Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
RV-12
Engine
Work Logs Found:
17
Category Work Time:
67 Hours
Date
Hours
Work Log Summary
Details
10-01-2016
3.00
Set Idle speed and balance carbs
Details
09-25-2016
4.00
Vernier Rotax Throttle and Choke cables
Details
09-24-2016
1.00
Connected Shroud Hose
Details
09-17-2016
8.00
Fitted and installed Cowl Cooling Duct
Details
09-10-2016
3.00
Installed the Oil Cooler Box assembly
Details
09-03-2016
2.00
Installed Cabin Heat Cable
Details
08-27-2016
4.00
Oil Tank Assembly and Coolant Overflow Bottle
Details
08-20-2016
8.00
Cooler Box assembly and Radiator
Details
08-06-2016
2.00
Installed EGT probes
Details
07-30-2016
4.00
Installed Exhaust Pipes and Muffler
Details
07-16-2016
4.00
Installed Pitot Tube
Details
07-09-2016
2.00
Installed Rectifier Regulator
Details
06-25-2016
4.00
Installed Igniion harness and oil pressure wires
Details
06-18-2016
2.00
Installed Fuel pump and Fuel Return Hoses
Details
06-11-2016
4.00
Mounted Rotax Engine
Details
06-04-2016
8.00
Fitted and installed the FF-1207 Cooling Shroud
Details
05-28-2016
4.00
Battery, Master Relay and Manifold Pressure Sensor
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
172
949
Avionics
16
56
Empennage
18
143
Engine
17
67
Finish Kit
28
201
Fuselage
52
220
Miscellaneous
11
59
Prop
2
10
Wings
28
193
Copyright © 2001-2024 Matronics. All Rights Reserved.