Powered By Kitlog Pro v2.0
Matt's RV-10 Website
RV-10
Doors/Windows
Work Logs Found:
36
Category Work Time:
83 Hours
Date
Hours
Work Log Summary
Details
07-08-2016
1.50
Windscreen Fairing
Details
07-04-2016
2.00
Windscreen Fairing
Details
07-03-2016
2.00
Windscreen Fairing
Details
07-02-2016
1.00
Windscreen Adhesive
Details
06-28-2016
2.50
Epoxy Door Gaps
Details
06-26-2016
2.00
Left Windows Adhesive
Details
06-25-2016
1.50
Right Window Adhesive
Details
06-19-2016
2.00
Bleed Brakes, Window Preparation
Details
05-19-2016
2.50
Various Tasks
Details
05-18-2016
1.00
Sand and Prime Doors
Details
05-17-2016
2.50
Various Tasks
Details
05-16-2016
6.00
Smooth Prime Doors, Cowl Work
Details
02-07-2016
1.50
Sanded and Added to Door Hinge Covers
Details
02-06-2016
2.00
Fiberglass Hinges
Details
08-23-2015
1.50
Sanded Micro and Paint Hinges
Details
08-22-2015
1.75
Sand and Filler on Doors
Details
08-18-2015
1.00
Sand Filler and Add Filler to Right Cabin Top
Details
08-17-2015
1.00
FIller to Left Cabin Top
Details
08-03-2015
1.00
Build Door Seal Edges
Details
08-02-2015
2.50
Door Windows and Door Gap Fill
Details
08-01-2015
6.00
Left Door Latch Assembly, Fit, and Strut
Details
07-29-2015
1.00
Right Gas Strut Doubler
Details
07-28-2015
2.00
Cabin Pins Block
Details
07-27-2015
4.00
Righr Door Latch Assembly
Details
07-26-2015
3.00
Door Latch
Details
07-25-2015
2.00
Right Door Seal Gap
Details
07-25-2015
1.00
Added to Top of Left Door
Details
07-23-2015
2.00
Left Door Seal
Details
07-22-2015
1.00
Drilled Left Door Hinge
Details
07-21-2015
1.00
Pilot Door Re-Do
Details
07-20-2015
6.00
Trim Doors and Door Hinges
Details
07-19-2015
6.00
Inital Trim of Doors
Details
07-18-2015
2.50
Glue Door Halves
Details
07-12-2015
2.50
Drill Door Shell and Gas Strut Doubler
Details
07-11-2015
2.50
Prepare Door Shells
Details
07-06-2015
2.00
Finishing Kit Arrival and Inventory
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
407
953
Cowling
14
32
Doors
36
83
Doors/Windows
36
83
Elevators
21
48
Empennage
6
16
Firewall Forward
30
70
Fuselage
79
178
Horizontal Stab
16
36
Interior
7
18
Landing Gear
16
40
Miscellaneous
14
28
Rudder
24
46
Tailcone
27
62
Vertical Stabilizer
13
30
Wings
35
101
Wiring
33
82
Copyright © 2001-2024 Matronics. All Rights Reserved.