KitLog pro

Powered By Kitlog Pro v2.0

RANDY'S WEB SITE
Work Logs Found: 17
Category Work Time: 67 Hours
 Date
Hours
Work Log Summary

Details

 10-01-2016
3.00
Set Idle speed and balance carbs
Details

 09-25-2016
4.00
Vernier Rotax Throttle and Choke cables
Details
       

 09-24-2016
1.00
Connected Shroud Hose
Details
       

 09-17-2016
8.00
Fitted and installed Cowl Cooling Duct
Details
       

 09-10-2016
3.00
Installed the Oil Cooler Box assembly
Details
       

 09-03-2016
2.00
Installed Cabin Heat Cable
Details
       

 08-27-2016
4.00
Oil Tank Assembly and Coolant Overflow Bottle
Details
       

 08-20-2016
8.00
Cooler Box assembly and Radiator
Details
       

 08-06-2016
2.00
Installed EGT probes
Details
       

 07-30-2016
4.00
Installed Exhaust Pipes and Muffler
Details
       

 07-16-2016
4.00
Installed Pitot Tube
Details
       

 07-09-2016
2.00
Installed Rectifier Regulator
Details
     

 06-25-2016
4.00
Installed Igniion harness and oil pressure wires
Details
       

 06-18-2016
2.00
Installed Fuel pump and Fuel Return Hoses
Details
     

 06-11-2016
4.00
Mounted Rotax Engine
Details
       

 06-04-2016
8.00
Fitted and installed the FF-1207 Cooling Shroud
Details
       

 05-28-2016
4.00
Battery, Master Relay and Manifold Pressure Sensor
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.