Daves Sonex Web Site
Work Logs Found: 9
Category Work Time: 30 Hours
 Date
Hours
Work Log Summary

Details

 10-06-2017
4.00
Installed the Throttle.
Details
       

 07-11-2017
2.50
Attached the elevator trim and cable.
Details
       

 05-26-2017
3.75
Install Steering boot and elevator trim cable.
Details
       

 05-25-2017
1.50
Drill and fasten the elevator pushrod.
Details
     

 05-15-2017
4.25
Installed the Aileron and Flaps controls
Details
       

 05-06-2017
4.50
Installed the Control Stick.
Details
       

 10-17-2016
4.00
Build cable adjusters. Install rudder cables.
Details
       

 10-05-2016
1.00
Installed the rudder cables .
Details
       

 09-24-2016
4.25
Make Steering Boot, Elevator pushrod.
Details
       