-20-2016
|
1.00
|
Add diagonals from upper to lower longerons for st
|
|
|
|
07-20-2016
|
1.50
|
Add cross braces to station 1. Add diagonals from
|
|
|
|
07-19-2016
|
1.00
|
Build station 1 on bench and fully weld
|
|
|
|
07-18-2016
|
1.50
|
complete diagonals between bottom longerons
|
|
|
|
07-16-2016
|
1.00
|
Add diagonals from upper to lower longerons for st
|
|
|
|
07-11-2016
|
1.00
|
Add diagonals from upper to longer longerons for s
|
|
|
|
07-10-2016
|
1.50
|
Complete diagonals between bottom longerons
|
|
|
|
07-09-2016
|
1.50
|
Cut all remaining diagonals for tail section
|
|
|
|
07-04-2016
|
2.50
|
Add diagonals fron station 3 to station 4
|
|
|
|
07-03-2016
|
1.50
|
Tack in station 4
|
|
|
|
07-02-2016
|
1.00
|
Install upper Longerons
|
|
|
|
07-01-2016
|
1.00
|
Bend Longerons and tack in tail post
|
|
|
|
06-30-2016
|
1.50
|
Add door diagonals and corner bracing
|
|
|
|
06-25-2016
|
1.00
|
Install spreaders for seat back and panel
|
|
|
|
06-24-2016
|
1.50
|
Build cabin top (with wing mounts)
|
|
|
|
06-23-2016
|
1.50
|
Add cabin uprights - Stations 2 and 3
|
|
|
|
06-21-2016
|
1.50
|
Tack cabin floor spreaders and diagonal
|
|
|
|
06-19-2016
|
1.50
|
Layout fuselage on bench
|
|
|